BETAWe're refining the site during beta testing.UntilShare feedback
Room Decision System

Every comparison, side by side.

Same room, same camera, one variable changed — the whole browsable set, filterable by room.

Comparisons

The options, side by side.

Same room, same camera, one variable changed — so a decision is shown, not just described. Numbered so you can point to one.44 comparisons with named options · 33 visual references36 carry a complete record — every option names who supplies it and carries written guidance, so ELS can quote it today.

Which room are you deciding about?

77 comparisons across 14 rooms — pick one to start.

Each set shows the same room, same camera, with one thing changed — so you are comparing a decision, not browsing pictures. Choose a room above to see its comparisons.

Design intent — subject to feasibility and site measurement; any variation is agreed with you before work continues.

KIT-08DS01

Handle approach

Kitchen
Handle approach — Handleless / recessed (Gola)
Handleless / recessed (Gola)
Best for
A fully handleless look with a continuous horizontal line, and the strongest choice where circulation is tight.
Watch out
The aluminium channel collects dust and grease and must be wiped along its length; a door out of alignment telegraphs down the whole rail.
Cost and scope2
Cost effect
Higher than any pull — the profile, its end caps and the fabrication all add.
Scope effect
Sets a continuous rail across the run, so cabinet heights, filler panels and the profile finish must all coordinate before fabrication.
Handle approach — Integrated edge pull
Integrated edge pull
Best for
A quieter line than a bar pull while keeping a real finger grip.
Watch out
The lip collects grease directly under the hand — the first place a wet kitchen shows wear.
Cost and scope2
Cost effect
Slightly above a bar pull.
Scope effect
Needs consistent door gaps across the run or the shadow line reads uneven.
Handle approach — Integrated J-pull
Integrated J-pull
Best for
A handleless front with nothing to catch on — fingers hook into a J-profile cut into the door's top edge, so the line stays flush without a channel in the carcass.
Watch out
The recess collects dust and grease and needs wiping. On base units the grip is at the top edge and on wall units at the bottom, so the two feel different in use.
Cost and scope2
Cost effect
Above a bar pull; below a gola channel, because nothing changes in the carcass.
Scope effect
The profile is cut into the door at fabrication, so the front material must take a machined edge, and the choice cannot be reversed once the fronts are made.
Handle approach — Bar pull (surface-mounted)
Bar pull (surface-mounted)
Best for
Everyday kitchens where a confident grip matters more than a flush line — and the easiest handle to replace later.
Watch out
Protrudes into circulation; in a galley it catches sleeves and pockets. Screw centres are fixed, so a later swap is limited to the same drilling.
Cost and scope2
Cost effect
The reference point — the least expensive of the six.
Scope effect
Fixes door drilling at carcass stage; changing your mind after fabrication means new fronts.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-07 Cabinet-front surface material

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
LIV-08DS02

Floor finish

Living Room
Floor finish — SPC (stone-plastic composite)
SPC (stone-plastic composite)
Best for
Rooms that need timber's look with real moisture tolerance — the safest of the three for a Sarawak ground floor.
Watch out
The wear layer is thin: deep scratches cannot be sanded out, only replaced. A poorly levelled slab telegraphs through.
Responsible
Specialist trade
Cost and scope2
Cost effect
Lower than tile or timber once laid.
Scope effect
Needs a level, dry slab; screeding and moisture readings belong in the programme before delivery.
Floor finish — Porcelain tile
Porcelain tile
Best for
Wet and high-traffic areas, and any ground floor with a real flood history.
Watch out
Hard and cold underfoot, and grout is the maintenance line — colour choice matters more than most clients expect.
Responsible
Specialist trade
Cost and scope2
Cost effect
Varies widely by format; large formats cost more to lay than to buy.
Scope effect
Sets floor level and threshold details against adjoining rooms; falls and drainage must be resolved first.
Floor finish — Engineered timber
Engineered timber
Best for
Bedrooms and upper floors where warmth matters and water exposure is genuinely low.
Watch out
Real timber moves with humidity; in an unconditioned Sarawak room expect movement at the joints. Not for a ground floor with flood risk.
Responsible
Specialist trade
Cost and scope2
Cost effect
The highest of the three, and the most sensitive to species.
Scope effect
Requires acclimatisation time on site and a decided expansion gap at every perimeter and threshold.

ELS field guidanceSettle before installation day · costly to change later · after WHL-01 Retain / repair / replace

Specialist trade

Request validation
KIT-09DS11

Corner solution

Kitchen
Corner solution — Blind corner shelf
Blind corner shelf
Best for
Accepting a lost corner to keep the budget in the doors and fronts where it shows.
Watch out
The space is genuinely unreachable — it becomes storage nobody uses, which is a real loss in a small kitchen.
Cost and scope2
Cost effect
The least expensive: there is no mechanism.
Scope effect
None beyond honest expectation-setting; decide this deliberately rather than by omission.
Corner solution — Corner carousel (lazy Susan)
Corner carousel (lazy Susan)
Best for
Getting usable access to a blind corner without bespoke joinery.
Watch out
The rotating tray wastes the corner volume it turns in, and heavy items unbalance it.
Cost and scope2
Cost effect
Moderate — a standard fitting.
Scope effect
Sets a minimum corner cabinet width; check the door swing does not foul the adjacent run.
Corner solution — Magic-corner swing-out
Magic-corner swing-out
Best for
Small kitchens where the corner has to earn its volume.
Watch out
The most mechanism in the kitchen, so the most to go wrong; alignment is fussy and service means a specialist.
Cost and scope2
Cost effect
The highest of the three.
Scope effect
Needs a specified opening width and a door front that can carry the pull-out weight.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-01 Kitchen layout

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
WIN-01DS13

Window system

Windows
Window system — Aluminium casement (side-hung)
Aluminium casement (side-hung)
Best for
Maximum ventilation from a given opening — the best airflow of the four.
Watch out
Cannot be left open in rain, and a full sash needs robust hinges in a coastal or humid location.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Needs swing clearance inside or out, and coordination with any security screen.
Window system — Aluminium awning (top-hung)
Aluminium awning (top-hung)
Best for
Rain-prone elevations — it can stay open in a shower, which matters here.
Watch out
Restricts the clear opening, so it ventilates less than a casement of the same size.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Projects outward; check it does not foul walkways, grilles or an adjacent opening.
Window system — Sliding / large glazed
Sliding / large glazed
Best for
Wide openings where a swinging sash has nowhere to go.
Watch out
Only half the opening ever ventilates, and the bottom track collects dirt and needs regular clearing.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate; large spans cost more.
Scope effect
Track drainage must be resolved — a blocked track is a leak path in heavy rain.

One option isn't shown yet — coming soon.

Also part of this decision, not pictured: Keep existing windows · Laminated / performance glazing

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built · after WHL-01 Retain / repair / replace

Supplied and installed by ALUMAX

Request validation
LIV-02DS15

Air-conditioning

Living Room
Air-conditioning — Wall split unit
Wall split unit
Best for
The pragmatic default — simplest to install, service and replace.
Watch out
The wall unit is visible and dictates where furniture can sit; it dates the room faster than the joinery.
Responsible
Specialist trade
Cost and scope2
Cost effect
The least expensive of the three.
Scope effect
Fixes wall position, drainage fall and the pipe route to the condenser — decide before the wall finish.
Air-conditioning — Ceiling cassette
Ceiling cassette
Best for
Even distribution across a square room from a single central point.
Watch out
Needs real ceiling void; it commits the ceiling design and is disruptive to retrofit.
Responsible
Specialist trade
Cost and scope2
Cost effect
Higher than a split.
Scope effect
Ceiling height, void depth and drainage fall must be settled before the ceiling is closed.
Air-conditioning — Concealed ducted / zoned
Concealed ducted / zoned
Best for
Concealing the system entirely across several rooms from one plant location.
Watch out
The most demanding of the three: duct routing, void depth and return-air paths all have to work, and service access must be planned.
Responsible
Specialist trade
Cost and scope2
Cost effect
The highest.
Scope effect
Drives the ceiling design across multiple rooms and must be coordinated with lighting and any structural downstand.

Also part of this decision, not pictured: Fans only / no AC

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built

Specialist trade

Request validation
KIT-02DS16

Kitchen tier ladder

Kitchen
Kitchen tier ladder — Essential
Essential
Best for
A sound, honest kitchen where the budget is better spent on getting the wet zone right than on finish.
Watch out
The specification is decided for you; expect fewer choices in fronts, hardware and internal fittings.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The entry point of the ladder.
Scope effect
Moisture zone still governs — the tier never overrides what a wet area requires.
Kitchen tier ladder — Signature
Signature
Best for
The middle of the ladder, where finish and hardware quality start to show daily.
Watch out
Easy to spend here on what shows and under-specify what does not — the carcass matters more than the front.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Above Essential.
Scope effect
Confirm which upgrades are finish and which are construction; they are not the same decision.
Kitchen tier ladder — Bespoke
Bespoke
Best for
Where the joinery is genuinely bespoke — non-standard dimensions, unusual materials, a specific detail.
Watch out
Bespoke means longer lead time and less margin for a late change; the drawing has to be right.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The top of the ladder.
Scope effect
Requires the fullest drawing set and the earliest freeze on dimensions and appliances.

ELS field guidanceSettle before any quotation · costly to change later · after KIT-01 Kitchen layout

Supplied and installed by ALUMAX

Request validation
KIT-01DS17

Kitchen layout

Kitchen
Kitchen layout — Galley
Galley
Best for
Narrow plans — the most efficient work triangle per square metre.
Watch out
Two people cannot pass comfortably while cooking; door swings at either end will fight the run.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Efficient: less run length than an L or U for the same storage.
Scope effect
Sets a minimum clear width between runs; confirm it before the plan is fixed.
Kitchen layout — L-shaped
L-shaped
Best for
The general-purpose answer — works in most rooms and leaves a natural dining or circulation zone.
Watch out
The corner is dead volume unless a corner solution is specified with it.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Pairs with a corner decision (DS11); leaving that open leaves storage unresolved.
Kitchen layout — Straight
Straight
Best for
Small apartments and utility runs where the kitchen is one wall.
Watch out
Everything competes for one run — sink, hob and fridge crowd each other and prep space suffers.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least run length, so the least cabinetry.
Scope effect
Appliance positions must be settled early; there is no second wall to move something to.
Kitchen layout — U-shaped
U-shaped
Best for
Cooks who want maximum storage and worktop with everything in reach.
Watch out
Needs real floor width; two corners means two corner problems and a closed-in feel in a small room.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The most run length of the four.
Scope effect
Two corner solutions to decide, and the open end must still take a door or circulation.

ELS field guidanceSettle before any quotation · hard to reverse once built

Supplied and installed by ALUMAX

Request validation
KIT-10DS18

Sink-run material

Kitchen
Sink-run material — Aluminium-frame ACP infill
Aluminium-frame ACP infill
Best for
The wet run and the sink base — the case aluminium composite exists for.
Watch out
It is a construction choice, not a finish: it does not change how the kitchen looks, so it is easy to cut and regret.
Cost and scope2
Cost effect
Above board, below honeycomb.
Scope effect
This is the moisture-zone decision the whole kitchen hangs on; settle it before fronts and finishes.
Sink-run material — Aluminium-honeycomb panel
Aluminium-honeycomb panel
Best for
The wettest positions, and where weight matters as well as water.
Watch out
Cut edges and fixings need the right detail; it is not forgiving of on-site improvisation.
Cost and scope2
Cost effect
The highest of the four.
Scope effect
Fixing method and edge treatment must be specified, not left to the installer.
Sink-run material — HPL-faced en636 3 plywood
HPL-faced en636 3 plywood
Best for
A middle path where a timber substrate is wanted and exposure is real but not constant.
Watch out
Grade and glue line vary widely between suppliers — the name on the sheet is not a specification.
Cost and scope2
Cost effect
Between board and ACP.
Scope effect
Requires the actual grade to be named in the specification, not just 'waterproof plywood'.

Not offered here: moisture-resistant board. Under a sink it is the single most common early failure in a Sarawak kitchen — edges swell and the carcass fails from the inside — so board stays on dry runs, away from the sink, the hob and any splash.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-04 Wet and dry kitchen separation

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
WHL-01DS19

Retain / repair / replace

Whole home
Retain / repair / replace — Repair
Repair
Best for
Sound construction with surface damage — the fault is cosmetic, not structural.
Watch out
Repair reveals its own scope once opened; budget for a finding, not just the visible fault.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Lower than replacement, but less predictable.
Scope effect
Needs a hold point after opening up, so the decision can change on evidence.
Retain / repair / replace — Upgrade
Upgrade
Best for
Improving something that works — better performance without full replacement.
Watch out
The temptation is to upgrade what is visible rather than what fails; check the reasoning.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Between repair and replace.
Scope effect
Confirm the upgrade is compatible with what is retained around it.
Retain / repair / replace — Replace
Replace
Best for
Where the element has failed or will fail within the life of the renovation.
Watch out
Replacement pulls in the adjoining trades — you rarely replace one thing on its own.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The highest of the four.
Scope effect
Sequencing matters: identify which trades follow, and in what order.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before any quotation · hard to reverse once built

Coordinated by ELS

Plan with ELS
OPO-03DS20

Glazing transparency

Between rooms
Glazing transparency — Clear
Clear
Best for
Borrowing light and keeping sightlines — the most generous option spatially.
Watch out
No privacy at all, and it shows everything on both sides, including the mess.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive glass.
Scope effect
Decide manifestation or a visual cue at eye level so the pane reads as glass.
Glazing transparency — Opaque
Opaque
Best for
Privacy while still passing light — bathrooms, bedrooms, anywhere a sightline is unwanted.
Watch out
Blocks the view entirely, so the borrowed-light benefit is the only one left.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Confirm which side the finish faces and how it cleans.
Glazing transparency — Reeded
Reeded
Best for
Softening a sightline without losing the sense of light or depth — the middle answer.
Watch out
Distortion depends on distance; at close range it obscures far less than clients expect.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Above clear glass.
Scope effect
Reed direction is a design decision and should be drawn, not left to the installer.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after OPO-01 Partition operation

Supplied and installed by ALUMAX

Request validation
OPO-01DS21

Partition operation

Between rooms
Partition operation — Adjustable
Adjustable
Best for
Rooms whose use changes through the day — the most flexible of the three.
Watch out
Flexibility costs mechanism, and a mechanism used daily is a maintenance item.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The highest.
Scope effect
Needs a decided parked position and clearance for it, or the flexibility is theoretical.
Partition operation — Fixed
Fixed
Best for
A permanent separation where the layout is settled.
Watch out
It is a wall: changing your mind later is construction, not adjustment.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive.
Scope effect
Confirm ventilation and light are still resolved on both sides.
Partition operation — Sliding
Sliding
Best for
Closing a space occasionally without giving up the opening permanently.
Watch out
The panel has to go somewhere — a pocket needs wall depth, a surface track shows.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Decide pocket versus surface track early; a pocket is a structural decision.

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built

Supplied and installed by ALUMAX

Request validation
KIT-03DS22

Island vs peninsula

Kitchen
Island vs peninsula — Island
Island
Best for
Rooms with genuine circulation space on all four sides.
Watch out
Clearance is the whole question; an island in a room that cannot take it makes the kitchen worse, not better.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The most, especially if services run to it.
Scope effect
Any sink or hob in the island means plumbing or ducting through the floor — a construction decision, not a layout one.
Island vs peninsula — None
None
Best for
Small kitchens where the floor is worth more than the extra worktop.
Watch out
Loses the social centre an island gives; the run does all the work.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
None.
Scope effect
Prep space must be found in the run instead — check it is adequate.
Island vs peninsula — Peninsula
Peninsula
Best for
Getting most of an island's benefit where the floor cannot take a free-standing one.
Watch out
One end is fixed, so circulation only improves on three sides.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Between none and an island.
Scope effect
The junction with the run needs a decided detail, and services still route through the connected side.

ELS field guidanceSettle before any quotation · hard to reverse once built · after KIT-01 Kitchen layout

Supplied and installed by ALUMAX

Request validation
KIT-12DS27

Wall-cabinet opening

Kitchen
Wall-cabinet opening — Hinged doors
Hinged doors
Best for
The default — simplest, cheapest and easiest to service.
Watch out
The open door sits at head height over a work zone.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive.
Scope effect
Swing direction should be drawn against the work sequence, not chosen on site.
Wall-cabinet opening — Lift-up (stay-open)
Lift-up (stay-open)
Best for
A clean opening above a work zone with nothing at head height.
Watch out
Gas stays are a wear part and a heavy front will drift as they age.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Higher.
Scope effect
Requires clear headroom and a decision on strut serviceability.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-11 Wall-cabinet height

Wall-cabinet opening — comparison sheet
Reference sheet — not a selectable option

Supplied and installed by ALUMAX

Request validation
WRD-01DS29

Wardrobe door type

Wardrobe
Wardrobe door type — Open
Open
Best for
Dressing rooms and dry, dust-free bedrooms where access speed matters.
Watch out
In a humid Sarawak bedroom an open wardrobe gives clothes no protection from dust or airborne moisture.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive.
Scope effect
Ventilation and dust become the room's problem; consider what sits opposite.
Wardrobe door type — Sliding
Sliding
Best for
Tight bedrooms where a swing door has nowhere to go.
Watch out
Only half the wardrobe is ever open, and the bottom track collects dust; you lose internal depth to the track.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Track type and internal depth loss must be settled before the internal layout.
Wardrobe door type — Swing
Swing
Best for
Full access to the whole interior at once — the best view of what you own.
Watch out
Needs clear floor in front; in a small bedroom the swing competes with the bed.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive of the closed options.
Scope effect
Swing clearance must be drawn against the furniture layout, not assumed.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later

Supplied and installed by ALUMAX

Request validation
BTH-01DS30

Vanity tier ladder

Bathroom
Vanity tier ladder — Essential
Essential
Best for
A sound vanity where the money is better spent on getting the wet construction right.
Watch out
Fewer choices in front finish and hardware; the carcass material still has to suit a bathroom.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The entry point of the ladder.
Scope effect
Moisture zone governs regardless of tier — a vanity carcass is a wet-zone decision.
Vanity tier ladder — Signature
Signature
Best for
Where the vanity is a visible part of the bathroom rather than just storage.
Watch out
Easy to upgrade the front and leave the carcass and hardware under-specified.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Above Essential.
Scope effect
Separate the finish upgrade from the construction requirement; they are different decisions.
Vanity tier ladder — Bespoke
Bespoke
Best for
Non-standard widths, an unusual basin, or a detail that no standard unit gives.
Watch out
Longer lead time and no margin for a late basin change.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The top of the ladder.
Scope effect
Basin and tap must be selected before fabrication — the cut-out is not adjustable afterwards.

ELS field guidanceSettle before any quotation · costly to change later

Supplied and installed by ALUMAX

Request validation
LIV-07DS32

Feature shelving

Living Room
Feature shelving — Deep
Deep
Best for
Storing real objects — books, boxes, equipment — rather than styling pieces.
Watch out
Deep shelves throw a shadow and read heavy; the back becomes dead storage.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Higher — more material.
Scope effect
Fixing must suit the load; a deep shelf carrying books is a structural fixing.
Feature shelving — Feature
Feature
Best for
Where the shelving is the composition, not just storage.
Watch out
It must be styled to work, which is a commitment the client has to want.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Higher.
Scope effect
Lighting and backing finish become part of the decision.
Feature shelving — Slim
Slim
Best for
A light visual line where the shelf holds a few pieces.
Watch out
It will not take books or heavy objects — be honest about intended use.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive.
Scope effect
Confirm the intended load before the fixing is chosen.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after LIV-03 TV wall composition

Supplied and installed by ALUMAX

Request validation
LIV-03DS33

TV wall composition

Living Room
TV wall composition — Console
Console
Best for
The simplest answer — a low unit that can move or be replaced.
Watch out
Cables are visible unless managed, and the wall above stays unresolved.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive.
Scope effect
Socket and cable positions still need deciding, even for a loose unit.
TV wall composition — Console panel
Console panel
Best for
Anchoring the TV to a panel while keeping the storage low and light.
Watch out
The panel width has to relate to the TV and the room, or it reads accidental.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
TV size and mount height must be fixed before the panel is made.
TV wall composition — Full wall
Full wall
Best for
Making the whole wall one designed element with everything concealed.
Watch out
It commits the wall — a later TV size change or a moved socket is joinery work.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The highest.
Scope effect
Cable routes, sockets and ventilation must all be resolved at carcass stage.

ELS field guidanceSettle before walls close (first fix) · costly to change later

Supplied and installed by ALUMAX

Request validation
OFF-01DS34

Office desking layout

Office

Shown in a commercial workplace — the same layout decision applies to a home office at smaller scale.

Office desking layout — Bench
Bench
Best for
Dense teams that collaborate constantly — the most people per square metre.
Watch out
No acoustic or visual separation; concentration work suffers without a quiet area elsewhere.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The most efficient per person.
Scope effect
Power and data routing along the bench must be planned, plus a separate quiet space.
Office desking layout — Cluster
Cluster
Best for
Teams that work in small groups — a balance of contact and separation.
Watch out
Circulation between clusters eats floor area; the plan needs checking, not assuming.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Cable routing to each cluster is a separate run; confirm floor or ceiling delivery.
Office desking layout — Linear
Linear
Best for
Narrow plans and along-the-wall arrangements.
Watch out
Everyone faces the same way — it can read institutional without relief.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Efficient in a narrow room.
Scope effect
Wall-mounted power is fixed early; changing the run later is rewiring.

ELS field guidanceSettle before any quotation · costly to change later

Supplied and installed by ALUMAX

Request validation
COM-01DS36

Commercial space conversion

Commercial space
Commercial space conversion — Operational
Operational
Best for
Businesses whose margin depends on how the back works, not how the front looks.
Watch out
The customer-facing impression stays as-is, which may undercut the operational gain.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Concentrated out of sight.
Scope effect
Sequence against trading hours; operational work is harder to phase around a live business.
Commercial space conversion — Shell services
Shell services
Best for
Getting the base right — services, envelope, compliance — before any fit-out.
Watch out
It looks like nothing was done, which is hard for a client to see value in.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Foundational rather than visible.
Scope effect
Everything downstream depends on this being complete; it sets the programme.
Commercial space conversion — Turnkey
Turnkey
Best for
A single coordinated scope from shell to opening.
Watch out
The largest single commitment, and it needs the fullest documentation before work starts.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The highest.
Scope effect
Requires the complete drawing and trade-scope set up front; this is the most coordination-heavy option.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before any quotation · hard to reverse once built

Coordinated by ELS

Plan with ELS
OPO-02DS45

Interior door operation

Between rooms
Interior door operation — Offset pivot
Offset pivot
Best for
A wide or heavy leaf where a standard hinge would struggle.
Watch out
Floor and head fixings must be right; adjustment is less forgiving than a hinge.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Higher.
Scope effect
Floor finish and threshold have to accommodate the pivot fixing.
Interior door operation — Pocket
Pocket
Best for
Reclaiming the floor a swing would use — the best answer in a tight plan.
Watch out
The wall must be able to take a pocket; services in that wall have to move, and a stuck pocket door is awkward to service.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The highest, because it is construction as well as hardware.
Scope effect
A structural and services decision, not a door choice — resolve before the wall is built.
Interior door operation — Surface sliding
Surface sliding
Best for
A sliding door without opening up the wall.
Watch out
The door and track are visible, and the wall beside it cannot be used.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Needs a clear parking wall the full door width, with nothing mounted on it.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built

Supplied and installed by ALUMAX

Request validation
FTW-01DS46

Hidden flush-door finish

Feature Wall
Hidden flush-door finish — Oak veneer
Oak veneer
Best for
A warm continuous surface where grain continuity hides the opening.
Watch out
Grain matching across a door line needs sequencing at the factory, not on site.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Higher.
Scope effect
Veneer sequencing must be specified; a standard order will not match.
Hidden flush-door finish — Paint matched
Paint matched
Best for
The simplest concealment — the door reads as wall.
Watch out
Any movement or settlement shows at the joint, and touch-up paint rarely matches exactly.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive of the five.
Scope effect
Requires a decided shadow gap or flush tolerance the painter can actually hold.
Hidden flush-door finish — Sintered stone
Sintered stone
Best for
A hard, wipeable feature wall where the door is part of a stone-faced plane.
Watch out
Weight is the issue — the leaf and its hardware must be specified for it.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The highest.
Scope effect
Hardware must be sized for the leaf weight; this is an engineering check, not a preference.
Hidden flush-door finish — Wallpaper mural
Wallpaper mural
Best for
A graphic wall where the image should run across the opening.
Watch out
The mural must be hung with the door line planned into it; a repair means re-hanging a section.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
The door position must be final before the mural is ordered and set out.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after OPO-02 Interior door operation

Supplied and installed by ALUMAX

Request validation
LIV-09DS47

Paint system & sheen

Living Room

Shown on a bare wall rather than a styled feature wall, so the sheen is what you compare.

Paint system & sheen — Acrylic matte
Acrylic matte
Best for
Walls where a flat, non-reflective surface hides minor unevenness.
Watch out
The least scrubbable — marks in a circulation zone will show and touch-up flashes.
Responsible
Specialist trade
Cost and scope2
Cost effect
The reference point.
Scope effect
Best kept away from wet areas and high-touch surfaces.
Paint system & sheen — Mineral limewash
Mineral limewash
Best for
A soft, breathable finish with visible depth and movement.
Watch out
It is a texture, not just a colour — application skill decides the result, and touch-up is difficult.
Responsible
Specialist trade
Cost and scope2
Cost effect
Higher, and the cost is in application.
Scope effect
Requires a competent applicator and a sample panel signed off before the room is done.
Paint system & sheen — Satin acrylic
Satin acrylic
Best for
A durable, wipeable general-purpose finish for busy rooms.
Watch out
The sheen shows wall unevenness that a matte finish would hide.
Responsible
Specialist trade
Cost and scope2
Cost effect
Moderate.
Scope effect
Substrate preparation matters more than with a matte finish.
Paint system & sheen — Semi-gloss enamel
Semi-gloss enamel
Best for
Trim, doors and anywhere that takes hands and cleaning.
Watch out
Unforgiving of surface defects and brush marks; the higher the sheen, the more it shows.
Responsible
Specialist trade
Cost and scope2
Cost effect
Higher.
Scope effect
Preparation standard must be agreed — this finish exposes it.
Paint system & sheen — Washable eggshell
Washable eggshell
Best for
The pragmatic middle for family rooms — cleanable without a shine.
Watch out
Not fully scrubbable despite the name; check the manufacturer's actual claim.
Responsible
Specialist trade
Cost and scope2
Cost effect
Moderate.
Scope effect
Confirm the cleaning expectation with the client so the finish is not blamed later.

ELS field guidanceNo fixed moment — a finish you can change later · easy to change later

Specialist trade

Request validation
LIV-10DS49

Visible acoustic treatment

Living Room
Visible acoustic treatment — Fabric panels
Fabric panels
Best for
The most absorption per area — rooms with a real echo problem.
Watch out
Fabric collects dust and, in a humid room, needs to be a material that tolerates it.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate.
Scope effect
Panel positions should follow the reflection points, not just the composition.
Visible acoustic treatment — PET felt
PET felt
Best for
A durable, wipeable absorber that can also be a graphic element.
Watch out
Absorbs a narrower range than fabric over a cavity — good for speech, less for low frequencies.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate.
Scope effect
Fixing and joint detail are visible; they need drawing.
Visible acoustic treatment — Timber slats
Timber slats
Best for
Where the room needs to look warm and calm as much as sound better.
Watch out
Absorption depends entirely on the backing behind the slats — slats alone do very little.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Higher.
Scope effect
The backing material is the acoustic decision; specify it, not just the slats.

ELS field guidanceNo fixed moment — a finish you can change later · easy to change later

Coordinated by ELS

Plan with ELS
KIT-13DS50

Cabinet-front surface grade

Kitchen

Shown on a wardrobe run — the front grade is the same decision on kitchen cabinetry.

Cabinet-front surface grade — Essential
Essential
Best for
A sound front where the budget is better placed in the carcass and the wet run.
Watch out
Edge treatment is where a lower grade shows first, especially near heat and steam.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The entry point.
Scope effect
Edge detail should still be specified — it is the failure point, not the face.
Cabinet-front surface grade — Signature
Signature
Best for
Where the fronts are handled daily and seen constantly.
Watch out
Easy to buy a better face and keep the same edge; check both moved.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Above Essential.
Scope effect
Confirm the edge specification moved with the face.
Cabinet-front surface grade — Bespoke
Bespoke
Best for
A specific colour, texture or material a standard range does not carry.
Watch out
Lead time and replacement: a damaged bespoke front is not a stock item.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The top of the ladder.
Scope effect
Order a spare front at the time of manufacture if the finish is not stocked.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-07 Cabinet-front surface material

Cabinet-front surface grade — comparison sheet
Reference sheet — not a selectable option

Supplied and installed by ALUMAX

Request validation
OPO-04DS51

Opening-hardware close-up

Between rooms

Shown on an interior door — the same hardware is specified across openings.

Opening-hardware close-up — Lever mortise
Lever mortise
Best for
The everyday interior door — familiar, serviceable, inexpensive.
Watch out
Finish wears at the hand; a cheap plating goes first.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The least expensive.
Scope effect
Handing and backset need confirming before the door is machined.
Opening-hardware close-up — Pull deadbolt
Pull deadbolt
Best for
Entry doors where security and a deliberate gesture both matter.
Watch out
Two separate items to align and finish-match.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Moderate.
Scope effect
Both must be set out on the same drawing or they will not align.
Opening-hardware close-up — Smart lock
Smart lock
Best for
Shared or rented access where keys are the actual problem.
Watch out
It has a battery and firmware — it is a maintained device, not a fitting. Plan for a mechanical override.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The highest.
Scope effect
Confirm the door thickness and prep the lock requires, plus a power and override plan.

ELS field guidanceSettle before installation day · easy to change later · after OPO-02 Interior door operation

Supplied and installed by ALUMAX

Request validation
LIV-04DS53

Lighting levels — Muji Japandi

Living Room
Lighting levels — Muji Japandi — Essential
Essential
Best for
A calm, even wash consistent with the style's restraint.
Watch out
One layer only — no accent, so the room reads flat after dark.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The entry point.
Scope effect
Circuit and switch positions still need deciding at first fix.
Lighting levels — Muji Japandi — Signature
Signature
Best for
Adding a second layer so the room changes between day and evening.
Watch out
More circuits means more switching; the control plan has to stay simple or the room is annoying to use.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Above Essential.
Scope effect
Switching and dimming must be planned at first fix, not added later.
Lighting levels — Muji Japandi — Bespoke
Bespoke
Best for
Where lighting is doing real work — highlighting material, texture and joinery.
Watch out
The most coordination with ceiling and joinery; a late change is disruptive.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The top of the ladder.
Scope effect
Ceiling, joinery and electrical set-out must be coordinated together before first fix.

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built · after LIV-01 Design language

Coordinated by ELS

Plan with ELS
LIV-05DS54

Lighting levels — Cream Luxury

Living Room
Lighting levels — Cream Luxury — Essential
Essential
Best for
A warm, even base consistent with the style's softness.
Watch out
A single layer flattens the material depth this style depends on.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The entry point.
Scope effect
Circuit and switch positions still need deciding at first fix.
Lighting levels — Cream Luxury — Signature
Signature
Best for
A second layer so the finishes read after dark as well as by day.
Watch out
More circuits, more switching — keep the control plan legible.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Above Essential.
Scope effect
Switching and dimming planned at first fix.
Lighting levels — Cream Luxury — Bespoke
Bespoke
Best for
Lighting that models the material — the point of this style.
Watch out
The most coordination with ceiling and joinery; late changes are disruptive.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The top of the ladder.
Scope effect
Ceiling, joinery and electrical set-out coordinated together before first fix.

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built · after LIV-01 Design language

Coordinated by ELS

Plan with ELS
LIV-06DS55

Lighting levels — Simple Modern Minimalist

Living Room
Lighting levels — Simple Modern Minimalist — Essential
Essential
Best for
Clean, even light that suits a minimal room.
Watch out
One layer leaves a minimal room feeling stark after dark.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The entry point.
Scope effect
Circuit and switch positions decided at first fix.
Lighting levels — Simple Modern Minimalist — Signature
Signature
Best for
A second layer to give a spare room some depth in the evening.
Watch out
Fittings are visible in a minimal room — the fitting choice is part of the design.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Above Essential.
Scope effect
Fitting selection and set-out must be drawn, not left to the electrician.
Lighting levels — Simple Modern Minimalist — Bespoke
Bespoke
Best for
Concealed and integrated light where fittings should not read at all.
Watch out
Integration means joinery and ceiling coordination, and no room for a late move.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The top of the ladder.
Scope effect
Requires the fullest coordination set before first fix.

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built · after LIV-01 Design language

Coordinated by ELS

Plan with ELS
OFF-02DS56

Lighting levels — Executive Modern Office

Office

Shown in a commercial meeting room — the lighting levels are the same decision at home-office scale.

Lighting levels — Executive Modern Office — Essential
Essential
Best for
Meeting the working light level a desk needs, simply.
Watch out
Uniform light only; no relief between work and meeting zones.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The entry point.
Scope effect
Confirm the level suits the actual task, not just the area.
Lighting levels — Executive Modern Office — Signature
Signature
Best for
Separating work light from circulation and meeting areas.
Watch out
Zoning needs a control plan people can actually use.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Above Essential.
Scope effect
Zoning and switching must map to how the office is used.
Lighting levels — Executive Modern Office — Bespoke
Bespoke
Best for
Where lighting supports brand and client-facing impression as well as work.
Watch out
The most coordination with ceiling, joinery and AV.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The top of the ladder.
Scope effect
Ceiling services, joinery and lighting coordinated as one set-out.

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built · after LIV-01 Design language

Coordinated by ELS

Plan with ELS
DS69

Backsplash exposure zoning

Visual reference · named options coming soonKitchen
Backsplash exposure zoning — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS71

Backsplash coverage

Visual reference · named options coming soonKitchen
Backsplash coverage — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS72

Backsplash detailing

Visual reference · named options coming soonKitchen
Backsplash detailing — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS74

Worktop edge and termination

Visual reference · named options coming soonKitchen
Worktop edge and termination — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS75

Sink format and installation

Visual reference · named options coming soonKitchen
Sink format and installation — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS76

Sink support and leak protection

Visual reference · named options coming soonKitchen
Sink support and leak protection — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS78

Appliance fit and ventilation

Visual reference · named options coming soonKitchen
Appliance fit and ventilation — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS79

Appliance ergonomic placement

Visual reference · named options coming soonKitchen
Appliance ergonomic placement — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS80

Sink · bin · dishwasher flow

Visual reference · named options coming soonKitchen
Sink · bin · dishwasher flow — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS87

Wardrobe capacity allocation

Visual reference · named options coming soonWardrobe
Wardrobe capacity allocation — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS92

Wardrobe corners, ends and overheads

Visual reference · named options coming soonWardrobe
Wardrobe corners, ends and overheads — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS95

Vanity form and floor clearance

Visual reference · named options coming soonBathroom
Vanity form and floor clearance — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS96

Basin, trap and drawer coordination

Visual reference · named options coming soonBathroom
Basin, trap and drawer coordination — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS99

Entry drop zone and storage

Visual reference · named options coming soonEntrance
Entry drop zone and storage — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS102

Desk depth, monitor position, power and cables

Visual reference · named options coming soonOffice
Desk depth, monitor position, power and cables — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS106

Commercial load, locks, access and replaceable parts

Visual reference · named options coming soonCommercial space
Commercial load, locks, access and replaceable parts — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS108

Front construction, coating and cleanability

Visual reference · named options coming soonAny cabinet
Front construction, coating and cleanability — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS109

Edge sealing and visible edge quality

Visual reference · named options coming soonAny cabinet
Edge sealing and visible edge quality — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS04A

Living Lighting Scheme

Visual reference · named options coming soonLiving Room
Living Lighting Scheme — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS05A

Cladding Material

Visual reference · named options coming soonFeature Wall
Cladding Material — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS06A

Stair Balustrade Infill

Visual reference · named options coming soonStaircase
Stair Balustrade Infill — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS07A

Tile Material

Visual reference · named options coming soonFeature Wall
Tile Material — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS07B

Tile Format

Visual reference · named options coming soonFeature Wall
Tile Format — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS10A

Kitchen Cabinet Access Method

Visual reference · named options coming soonKitchen
Kitchen Cabinet Access Method — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
KIT-14DS10B

Kitchen internal storage configuration

Kitchen
Kitchen internal storage configuration — Adjustable shelves
Adjustable shelves
Best for
Tall and base cabinets holding tall or irregular items, where flexibility over the years matters more than reach.
Watch out
In a deep base cabinet, shelves swallow what is at the back. Shelf pins are the weak point, and a loaded shelf sags over a wide span.
Cost and scope2
Cost effect
The least expensive — the reference point.
Scope effect
None significant; shelves can be moved or added later without touching the carcass.
Kitchen internal storage configuration — Full-extension trays
Full-extension trays
Best for
Deep base cabinets — the back becomes as reachable as the front, so pots and stacks stop hiding.
Watch out
The runners take width and depth from the carcass, and they are the wear part; a tray behind a door needs the door open first, so a drawer front is usually the better pairing.
Cost and scope2
Cost effect
Higher — a pair of runners and a tray per pull-out.
Scope effect
Runner load rating and tray depth are fixed at carcass stage, because the carcass is drilled for them.
Kitchen internal storage configuration — Inner drawers
Inner drawers
Best for
A second tier behind one front — cutlery, spices and utensils in fixed lanes without adding a door or drawer face to the elevation.
Watch out
Two actions to reach the inner drawer, and the internal height is split, so tall items no longer fit in that cabinet.
Cost and scope2
Cost effect
Higher — a drawer box and its runners for each inner drawer.
Scope effect
Internal heights are planned against what goes where, and fixed before fabrication.
Kitchen internal storage configuration — Vertical dividers
Vertical dividers
Best for
Trays, chopping boards and baking sheets stored on edge — visible and reachable in a narrow cabinet.
Watch out
Only for flat items; a divided cabinet is single-purpose and cannot easily be given another job later.
Cost and scope2
Cost effect
Modest — dividers are simple joinery.
Scope effect
Decide which cabinet takes them before fabrication; the slot spacing is fixed.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-02 Kitchen tier ladder

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
DS73A

Worktop Material

Visual reference · named options coming soonKitchen
Worktop Material — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS73B

Worktop Thickness Edge

Visual reference · named options coming soonKitchen
Worktop Thickness Edge — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS77A

Cooking Energy

Visual reference · named options coming soonKitchen
Cooking Energy — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS77B

Extraction Route

Visual reference · named options coming soonKitchen
Extraction Route — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS94B

Wardrobe Power

Visual reference · named options coming soonWardrobe
Wardrobe Power — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS104B

Display Lighting

Visual reference · named options coming soonDisplay cabinet
Display Lighting — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
KIT-07DS114

Cabinet-front surface material

Kitchen

Shown on a wardrobe run — the front material is the same decision on kitchen cabinetry.

Cabinet-front surface material — HPL
HPL
Best for
Hard-wearing fronts in a working kitchen — the most scratch-resistant of the three.
Watch out
Edge banding is the weak point; a poor edge lifts with steam over time.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate.
Scope effect
Edge treatment must be specified alongside the face material.
Cabinet-front surface material — Pet
Pet
Best for
A clean, low-sheen front with good durability and colour consistency.
Watch out
Shows fingerprints on darker colours; the surface is not repairable if deeply scratched.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate to higher.
Scope effect
Confirm the edge and the face are the same material family.
Cabinet-front surface material — PVC
PVC
Best for
Wrapped profiles and shaped fronts a flat sheet cannot do.
Watch out
In a hot, humid kitchen the wrap can lift at edges and near heat sources over time.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The least expensive of the three.
Scope effect
Keep away from direct heat; confirm the position against the hob and oven.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-02 Kitchen tier ladder

Cabinet-front surface material — comparison sheet
Reference sheet — not a selectable option

Coordinated by ELS

Plan with ELS
KIT-04DS115

Wet and dry kitchen separation

Kitchen
Wet and dry kitchen separation — Dry only
Dry only
Best for
Households that genuinely cook light — no heavy frying, no wok work.
Watch out
A Sarawak household that later cooks heavily will move grease and steam into the living space.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The least expensive — one kitchen.
Scope effect
Be honest about how the household actually cooks; this decision is hard to reverse.
Wet and dry kitchen separation — Wet-dry connected
Wet-dry connected
Best for
Keeping the two zones in contact while separating the heavy work.
Watch out
An open connection still lets grease and steam travel; extraction has to do the work.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate.
Scope effect
Extraction and airflow become the critical decision, not the partition.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before any quotation · hard to reverse once built

Coordinated by ELS

Plan with ELS
KIT-15DS116

Cabinet colour blocking

Kitchen
Cabinet colour blocking — Single tone
Single tone
Best for
A calm, continuous kitchen that lets the worktop or backsplash lead.
Watch out
A long single-tone run can read flat without a change of material somewhere.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The reference point.
Scope effect
None significant — the simplest to specify and to replace a part of.
Cabinet colour blocking — Two-tone block
Two-tone block
Best for
Distinguishing an island or a tall group as its own element.
Watch out
The blocks must relate to the architecture or it reads arbitrary.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Slightly above single-tone.
Scope effect
The elevation should be drawn; this is a composition decision.
Cabinet colour blocking — Two-tone horizontal
Two-tone horizontal
Best for
Grounding the run with a darker base and lifting the uppers.
Watch out
A horizontal split can lower the apparent ceiling in an already low room.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Slightly above single-tone.
Scope effect
Check against ceiling height before committing.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-07 Cabinet-front surface material

Cabinet colour blocking — comparison sheet
Reference sheet — not a selectable option

Coordinated by ELS

Plan with ELS
LIV-01DS117

Design language

Living Room
Design language — Cream luxury
Cream luxury
Best for
Clients who want warmth and softness with a sense of occasion.
Watch out
Pale, warm finishes show marks and need more upkeep in a family home.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Varies by finish, not by the language itself.
Scope effect
Sets the palette for the whole property; changing it later means re-selecting materials across rooms.
Design language — Muji japandi
Muji japandi
Best for
Calm, uncluttered rooms where material and daylight do the work.
Watch out
Restraint only reads as calm when the storage is genuinely sufficient — otherwise it reads bare.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Varies by finish.
Scope effect
Storage has to be resolved early; this style has nowhere to hide clutter.
Design language — Scandinavian
Scandinavian
Best for
Light, practical rooms with a soft palette and honest materials.
Watch out
Very pale timber and textiles can feel cool against Sarawak's light; the tone needs testing on site.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Varies by finish.
Scope effect
Test the timber tone in the actual room before committing across the property.
Design language — Simple-modern minimalist
Simple-modern minimalist
Best for
Clean lines and quiet surfaces where the architecture leads.
Watch out
Minimalism is unforgiving of tolerance — every junction and gap shows.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Varies by finish, but the tolerance demanded raises the fabrication standard.
Scope effect
Requires the tightest set-out and the most drawing of the five.
Design language — Warm-wood modern
Warm-wood modern
Best for
Warmth and grain as the main event, with modern lines.
Watch out
Timber tone must be consistent across suppliers and rooms or the property reads mismatched.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Varies by finish.
Scope effect
Sequence and match timber across rooms as one selection, not room by room.

ELS field guidanceSettle before any quotation · costly to change later

Coordinated by ELS

Plan with ELS
KIT-19DS119

Dry pantry backsplash

Kitchen
Dry pantry backsplash — Geometric tile
Geometric tile
Best for
A dry pantry where the backsplash is the room's one graphic moment.
Watch out
Pattern needs set-out; a pattern cut awkwardly at the ends undoes the effect.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Higher — pattern costs in laying, not just in tile.
Scope effect
Set-out must be drawn from a centre line, and cut positions agreed before laying.
Dry pantry backsplash — Matching oak
Matching oak
Best for
Continuing the joinery material behind the counter for a seamless run.
Watch out
Timber behind a counter is a dry-zone decision only — keep it away from a sink or kettle station.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Higher.
Scope effect
Confirm the zone is genuinely dry; a kettle produces more steam than clients expect.
Dry pantry backsplash — Stacked tile
Stacked tile
Best for
A quiet, orderly backsplash that reads as texture rather than pattern.
Watch out
Stack bond shows any wall out of plumb along the vertical joints.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate.
Scope effect
Wall flatness must be checked before laying — this bond exposes it.
Dry pantry backsplash — Washable paint
Washable paint
Best for
The simplest and most changeable option in a genuinely dry pantry.
Watch out
Not a splash surface; behind a kettle or sink it will not last.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The least expensive.
Scope effect
Only valid where the zone is dry — confirm against the appliance positions.

ELS field guidanceSettle before installation day · costly to change later · after KIT-04 Wet and dry kitchen separation

Dry pantry backsplash — comparison sheet
Reference sheet — not a selectable option

Coordinated by ELS

Plan with ELS
KIT-20DS120

Wet kitchen backsplash

Kitchen
Wet kitchen backsplash — Large-format slab
Large-format slab
Best for
The easiest wet-kitchen surface to keep clean — the fewest joints to hold grease.
Watch out
Handling and cutting are specialist; a single damaged slab is a whole-panel replacement.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
The highest of the four.
Scope effect
Requires a wall flat enough to take a large panel and a decided junction at the worktop.
Wet kitchen backsplash — Small-pattern feature tile
Small-pattern feature tile
Best for
Bringing character to a working wet kitchen.
Watch out
Small tiles mean a lot of grout, and grout plus wok grease is the hardest combination to keep looking new.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Higher — the cost is in laying.
Scope effect
Consider an epoxy or stain-resistant grout; this is the decision that determines how it ages.
Wet kitchen backsplash — Stainless steel
Stainless steel
Best for
Behind a heavy-use hob — the most heat and grease tolerant surface available.
Watch out
Shows every smear and scratches with abrasive cleaning; it reads commercial, which not every client wants.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Higher.
Scope effect
Fixing and edge detail need specifying, and the junction to adjacent finishes must be drawn.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before installation day · costly to change later · after KIT-04 Wet and dry kitchen separation

Wet kitchen backsplash — comparison sheet
Reference sheet — not a selectable option

Coordinated by ELS

Plan with ELS
BTH-02DS121

Bathroom niche lining

Bathroom
Bathroom niche lining — Mosaic
Mosaic
Best for
Lining a niche with a material that turns corners without a cut edge.
Watch out
Many joints inside a permanently wet recess — grout is doing a lot of work here.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate.
Scope effect
Waterproofing behind the niche is the actual decision; the lining is the visible half.
Bathroom niche lining — Single-piece slab
Single-piece slab
Best for
The cleanest niche — almost no joints for water or grime to sit in.
Watch out
Cutting and fitting a single piece is specialist, and a mistake means a new piece.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Higher.
Scope effect
Requires accurate niche dimensions before the slab is cut; the opening must be built to the drawing.

ELS field guidanceSettle before walls close (first fix) · costly to change later

Coordinated by ELS

Plan with ELS
KIT-21DS122

Pantry backsplash tile format

Kitchen
Pantry backsplash tile format — Plain-porcelain tile
Plain-porcelain tile
Best for
A quiet, durable pantry backsplash that is easy to replace in part.
Watch out
Grout still needs a colour decision even in a dry zone.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Moderate.
Scope effect
Specify grout colour with the tile, not after.
Pantry backsplash tile format — Small-pattern feature tile
Small-pattern feature tile
Best for
A pantry that can carry pattern because it is not a heavy cooking zone.
Watch out
More grout lines than a plain tile; in a dry pantry this is acceptable, in a wet kitchen it is not.
Responsible
Coordinated by ELS
Cost and scope2
Cost effect
Higher — the cost is in laying.
Scope effect
Set-out from a centre line; agree cut positions before laying.

One option isn't shown yet — coming soon.

ELS field guidanceSettle before installation day · costly to change later · after KIT-19 Dry pantry backsplash

Pantry backsplash tile format — comparison sheet
Reference sheet — not a selectable option

Coordinated by ELS

Plan with ELS
KIT-05DS23A

Tall-unit and fridge placement

Kitchen
Tall-unit and fridge placement — End group
End group
Best for
Keeping the worktop continuous — one unbroken prep surface, with the fridge and the tall storage standing together at the end nearest the entry or the dining side.
Watch out
The group is deep and tall; at the wrong end it blocks a window or crowds the door. The fridge door needs clear space to open fully against the run's end.
Cost and scope2
Cost effect
Neutral to slightly less — fewer junctions between tall and base cabinetry, so fewer fillers and end panels.
Scope effect
Fixes which end takes the power point and any water point for the fridge; decide with the layout (DS17), because the group's end sets the prep-zone length.
Tall-unit and fridge placement — Split
Split
Best for
Placing the fridge near the entry or dining side and the oven tower near the cooking zone, when one tall group would put one of them in the wrong place.
Watch out
Each tall unit breaks the worktop; two breaks means two shorter prep surfaces, and more end panels and junctions to detail.
Cost and scope2
Cost effect
Slightly more — additional end panels, fillers and junction details.
Scope effect
Two power positions and two junctions to draw; both must be fixed before the carcass order, because a tall unit cannot move once the base run is cut around it.

ELS field guidanceSettle before walls close (first fix) · costly to change later · after KIT-01 Kitchen layout

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
KIT-06DS23B

Tall-group wall integration

Kitchen
Tall-group wall integration — Recessed niche
Recessed niche
Best for
A flush, built-in read where the tall group sits back into the wall plane — the calmest result in a small kitchen where the group's full depth would otherwise intrude.
Watch out
The niche has to exist or be built, which depends on the wall being non-structural or on a pocket being framed. Its dimensions have to be exact; a niche a few centimetres out cannot be fixed with a filler.
Cost and scope2
Cost effect
Higher — builder's work (framing and plastering) before any cabinetry, and the tall group is measured to the niche once it is built.
Scope effect
A first-fix decision: the niche is formed before walls close, and the cabinetry is fabricated to the finished niche. Measuring the cabinetry to a drawing instead of the built niche is where this goes wrong.
Tall-group wall integration — Surface mounted
Surface mounted
Best for
Any wall, no builder's work — the usual approach, and the one that keeps the cabinetry independent of the building.
Watch out
The group's full depth projects into the room; its side is a visible end panel that needs a finish, and the junction with the ceiling needs its own decision (DS26B).
Cost and scope2
Cost effect
The reference point — no wall work.
Scope effect
Nothing beyond the cabinetry; the end-panel finish and the top junction are decided with the fronts.

ELS field guidanceSettle before walls close (first fix) · hard to reverse once built · after KIT-05 Tall-unit and fridge placement

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
KIT-11DS26A

Wall-cabinet height

Kitchen
Wall-cabinet height — Stacked-top box
Stacked-top box
Best for
Using the ceiling height for long-term storage — the top box takes what is used rarely, and the run reads floor to ceiling.
Watch out
The top box is above comfortable reach — storage for a step-ladder. Two boxes stacked show a horizontal joint line unless the fronts are made as one tall door.
Cost and scope2
Cost effect
Higher — a second carcass and a second front per cabinet.
Scope effect
Ceiling height measured at several points along the run, because a ceiling out of level shows at the top box; and a decision on whether fronts are one door or two.
Wall-cabinet height — Standard 720
Standard 720
Best for
Everyday reach — the top shelf usable without a step for most people, with whatever sits above it decided separately.
Watch out
The space above is either wasted or has to be closed; left open it collects dust and, in a wok kitchen, grease.
Cost and scope2
Cost effect
The reference point — one carcass per cabinet.
Scope effect
Decide what happens above at the same time: an open gap, a plasterboard soffit or a scribed infill (DS26B).

One option isn't shown yet — coming soon.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-02 Kitchen tier ladder

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
KIT-16DS26B

Cabinet-to-ceiling junction detail

Kitchen
Cabinet-to-ceiling junction detail — Open gap
Open gap
Best for
A ceiling that is uneven or high, where closing the gap would cost more than it returns — or a kitchen that is not meant to be permanent.
Watch out
The gap collects dust and grease and is awkward to clean, and it reads unfinished in a kitchen that is otherwise fitted.
Cost and scope2
Cost effect
None — nothing is built.
Scope effect
None; it can be closed later with either a soffit or an infill.
Cabinet-to-ceiling junction detail — Plasterboard soffit
Plasterboard soffit
Best for
A painted bulkhead that meets the cabinet top squarely — the fitted read, and a place to run ducting and lighting.
Watch out
Built by a plaster trade before the cabinetry, so the cabinet height has to be known first; a bulkhead built to a drawing with cabinets fitted later can leave a step or a gap.
Cost and scope2
Cost effect
Moderate — a plaster trade's work, priced separately from the cabinetry.
Scope effect
First-fix: framed and skimmed before walls close, with the extraction duct route and any lighting decided at the same time.
Cabinet-to-ceiling junction detail — Scribed infill
Scribed infill
Best for
A filler in the cabinet material cut to the ceiling line, so the run reads as one fitted piece in one finish.
Watch out
A wide infill shows a ceiling that is out of level as a tapering strip; it is cut on site and depends on the fitter's scribing.
Cost and scope2
Cost effect
Moderate — the panel is cabinetry, fitted on site.
Scope effect
Ceiling height measured at several points along the run, and the infill depth decided against the highest and lowest.
Cabinet-to-ceiling junction detail — Shadow reveal
Shadow reveal
Best for
A deliberate recessed line between cabinet top and ceiling — it reads as intended, and it hides a ceiling that is slightly out of level.
Watch out
A reveal is a detail, not a gap: it needs a return panel set back to read as one, and it still collects some dust.
Cost and scope2
Cost effect
Modest — a set-back return panel per cabinet top.
Scope effect
Reveal depth and colour decided with the fronts; the ceiling is usually finished first so the reveal reads against a clean surface.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-11 Wall-cabinet height

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

Plan with ELS
DS28A

Built-in oven placement

Visual reference · named options coming soonKitchen
Built-in oven placement — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS28B

Refrigerator integration

Visual reference · named options coming soonKitchen
Refrigerator integration — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
DS28C

Dishwasher integration

Visual reference · named options coming soonKitchen
Dishwasher integration — options compared side by side

Record still pendingThe comparison is usable now; the supply and ownership record follows with your specification.

Who supplies this is confirmed with your specification — it is not yet stated here.

How this is priced is confirmed after measurement, by whoever supplies it.

Plan with ELS
KIT-17DS123

AquaGlass door finish

Kitchen
AquaGlass door finish — Gloss
Gloss
Best for
The most light a kitchen can return, which is worth most in a room with one window.
Watch out
It mirrors the room, so it shows fingerprints and every uneven door gap along the run.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The highest of the three.
Scope effect
Finish is fixed at fabrication; precision carcass leveling and door gap adjustment must be fixed during final installation so reflections do not read as crooked.
AquaGlass door finish — Metallic
Metallic
Best for
A quieter surface than gloss that still reads as glass, and the most forgiving of the three with daily marks.
Watch out
The metallic texture is directional, so a replacement door years later has to match the run's orientation as well as its colour.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The reference point of the three.
Scope effect
Finish is fixed at fabrication; a later change means new door faces, not a refinish.
AquaGlass door finish — Solid
Solid
Best for
A flat, even colour where the kitchen should recede rather than reflect.
Watch out
A flat surface shows a dent or a scuff more plainly than a broken one does.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Comparable to metallic.
Scope effect
Finish is fixed at fabrication; establishes the base colour batch for any future additions, though without the texture orientation dependencies of metallic.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-02 Kitchen tier ladder

Supplied and installed by ALUMAX

Request validation
KIT-18DS124

AquaGlass wall-cabinet front

Kitchen
AquaGlass wall-cabinet front — Clear display
Clear display
Best for
Display, where what is inside is meant to be seen and kept that way.
Watch out
It is a daily commitment to tidiness, and it is the option most often regretted in a working kitchen.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Comparable to translucent.
Scope effect
Upgraded interior carcass finishes, shelf materials, and lighting routing must be specified and fixed before fabrication, overriding standard defaults.
AquaGlass wall-cabinet front — Opaque
Opaque
Best for
A continuous wall where the cabinetry should not be read as storage at all.
Watch out
Nothing is findable without opening a door, which is the commonest daily annoyance in a deep wall run.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
The reference point.
Scope effect
Fronts are fixed before fabrication; internal storage accessories should be fixed at carcass order to compensate for the blocked visibility.
AquaGlass wall-cabinet front — Translucent
Translucent
Best for
Hiding the contents while keeping the wall light, so a full cabinet still reads as calm.
Watch out
It shows a silhouette, not nothing — a bright interior light makes the contents legible again.
Responsible
Supplied and installed by ALUMAX
Cost and scope2
Cost effect
Above an opaque front.
Scope effect
Interior lighting specifications and cable routing must be fixed before the carcass order, as illumination changes how these fronts read.

ELS field guidanceSettle before cabinets are cut (fabrication) · costly to change later · after KIT-17 AquaGlass door finish

Supplied and installed by ALUMAX

Request validation

Concept renders — a design render, not a photo. Shown to compare options for one decision.

Comparisons — Every Option, Side by Side | ELS