BETAWe're refining the site during beta testing.Until Share feedback
Design studies · concept

Renovation problems across Sarawak.

Worked examples of how ELS's design and coordination approach addresses humidity, flood resilience, mould risk and space planning — the conditions every Sarawak renovation has to survive.

Design studies — hypothetical problems worked through in concept renders, not photographs of the homes described. (A completed client job with a measurable outcome is a Case Study; a delivered job is a Completed Project — see the project library.)

Concept study Wet Kitchen CabinetrySibu, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Sibu Wet Kitchen: Designing Out the Swelling-Board Failure

A common Sibu situation: a wet kitchen built in moisture-resistant particleboard, where heavy wok cooking, daily washing-down and humidity had swollen the base cabinets. The owner wanted a rebuild that would not repeat the same failure.

Proposed resolution: Designed so the wet run has no board carcass to swell
Read the full design study
Concept study Terrace House RenovationSibu, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Sibu Terrace House: A Ventilation-First Plan Against Mould

A long, narrow terrace with a dead-air middle zone — the classic Sarawak condition where trapped heat and humidity grow mould on ceilings and inside closed cabinets.

Proposed resolution: Designed to keep the middle of the house moving air instead of holding it
Read the full design study
Concept study 2-Level Terrace RenovationSibu, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Sibu Terrace: Humidity Control Retrofit

A common Sibu complaint: black mould returning on the ceiling, windows that condensate for much of the year, and stagnant air in the kitchen and bathrooms.

Proposed resolution: Designed so the conditions that breed mould — trapped humid air and cold, condensing surfaces — can be removed at the planning stage
Read the full design study
Concept study Shophouse Kitchen + Wet AreaKuching, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Kuching Shophouse: Flood-Resilient Kitchen

A typical ground-floor, flood-prone shophouse situation: a kitchen where a seasonal flood can destroy appliances and finishes, and the owner wants one designed to survive water of roughly 1.2m with minimal loss.

Proposed resolution: Designed so a flood can become a clean-up rather than a rebuild: the electrics sit above the expected water line, the marine-grade stainless carcass and sealed concrete floor are specified to tolerate floodwater, and appliances lift off their pedestals to be moved out ahead of rising water
Read the full design study
Concept study 2-Bedroom Condominium RenovationSibu, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Sibu Condo: Space Planning for Multi-Use Living

A common small-condo brief (around 900 sqft) that has to work as home office, guest bedroom and storage at once — where the existing layout feels cramped and the owner is unsure about layout and cabinet sizing.

Proposed resolution: Designed so a 900 sqft condo works as home office, guest room and storage at once
Read the full design study
Concept study Bathroom RenovationSibu, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Sibu Bathroom: Planning the Vanity Wall and the Wet Floor Together

A common Sibu bathroom brief: a vanity wall and a shower floor that has to drain, in a small room where the trap, the falls, and the vanity's basin and drawers all depend on one another.

Proposed resolution: Designed so the choices that are hardest to change after tiling, the trap, the falls, and the basin and drawer layout, can be settled on paper first. It is a concept for the reader to react to, not a built result, a quotation or an approval.
Read the full design study
Concept study Living Room RenovationSibu, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Sibu Living Room: One Calm TV Wall, Planned with the Light and the Cooling

A common Sibu living room: a TV wall that has to hold storage, a screen and its cabling, with an air-conditioner, the lighting and the floor all chosen around it.

Proposed resolution: Designed so the TV wall, the cooling and the light can be coordinated on one plan before the ceiling closes, rather than fitted around each other afterwards. It is a concept for the reader to react to, not a built result, a quotation or an approval.
Read the full design study
Concept study Master Bedroom RenovationSibu, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Sibu Master Bedroom: A Wardrobe Wall That Keeps the Room Calm

A common master bedroom brief: a bed, a window and a full wardrobe wall in one room, where the door type decides how much floor stays clear and how the room feels.

Proposed resolution: Designed so the wardrobe door type, the interior and the floor in front of it can be decided together on paper, before the carcass is built. It is a concept for the reader to react to, not a built result, a quotation or an approval.
Read the full design study
Design Studies

Hypothetical technical studies, by design.

They demonstrate ELS methodology on real Sarawak conditions. Completed client work is published separately and is never represented by these studies.

Your project next?

Let's plan your renovation the right way.