BETAWe're refining the site during beta testing.UntilShare feedback
Design studies · concept

Renovation problems acrossSarawak.

Worked examples of how ELS's design and coordination approach addresses humidity, flood resilience, mould prevention and space planning — the conditions every Sarawak renovation has to survive.

Design studies — hypothetical problems worked through in concept renders, not photographs of the homes described. (A completed client job with a measurable outcome is a Case Study; a delivered job is a Completed Project — see the project library.)

Wet Kitchen CabinetrySibu, Sarawak

Sibu Wet Kitchen: Designing Out the Swelling-Board Failure

A common Sibu situation: a wet kitchen built in moisture-resistant particleboard, where heavy wok cooking, daily washing-down and humidity had swollen the base cabinets within two years. The owner wanted a rebuild that would not repeat the same failure.

Proposed resolution: Built so the wet run cannot swell or grow mould
Read the full design study
Terrace House RenovationSibu, Sarawak

Sibu Terrace House: A Ventilation-First Plan Against Mould

A long, narrow terrace with a dead-air middle zone — the classic Sarawak condition where trapped heat and humidity grow mould on ceilings and inside closed cabinets, sometimes within months of a previous renovation.

Proposed resolution: Designed to keep the middle of the house moving air instead of holding it
Read the full design study
2-Level Terrace RenovationSibu, Sarawak

Sibu Terrace: Humidity Control Retrofit

A common Sibu complaint: black mould returning on the ceiling within months of a renovation, windows that condensate for much of the year, and stagnant air in the kitchen and bathrooms.

Proposed resolution: Designed so the conditions that breed mould
Read the full design study
Shophouse Kitchen + Wet AreaKuching, Sarawak

Kuching Shophouse: Flood-Resilient Kitchen

A typical ground-floor, flood-prone shophouse situation: a kitchen where a seasonal flood can destroy appliances and finishes, and the owner wants one designed to survive water of roughly 1.2m with minimal loss.

Proposed resolution: Designed so a flood becomes a clean-up, not a rebuild: the electrics sit above the expected water line, the marine-grade stainless carcass and sealed concrete floor shrug off water, and appliances lift off their pedestals to be moved out ahead of rising water
Read the full design study
2-Bedroom Condominium RenovationSibu, Sarawak

Sibu Condo: Space Planning for Multi-Use Living

A common small-condo brief (around 900 sqft) that has to work as home office, guest bedroom and storage at once — where the existing layout feels cramped and the owner is unsure about layout and cabinet sizing.

Proposed resolution: Designed so a 900 sqft condo works as home office, guest room and storage at once
Read the full design study
Design Studies

Hypothetical technical studies, by design.

They demonstrate ELS methodology on real Sarawak conditions. Completed client work is published separately and is never represented by these studies.

Your project next?

Let's plan your renovation the right way.

Sarawak Renovation Design Studies (Concept) | ELS