Illustrative scenario2-Bedroom Condominium RenovationSibu, Sarawak

Sibu Condo: Space Planning for Multi-Use Living

Scope

Track 02 — Design + Specification

Timeline

2 weeks design, 4 weeks renovation

The Challenge

A common small-condo brief (around 900 sqft) that has to work as home office, guest bedroom and storage at once — where the existing layout feels cramped and the owner is unsure about layout and cabinet sizing.

The Approach

On a brief like this, an ELS Pre-Check typically flags a 'mid-range, 1–3 months' profile and points to Track 02 (Design + Specification): wall-mounted storage, pocket doors for flexibility, multi-purpose built-ins, and a detailed cabinet schedule with exact dimensions and material grades.

The Outcome

Designed so a 900 sqft condo works as home office, guest room and storage at once — wall-mounted and multi-purpose built-ins free up the floor, and a detailed cabinet schedule (exact sizes, material grades) lets contractors quote the same scope and build without guesswork.

Key Lessons

  • A Pre-Check up front means fewer design revisions once drawings begin
  • Clear cabinet schedules eliminate contractor confusion
  • Multi-use spaces need flexible storage — fixed solutions fail
  • Detailed specs attract competitive, comparable quotations
Prepared by George Wong — Founder, ELS by ALUMAXFormer senior research engineer, Fortune 500 · Based in Sibu, Sarawak · Last updated: July 2026

*Illustrative scenario based on conditions ELS by ALUMAX plans for across Sarawak — figures are indicative and not a quotation. We are actively building our project portfolio; named, photographed case studies will follow.

Related case studies

Your project

Ready to start planning yours?

Start Pre-Check
Sibu Condo: Space Planning for Multi-Use Living