Income property
Furnishing plans for rental homes, set by let type, with ALUMAX StayReady
StayReady PlanningSee StayReady PlanningELS plans purpose-fit conversions for existing shoplots, warehouses and industrial buildings. We reorganise customer flow, stock movement, staff operations and building systems before decorative spending — then coordinate the specifications that make the conversion work.
Reuse what works. Repair what is recoverable. Reorganise the operation. Spend where it improves sales, workflow, safety, durability or customer experience.
Not sure the numbers work yet? Run the viability simulator on your own figures first

ELS starts by deciding what to retain, repair, reorganise and selectively upgrade — before any decorative spending.
The whole method in four moves, before the detailed 5R below — the same shell, decided and rezoned, not rebuilt.

The building as found — a shell that works harder than it looks.
Decide what stays before any decorative spending.
Zone by what each part earns; keep customer and stock routes apart.

The same shell — now it sells and operates.
Before / after are the same warehouse — a concept study, not a photograph of a completed project.
Five steps, in order — Retain, Repair, Reorganise, Refocus, Realise. In the fifth, ELS recommends the order of the work and checks the hand-offs set in the commissioned scope.
What existing building elements can stay?
What can be recovered rather than replaced?
How should the operation actually work?
These routes are diagrammed, not described in prose — the plan is the product.
Where should the CAPEX actually go?
Make the retained building look intentional — and build it in the right order.
Execution follows the same disciplined order ELS recommends on its projects — an advisory sequence that flags where trades could clash or paid-for work could be redone.
Directly earns — the customer-facing zone that converts a visit into a sale.
Keeps the business running — stock, picking, staff and delivery.
Non-negotiable — fire, electrical, structural and statutory work.
Lifts perception where a customer sees it — spend after A–C are secured.
Nice to have — a later phase, not this one.
And every existing element gets a disposition — the signature every commercial concept carries:
Fewest steps between arriving and buying.
Built for commercial traffic and Sarawak humidity.
Repeatable systems over one-off bespoke.
Cleanable, serviceable, replaceable in parts.
Every choice read from the customer's side.
A layout a second branch can be built from.
When the look does come, it is applied last: the Corporate & Commercial finish direction — dark timber and stone on sealed plinths, one base metal, privacy glass banded at seated eye level. It is a finish direction here, not one of the five residential design languages. View the corporate finish direction
Seven stages. The detailed method sits behind them, and it is handed over by a person rather than published — because a third of its steps depend on answers your landlord and the fire officer have not given yet.
Headcount, zoning and what the landlord's shell actually provides.
Landlord consent, fit-out permit and fire submission — before anything is ordered.
Shopfront, partitions, furniture and cabling on order the same day.
Strip-out, service tie-ins and anything touching the landlord's systems.
Partitions, ceiling, finishes, joinery and the furniture package.
Fire sign-off, systems tested, and the certificate the tenant cannot open without.
As-builts, warranties, and the record of what must come out at lease end.
Designs and specifies the space, surveys the base build against the lease, coordinates the landlord and fire submissions (made by the appointed consultant, as named in your proposal), and recommends the order of the work across the trades, checking the hand-offs set in the commissioned scope. ELS holds no prices: the figure is the supplier's, after measurement.
Supplies and installs the shopfront, the aluminium and glass, the joinery and the office furniture package — and quotes them, project by project, once the scope is specified.
Owns the shell, the risers and the common areas, grants the fit-out permit, and holds the bond against reinstatement at lease end. What you may change, and what must come out again, is theirs to define — and we record it at the brief, not at handover.
Electrical, network and fire work are by licensed trades appointed separately; ELS coordinates them where commissioned.
Fire and landlord submissions are made by the appointed consultant, as named in your proposal.
ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.
If you are thinking of turning the upper floors of a shoplot into co-living rooms or a small lodge, these are the questions to put to the authorities and to builders first. This is a list of what to ask, not a statement of what the law requires.
The full method — every stage broken into its steps, what gates what, and which items must be ordered on the day the drawings freeze.
Education, healthcare, hospitality, office and retail fit-out — where the conversion method meets each sector's specific technical problems.
Commercial enquiries are taken for Kuching, Samarahan, Sibu, Bintulu and Miri. Other towns are by arrangement.
ELS designs, specifies and coordinates. ALUMAX specifies products, works with selected manufacturing partners, reviews available production quality records and checks supplied products against the confirmed order. ALUMAX manages delivery, installation and product warranty. If you already hold an approved specification, go straight to supply.
ALUMAX is a sibling property (alumax.pro). Prices and product ranges live there.
Commercial conversion scope is quotation-based, confirmed against a measured survey — no rate or total is shown here. ELS designs, specifies and coordinates; ALUMAX supplies and installs its products; appointed specialist trades execute electrical, M&E, structural and statutory work. Images across these pages are concept studies, not photographs of completed projects.
ELS+ launches with two offers, for homeowner and StayReady projects. A commercial project is assessed case by case.
ELS+ is taking a limited number of projects, by assessment.
ELS Bespoke applies to commercial projects that need a solution beyond standard systems. It can be commissioned as a design, or with ELS+ delivery where that is assessed to suit.