Renovation Pre-Check
A free read that routes the project and readies the brief.
Start Pre-CheckOne clear path, whether you buy a single product or run a whole multi-trade renovation. ELS routes the project, plans it, and coordinates it so the rooms, products and trades work from the same information before work begins.
They start earlier — unclear briefs, wrong materials, missing measurements, poor trade coordination, weak quotation control and decisions made too late.
ELS helps make these decisions visible before work begins.
You send what you have, and ELS reads it and decides which service you need.
Send what you have — a floor plan, phone photos of the space, and a rough budget. Sketches and approximate numbers are enough to start.
Work sequence: stage 1
We read it and decide what you actually need. A simple product order goes straight to ALUMAX; a complex or multi-trade project stays with ELS for planning and coordination.
Work sequence: stage 1
What to have ready. None of it has to be final. The Pre-Check walks you through it and saves everything to one brief.
ELS prepares layout, material and product direction, and you approve the design direction before technical work begins.
First, the functional direction. Product already defined? Continue with ALUMAX. Layout or specification still open? Design & Specification. Several trades whose work depends on each other? ELS+. The visual style — one of the five languages, at Essential, Signature or Bespoke — is chosen once that direction is set, not before.
Work sequence: stages 1–2
You sign off the colour, material and layout direction before any technical work begins, so technical work starts from a direction you have confirmed.
Work sequence: stage 2
ELS works out the specification, dimensions and materials by exposure; technical specification approval accepts the documented solution.
ELS works out the specifications, dimensions, material by moisture zone, and the socket, lighting, water-point and appliance positions — the detail an approved specification needs.
Work sequence: stage 3
ALUMAX, your contractors or the ELS+ contract carry out the work as the commissioned service sets, and ELS checks the hand-offs set in the commissioned scope.
ALUMAX supplies and installs the cabinets, doors, windows and office systems; other trades are appointed by you and managed by your nominated main contractor, or delivered by ELS+ when its contract includes them.
Work sequence: stages 5–9
Under ELS+, quality checks are made at the stages set in your proposal and handover records are provided. On design-only projects, your nominated main contractor manages the site, and ELS checks the hand-offs set in the commissioned scope.
Work sequence: stage 10
See how we work: stages, sign-offs and change rules
Early feasibility checks come before the commitments that depend on them. Your approval does not replace the technical checks.
Lead times and response times are set in your written proposal.
Defects and response times are set in your written proposal. A direct ALUMAX order follows ALUMAX's own terms.
The ten-stage work sequence
Four approvals, each with its own meaning
We clarify the brief, review the site, prepare design and specification direction, confirm the scope, then coordinate approved work according to the selected service.
We clarify your space, budget, timeline, concerns and expectations.
We review site dimensions, photos, plans and constraints.
We prepare layout, material and product direction.
We confirm materials, drawings, scope, exclusions and approval requirements.
This is a dependency sequence, not a rigid calendar. Long-lead items can be ordered once the drawings freeze; cutting and fabrication are released only after the site is ready and the final measurements are taken. The ceiling closes only after the concealed services have been inspected and the wet-area test has been accepted. The order of ceiling, tiling and flooring is agreed for each project.
Room needs, budget, what stays, measurements and what is still uncertain are written down.
Hold pointScope assumptions recorded
Layout, palette and functional choices are proposed and their feasibility is checked.
Hold pointYou accept the design direction
Drawings, dimensions, junctions, services and access are worked out so the trades review their interfaces together.
Hold pointCritical technical questions resolved
Work packages, responsibilities and the programme are agreed; purchases are authorised against approved specifications.
Hold pointYour approval recorded
Protection, access and removal are planned; site conditions are investigated.
Hold pointSite conditions accepted, discoveries resolved
Masonry, plumbing, electrical, air-conditioning, framing and backing, as the project needs.
Hold pointInspection before concealment
Waterproofing, tiling, ceilings, flooring and painting, in the agreed order.
Hold pointTests, curing and substrate checks accepted
Cabinetry, stone, glass, metalwork and doors, made and fitted to verified site dimensions.
Hold pointDimensions and interfaces accepted
Sanitary and electrical fittings, appliances, curtains and furniture.
Hold pointInstallation and functional checks complete
Testing, rectification and demonstration; defects, care information and the responsibility record are handed over.
Hold pointHandover accepted, open items documented
| Interface | Planning settles | Procurement covers | Hold point |
|---|---|---|---|
| Bathroom: plumbing, waterproofing and tiling | Drain position, levels, falls, penetrations and waterproofing extent | Drain interfaces, collars, tapes, corners and compatible materials | Before concealment and tiling |
| Kitchen: cabinetry, stone and appliances | Actual appliance models, openings, supports and service access | Cabinet hardware, profiles, worktop details and appliance accessories, complete | Before fabrication or cutting |
| Ceiling: framing, electrical and air-conditioning | Fixtures, ducts, backing, access and servicing space | Access panels, supports, lighting assemblies and controls | Before the ceiling closes |
| Bedroom: wardrobe, floor and ceiling | Finished levels, anchoring, fillers and operating clearances | Tracks and hinges, profiles, caps, feet and the fixing system | Before fabrication |
| Living room: TV wall, equipment and electrical | Mounting, cables, ventilation and removable access | Brackets, cable accessories, service panels and fittings | Before closure |
| Curtains: ceiling, windows and FF&E | Track support, stacking, drop and opening clearances | Track, connectors, brackets, carriers, stops and controls | Before closure or order |
| Lighting: design, electrician and supplier | Appearance, output intent, control and replacement access | LED, profile, diffuser, caps, driver and compatible controls | Before purchase and installation |
Answer a few questions and we'll map your risk level, the right service, and what to prepare — nothing is sent until you choose to.
Or see a sample proposal firstStart from the outcome, not a product list — each goal jumps you to the ELS decision that settles it.
A room is not a pile of products. It is a system of air, water, power, light, openings, surfaces, storage and furniture — resolved together, not chosen one product at a time.
ALUMAX supplies any one of these. ELS decides how all eight work together.Explore the Whole-Room Decision System
From overwhelmed to a defined brief.
Accelerates defining the project — Understand the risks, scope and budget before anyone quotes.
Puts the scope, risks and budget on paper first, so quotations can be compared.
A free read that routes the project and readies the brief.
Start Pre-CheckTwelve Sarawak lifestyles decide which decisions matter most — lifestyle first, style second.
Find your lifestyleWhat to prioritise first, one scope example, the cost categories and a hidden-cost checklist, with two planning estimates for a worked terrace.
See the budget guideFour services, with fees published where ELS has set them, so the paid line is clear from the start.
Compare ELS servicesFrom a brief to a resolved room.
Accelerates designing the room — Resolve the whole room — layout, style and every decision — not one product at a time.
Narrows the choices to the decisions that matter for your room.
Mark the whole-room scope; produce a coordinated brief, never a self-serve total.
Build the room scopeRoom decisions compared on use, cost direction and appearance where published; some need consultation.
Explore the decisionsFive residential design languages — curated colour & material systems, adapted to your actual property.
Browse design languagesA filterable reference of concept images — a starting point, not the design itself.
Explore the libraryEvery choice settled on paper, for procurement and trade coordination.
Accelerates specifying the build — Decisions settled on paper in one specification — subject to site verification, specialist design and any required approvals.
Settles the decisions a render leaves open, before anything is ordered.
The room specified — layout, materials by moisture zone, M&E, the lot.
See what the spec includesThe 11 documents ELS produces — elevations, M&E overlay, material schedule.
Review sample deliverables9 illustrative design documents and 4 optional ELS+ records, showing what ELS prepares for the trades.
Open the specimen packOne plan, a recommended order, hand-offs checked.
Accelerates coordinating the build — Trades work to one approved scope, with a recommended sequence that avoids doubling back.
Helps identify and manage trade clashes before they become larger problems.
One masterplan, built in reversibility order. Plan phases to reduce avoidable demolition and repeated work.
See the phasing planELS recommends trade dependencies and tracks agreed interfaces and checkpoints.
See coordinationWhat must be true on site before ALUMAX supplies and installs.
Check site readinessThe 13-point capture checklist, recorded across the ten stages.
See the capture standardThe render, compared with what was built.
Accelerates verifying the result — Compare approved design intent, documented changes and verified completed work.
Helps show where the built room differs from the render, and why.
Before → render → drawing → built, side by side.
See the proofThe staged quality checklist each job will be checked against, at the hold-points its scope includes — snags and all.
Open the QC checklistEach frame and client note will fill in as projects are completed and verified.
The project record standardReal Sarawak problems worked through — clearly labelled concept, not finished homes.
Read the studiesTerrace · semi-D · apartment · older home · flood-risk · shoplot · developer · longhouse & rural.
Find your property typeKuching · Samarahan · Sibu · Bintulu · Miri — each renovates differently. Mukah and Kapit by arrangement.
Find your cityA scope example and the priorities that go with it.
See the budget guidePublished comparisons show use, cost direction and appearance where available — never just “better” or “dearer”. Some decisions need consultation.
Buy → ALUMAX · Learn → design.alumax · Plan → ELS. No site does another’s job.
English · Chinese · Bahasa Malaysia, written for Sarawak — not translated from KL.
An ELS quotation is valid for 14 days from its date unless stated otherwise. Payment for an ELS package is 60 / 35 / 5 unless your written proposal states a different schedule: 60% on approval to proceed, 35% before works start, and 5% at practical completion. ELS design-only jobs use the same 60/35/5 schedule. ELS workmanship cover is 12 months from handover sign-off, for works ELS is contracted to deliver. Manufacturer component periods follow their source documents. ALUMAX products follow ALUMAX's own quotation and terms. Trades you appoint directly follow their own terms.