How it works

From floor plan to handover.

One clear path, whether you buy a single product or run a whole multi-trade renovation. ELS routes the project, plans it, and coordinates it so the rooms, products and trades work from the same information before work begins.

Most renovation problems do not start on site.

They start earlier — unclear briefs, wrong materials, missing measurements, poor trade coordination, weak quotation control and decisions made too late.

ELS helps make these decisions visible before work begins.

  • Wrong material
  • Unclear scope
  • Poor coordination
  • Late changes

Ten stages, four approvals, one journey

  1. 01

    Brief

    You send what you have, and ELS reads it and decides which service you need.

    What happens in this stage
    • Submit floor plan, photos and budget

      Send what you have — a floor plan, phone photos of the space, and a rough budget. Sketches and approximate numbers are enough to start.

      Work sequence: stage 1

    • ELS routes the project

      We read it and decide what you actually need. A simple product order goes straight to ALUMAX; a complex or multi-trade project stays with ELS for planning and coordination.

      Work sequence: stage 1

    What to have ready. None of it has to be final. The Pre-Check walks you through it and saves everything to one brief.

    • A floor plan or a rough sketch
    • Photos of the space as it is now
    • A budget range — even approximate
    • Your target completion date
  2. 02

    Develop the design

    ELS prepares layout, material and product direction, and you approve the design direction before technical work begins.

    What happens in this stage
    • Resolve the design level

      First, the functional direction. Product already defined? Continue with ALUMAX. Layout or specification still open? Design & Specification. Several trades whose work depends on each other? ELS+. The visual style — one of the five languages, at Essential, Signature or Bespoke — is chosen once that direction is set, not before.

      Work sequence: stages 1–2

    • Approve design direction

      You sign off the colour, material and layout direction before any technical work begins, so technical work starts from a direction you have confirmed.

      Work sequence: stage 2

  3. 03

    Confirm the specification

    ELS works out the specification, dimensions and materials by exposure; technical specification approval accepts the documented solution.

    What happens in this stage
    • Technical development

      ELS works out the specifications, dimensions, material by moisture zone, and the socket, lighting, water-point and appliance positions — the detail an approved specification needs.

      Work sequence: stage 3

  4. 04

    Deliver the commissioned service

    ALUMAX, your contractors or the ELS+ contract carry out the work as the commissioned service sets, and ELS checks the hand-offs set in the commissioned scope.

    What happens in this stage
    • ALUMAX, your contractors, or the ELS+ contract execute

      ALUMAX supplies and installs the cabinets, doors, windows and office systems; other trades are appointed by you and managed by your nominated main contractor, or delivered by ELS+ when its contract includes them.

      Work sequence: stages 5–9

    • Commissioning and handover

      Under ELS+, quality checks are made at the stages set in your proposal and handover records are provided. On design-only projects, your nominated main contractor manages the site, and ELS checks the hand-offs set in the commissioned scope.

      Work sequence: stage 10

See how we work: stages, sign-offs and change rules

Four approvals, each with its own meaning

  • Design direction approvalAuthorises further design development.
  • Technical specification approvalAccepts the documented solution.
  • Procurement approvalAuthorises the specified purchasing commitments.
  • Production releaseAuthorises fabrication, after the required checks and authorisation.

Early feasibility checks come before the commitments that depend on them. Your approval does not replace the technical checks.

Lead times and response times are set in your written proposal.

Who to contact after the work

  • A direct ALUMAX orderALUMAX.
  • ALUMAX products inside an ELS+ works contractThe ELS+ project contact, who coordinates with ALUMAX.
  • An ELS design-only appointmentELS for design deliverables; the contracted supplier or contractor for its own supplied work.

Defects and response times are set in your written proposal. A direct ALUMAX order follows ALUMAX's own terms.

The short version

The ten-stage work sequence

  1. Brief and survey
  2. Room concept and decisions
  3. Coordinated technical design
  4. Scope, cost and purchase release
  5. Site preparation
  6. First fix and substrates
  7. Waterproofing and finishes
  8. Fabrication and installation
  9. Second fix and furnishing
  10. Commissioning and handover

Four approvals, each with its own meaning

  • Design direction approval
  • Technical specification approval
  • Procurement approval
  • Production release

How ELS works

We clarify the brief, review the site, prepare design and specification direction, confirm the scope, then coordinate approved work according to the selected service.

  1. 01

    Brief

    We clarify your space, budget, timeline, concerns and expectations.

  2. 02

    Site Review

    We review site dimensions, photos, plans and constraints.

  3. 03

    Design

    We prepare layout, material and product direction.

  4. 04

    Scope & Price

    We confirm materials, drawings, scope, exclusions and approval requirements.

  • Design commission: issue the agreed design and specification deliverables.
  • ELS+ project: coordinate the trades, inspect and hand over the works set in your proposal.

See a sample document pack

The ten-stage work sequence
The work sequence

Ten stages, in the order the work depends on.

This is a dependency sequence, not a rigid calendar. Long-lead items can be ordered once the drawings freeze; cutting and fabrication are released only after the site is ready and the final measurements are taken. The ceiling closes only after the concealed services have been inspected and the wet-area test has been accepted. The order of ceiling, tiling and flooring is agreed for each project.

  1. 1

    Brief and survey

    Room needs, budget, what stays, measurements and what is still uncertain are written down.

    Hold pointScope assumptions recorded

  2. 2

    Room concept and decisions

    Layout, palette and functional choices are proposed and their feasibility is checked.

    Hold pointYou accept the design direction

  3. 3

    Coordinated technical design

    Drawings, dimensions, junctions, services and access are worked out so the trades review their interfaces together.

    Hold pointCritical technical questions resolved

  4. 4

    Scope, cost and purchase release

    Work packages, responsibilities and the programme are agreed; purchases are authorised against approved specifications.

    Hold pointYour approval recorded

  5. 5

    Site preparation

    Protection, access and removal are planned; site conditions are investigated.

    Hold pointSite conditions accepted, discoveries resolved

  6. 6

    First fix and substrates

    Masonry, plumbing, electrical, air-conditioning, framing and backing, as the project needs.

    Hold pointInspection before concealment

  7. 7

    Waterproofing and finishes

    Waterproofing, tiling, ceilings, flooring and painting, in the agreed order.

    Hold pointTests, curing and substrate checks accepted

  8. 8

    Fabrication and installation

    Cabinetry, stone, glass, metalwork and doors, made and fitted to verified site dimensions.

    Hold pointDimensions and interfaces accepted

  9. 9

    Second fix and FF&E

    Sanitary and electrical fittings, appliances, curtains and furniture.

    Hold pointInstallation and functional checks complete

  10. 10

    Commissioning and handover

    Testing, rectification and demonstration; defects, care information and the responsibility record are handed over.

    Hold pointHandover accepted, open items documented

Seven interfaces, settled before they are covered or cut

InterfacePlanning settlesProcurement coversHold point
Bathroom: plumbing, waterproofing and tilingDrain position, levels, falls, penetrations and waterproofing extentDrain interfaces, collars, tapes, corners and compatible materialsBefore concealment and tiling
Kitchen: cabinetry, stone and appliancesActual appliance models, openings, supports and service accessCabinet hardware, profiles, worktop details and appliance accessories, completeBefore fabrication or cutting
Ceiling: framing, electrical and air-conditioningFixtures, ducts, backing, access and servicing spaceAccess panels, supports, lighting assemblies and controlsBefore the ceiling closes
Bedroom: wardrobe, floor and ceilingFinished levels, anchoring, fillers and operating clearancesTracks and hinges, profiles, caps, feet and the fixing systemBefore fabrication
Living room: TV wall, equipment and electricalMounting, cables, ventilation and removable accessBrackets, cable accessories, service panels and fittingsBefore closure
Curtains: ceiling, windows and FF&ETrack support, stacking, drop and opening clearancesTrack, connectors, brackets, carriers, stops and controlsBefore closure or order
Lighting: design, electrician and supplierAppearance, output intent, control and replacement accessLED, profile, diffuser, caps, driver and compatible controlsBefore purchase and installation
Start here

Start with the free Renovation Pre-Check.

Answer a few questions and we'll map your risk level, the right service, and what to prepare — nothing is sent until you choose to.

Or see a sample proposal first
Start here · The whole offering

Decision to done — without the drag.

Start from your goal

What are you trying to achieve?

Start from the outcome, not a product list — each goal jumps you to the ELS decision that settles it.

How ELS thinks

The ELS Whole-Room Decision System.

A room is not a pile of products. It is a system of air, water, power, light, openings, surfaces, storage and furniture — resolved together, not chosen one product at a time.

AIRVentilation · AC · extraction
LIGHTDaylight + lighting scheme
POWERSockets · data · circuits
WATERSupply · drainage · wet zones
One room
OPENINGSDoors · windows · screens
SURFACESFloor · wall · ceiling
CABINETRYStorage + joinery
FURNITURELoose-furniture fit

ALUMAX supplies any one of these. ELS decides how all eight work together.Explore the Whole-Room Decision System

  1. Decision area 01 · Define

    From overwhelmed to a defined brief.

    Accelerates defining the project — Understand the risks, scope and budget before anyone quotes.

    Puts the scope, risks and budget on paper first, so quotations can be compared.

    Renovation Pre-Check

    A free read that routes the project and readies the brief.

    Start Pre-Check

    How You Live

    Twelve Sarawak lifestyles decide which decisions matter most — lifestyle first, style second.

    Find your lifestyle

    What Your Budget Builds

    What to prioritise first, one scope example, the cost categories and a hidden-cost checklist, with two planning estimates for a worked terrace.

    See the budget guide

    Services & Fees

    Four services, with fees published where ELS has set them, so the paid line is clear from the start.

    Compare ELS services
  2. Decision area 02 · Design

    From a brief to a resolved room.

    Accelerates designing the room — Resolve the whole room — layout, style and every decision — not one product at a time.

    Narrows the choices to the decisions that matter for your room.

    Full Room Scope Builder

    Mark the whole-room scope; produce a coordinated brief, never a self-serve total.

    Build the room scope

    Room Decision System

    Room decisions compared on use, cost direction and appearance where published; some need consultation.

    Explore the decisions

    Design Languages

    Five residential design languages — curated colour & material systems, adapted to your actual property.

    Browse design languages

    Design Library

    A filterable reference of concept images — a starting point, not the design itself.

    Explore the library
  3. Decision area 03 · Specify

    Every choice settled on paper, for procurement and trade coordination.

    Accelerates specifying the build — Decisions settled on paper in one specification — subject to site verification, specialist design and any required approvals.

    Settles the decisions a render leaves open, before anything is ordered.

    The Specimen Pack

    9 illustrative design documents and 4 optional ELS+ records, showing what ELS prepares for the trades.

    Open the specimen pack
  4. Decision area 04 · Coordinate

    One plan, a recommended order, hand-offs checked.

    Accelerates coordinating the build — Trades work to one approved scope, with a recommended sequence that avoids doubling back.

    Helps identify and manage trade clashes before they become larger problems.

    Renovate in Phases

    One masterplan, built in reversibility order. Plan phases to reduce avoidable demolition and repeated work.

    See the phasing plan

    ELS+ — Build & Delivery

    ELS recommends trade dependencies and tracks agreed interfaces and checkpoints.

    See coordination
  5. Decision area 05 · Verify

    The render, compared with what was built.

    Accelerates verifying the result — Compare approved design intent, documented changes and verified completed work.

    Helps show where the built room differs from the render, and why.

    Proof

    Before → render → drawing → built, side by side.

    See the proof

    QC Checklist

    The staged quality checklist each job will be checked against, at the hold-points its scope includes — snags and all.

    Open the QC checklist

    Design Studies

    Real Sarawak problems worked through — clearly labelled concept, not finished homes.

    Read the studies
Skip to your situation

The same engine — pre-loaded for you.

By Property Type

Terrace · semi-D · apartment · older home · flood-risk · shoplot · developer · longhouse & rural.

Find your property type

By City

Kuching · Samarahan · Sibu · Bintulu · Miri — each renovates differently. Mukah and Kapit by arrangement.

Find your city
Under all five areas

What makes the engine premium.

Three ways to compare

The 3-Impact rule

Published comparisons show use, cost direction and appearance where available — never just “better” or “dearer”. Some decisions need consultation.

Three sites, one ecosystem

One ecosystem, three views

Buy → ALUMAX · Learn → design.alumax · Plan → ELS. No site does another’s job.

Trilingual & local

Trilingual, Sarawak-built

English · Chinese · Bahasa Malaysia, written for Sarawak — not translated from KL.

ELS package terms

An ELS quotation is valid for 14 days from its date unless stated otherwise. Payment for an ELS package is 60 / 35 / 5 unless your written proposal states a different schedule: 60% on approval to proceed, 35% before works start, and 5% at practical completion. ELS design-only jobs use the same 60/35/5 schedule. ELS workmanship cover is 12 months from handover sign-off, for works ELS is contracted to deliver. Manufacturer component periods follow their source documents. ALUMAX products follow ALUMAX's own quotation and terms. Trades you appoint directly follow their own terms.