A complete pack, in full

One kitchen, 9 design documents.

This specimen shows the 9 documents of ELS's design services for one room, from the agreed brief to the approval checklist, so you can see what each one settles. 4 further records belong to optional ELS+ delivery and are shown separately after them.

Design-only specimen. This pack shows the documents of ELS's design and specification service; it is not an ELS+ contracted-works pack.

Three documents, and who gets them

Layout
Plan, elevation and M&E overlay
Where each item sits in the room, with the services drawn over it, so the contractor and ALUMAX price from one set of drawings.
Included in: Design & Specification and ELS+ — Build & Delivery
See the specimen sheet
Material specification
Material schedule and room specification
Which finishes, boards and fittings are specified, by system and moisture zone, so quotations compare like with like.
Included in: Design & Specification and ELS+ — Build & Delivery
See the specimen sheet
QC and handover
QC checklist and handover pack
The stages at which work is checked, and the record handed over when the job closes: what was built, what was approved and what is still open.
Included in: ELS+ — Build & Delivery
See the specimen sheet

The full specimen below shows 9 design documents and 4 optional ELS+ records. Not every service includes every document: which documents a service includes is set out in the deliverables matrix on the services page. The deliverables matrix

SPECIMEN PACKSpecimen 01

Terrace kitchen · wet + dry

An intermediate 3-bedroom terrace in Sibu. One wet kitchen, one dry kitchen and a short utility run, in the Warm Wood Modern direction. A fictional project, prepared to show the format.

A representative ELS document set, rendered in full. A fictional project, prepared to show the format; dimensions and materials are illustrative. Not a client file, not a quotation.

Your project · Status

Where your project stands

SPECIMEN

Specimen: this sheet shows its empty state on purpose. What a progress update says is in: Specimen progress update

Your stage has not been recorded on this pack yet. The rows below are what your ELS contact has confirmed so far.

Site measurement
Not requested yet
Drawing
Awaiting your approval
Quotation
Awaiting your approval

What has to happen before the order is confirmed

The site is measured first — every dimension on the drawing depends on it, and a drawing approved on assumptions is the most expensive thing to change later.

ELS records this
02
Brief

Design brief

SPECIMEN
Property
Intermediate terrace · 3 bedroom · Sibu, Sarawak
Rooms in scope
Wet kitchen · dry kitchen · utility run
Household
Family of five · daily wok cooking · weekly batch cooking
Style direction
Warm Wood Modern
Stated budget
RM45,000–60,000 · cabinetry + worktops, appliances by client
Stated timing
Client's own target: 1 – 3 months
Priorities, ranked
  1. Client's desired outcome, for discussion: reduce moisture damage and visible mould across the wet run.
  2. Cross-ventilation so the middle zone is never dead air.
  3. Storage for bulk cooking and appliances, reachable without a stool.
  4. Socket, switch and appliance positions fixed before any wiring.
Site constraints
  • Single rear window; dead-air pocket in the middle of the plan.
  • Existing floor tiles retained — set-out works to the tiled datum.
  • Electrical meter and main stop-valve fixed at the rear wall.
Out of scope
  • Appliances and the sink mixer supplied by the client.
  • No structural or party-wall alterations.
  • Tiling, electrical and plumbing works by appointed trades, coordinated by ELS.

Success testClient's desired outcome, for discussion: reduce moisture damage and visible mould, with every appliance reachable on one circuit-mapped layout. Inspection criteria and any warranty or rectification are confirmed in the actual project's approved scope and product terms.

03
Specification

Floor plan

SPECIMEN
SINKHOBWET RUNDRY ISLANDFRIDGETALL36002400N

PLAN · 1:50 @ A3 · dimensions in mm · indicative

04
Specification

Elevation — main run

SPECIMEN
27001500900WALL CABINETSHOODBASE CABINETSTALL / OVENWORKTOP

ELEVATION A · 1:25 · heights in mm · indicative · specimen values; set per project against a defined datum

Kitchen daily-life details

Six details for daily use, drawn as a concept in this fictional specimen: not a completed project or a construction drawing. Appliance compatibility is not confirmed until the actual model is checked; no choice here commissions installation.

  • Finished floor and working-height datums. Floor line as zero; a working position per person (set per project).
  • Appliance openings and service zones. Openings labelled; sockets and isolators in the adjacent bay, not behind the appliance (Dishwasher socket 600 mm FFL; oven isolator 1,400 mm FFL).
  • Sink support, trap and isolation access. Support, trap and isolation valves reachable from the front (set per project).
  • Countertop and backsplash junction. Junction in section: sealed, upstand, or coved only where the maker publishes the method (set per project).
  • Bin withdrawal and dishwasher removal clearance. Bin and dishwasher removal path, clear of doors, drawers and plumbing (set per project).
  • Lighting driver and hood-filter access. Driver position and hood-filter removal, both reachable (Cooker hood socket 2,200 mm FFL).

Heights are starting coordination datums, not statutory mounting heights. Any other figure reads: set per project, against the current Sarawak Building Bylaws and the local authority's conditions.

05
Specification

M&E overlay

SPECIMEN
SSSWLLUDHXIM&E OVERLAY · coordinated to joinery
  • S13A twin socket
  • WSwitch drop
  • LDownlight
  • UUnder-cabinet LED
  • DData / WiFi point
  • HWater supply H/C
  • XWaste / drain
  • IHood isolator

Positions fixed against the joinery before wiring · indicative

06
Specification

Material schedule

A standard sheet; per-project schedules are not part of the pack.

SPECIMEN
ZoneElementSubstrateFinishSeal / edge
WetSink & hob base carcassACP / honeycomb aluminiumPowder-coatSealed profile joints
WetSplashback behind hobACP aluminiumBrushedSealed top edge
CountertopWorktopQuartzMatteContinuous silicone at wall; fall to sink
Semi-wetDry-kitchen / utility base carcassEdge-sealed board (or plywood)MelamineSealed cut edges
DryTall & wall carcassP6 moisture-resistant board (FLYHOME P6)MelamineABS edge-band on all cut edges
DryDoor frontsMDF2-pac matte lacquerLacquered edges
All zonesHinges & runners—Soft-close · agreed brandPer approved spec
Specification · Room specification

Room-by-room specification

SPECIMEN
Lines specified
64

The Room Spec Standard in full — every line a room can carry, by building system, with the trade that executes it. On a real project only the lines the client includes are printed, and the ones they exclude are listed as excluded.

Programme & structure3

  • Room purpose & usersDesign inputs — no site trade
  • Structural / lintel / openingsDesign inputs — no site trade
  • Accessibility provisionsDesign inputs — no site trade

Air & comfort3

  • Air-conditioning (unit · piping · condensate)Air-conditioning & ventilation
  • Cooker hood / mechanical exhaustAir-conditioning & ventilation
  • Ventilation / fresh-air openingsAir-conditioning & ventilation

Lighting & shading5

  • Layered lighting scheme (ambient · task · accent)Electrical
  • Cove / cabinet-integrated LEDElectrical
  • Lighting colour temperatureElectrical
  • White light controlElectrical
  • Curtains / blinds / shadingWindow Treatments / Soft Furnishings

Power, data & security9

  • Socket & switch positionsElectrical
  • Dedicated circuits / DBElectrical
  • Light fittings & second-fixElectrical
  • Fans (ceiling / exhaust)Electrical
  • Appliances (fridge · oven · hob · hood · washer)Electrical
  • Data / WiFi pointsData & security
  • CCTV / surveillanceData & security
  • Anti-theft / alarmData & security
  • Access control / smart locksData & security

Water & drainage4

  • Waterproofing membraneWaterproofing
  • Plumbing points (sink · tap · WC · shower)Plumbing
  • Drainage, floor traps & fallsPlumbing
  • Water filter / storage / pressurePlumbing

Doors, windows & screens7

  • Doors (single / double) + ironmongery
  • Insect screensAluminium doors & windows
  • Windows + glazingAluminium doors & windows
  • Door casing / architrave
  • Window casing / sillALUMAX cabinet & joinery
  • Skirting + edge trimsALUMAX cabinet & joinery
  • Hidden / concealed door

Surfaces15

  • Floor finish (tile · SPC · timber)Flooring
  • Wall finish (paint · tile · plaster)Painting & finishes
  • Floor TilingInstall floor tiles to approved set-out, cuts, joints and falls; waterproofing and screed excluded unless separately stated.Tiling
  • Wall TilingInstall wall tiles to approved substrate, set-out, cuts and joints; waterproofing and render excluded unless separately stated.Tiling
  • Feature & Backsplash TilingInstall feature and backsplash tiles to approved set-out, cuts, joints and edge trims; substrate preparation and waterproofing excluded unless separately stated.Tiling
  • Workstation height modeLoose furniture & FF&E
  • Focus enclosureLoose furniture & FF&E
  • Breakout settingLoose furniture & FF&E
  • Desk cable routeElectrical
  • Wall panels / feature wall
  • Ceiling type + soffitsCeiling
  • Decoration strips / cornice
  • Partitions / internal dividersAluminium doors & windows
  • Staircase (feature)Aluminium doors & windows
  • Premium finishing / detailing

Cabinetry4

  • Kitchen cabinetry (base · tall · wall)ALUMAX cabinet & joinery
  • Wardrobe / storageALUMAX cabinet & joinery
  • Vanity / washroom joineryALUMAX cabinet & joinery
  • TV / feature / study joineryALUMAX cabinet & joinery

Furniture & styling4

  • Sofas / seatingLoose furniture & FF&E
  • Beds / bedroom furnitureLoose furniture & FF&E
  • Dining setLoose furniture & FF&E
  • Rugs / decor / stylingLoose furniture & FF&E

Exterior envelope5

  • Facade finish (paint · tile · cladding)Painting & finishes
  • External & Façade TilingInstall external and façade tiles to approved substrate, set-out, cuts, joints and movement joints; waterproofing and render excluded unless separately stated.Tiling
  • Exterior wall panels / feature cladding
  • Roof / awning / canopyAluminium doors & windows
  • External drainage / guttersPlumbing

Exterior safety, monitoring & comfort5

  • Gates / fencing / boundaryAluminium doors & windows
  • Exterior CCTV / monitoringData & security
  • Exterior / facade lightingElectrical
  • Exterior ventilation / louvresAir-conditioning & ventilation
  • Exterior partition / screenAluminium doors & windows

Mechanical & electrical scope24

Pulled out because these must be set before anything is closed in.

  • Air-conditioning (unit · piping · condensate)Air-conditioning & ventilation
  • Cooker hood / mechanical exhaustAir-conditioning & ventilation
  • Ventilation / fresh-air openingsAir-conditioning & ventilation
  • Layered lighting scheme (ambient · task · accent)Electrical
  • Cove / cabinet-integrated LEDElectrical
  • Lighting colour temperatureElectrical
  • White light controlElectrical
  • Socket & switch positionsElectrical
  • Dedicated circuits / DBElectrical
  • Light fittings & second-fixElectrical
  • Fans (ceiling / exhaust)Electrical
  • Appliances (fridge · oven · hob · hood · washer)Electrical
  • Data / WiFi pointsData & security
  • CCTV / surveillanceData & security
  • Anti-theft / alarmData & security
  • Access control / smart locksData & security
  • Plumbing points (sink · tap · WC · shower)Plumbing
  • Drainage, floor traps & fallsPlumbing
  • Water filter / storage / pressurePlumbing
  • Desk cable routeElectrical
  • External drainage / guttersPlumbing
  • Exterior CCTV / monitoringData & security
  • Exterior / facade lightingElectrical
  • Exterior ventilation / louvresAir-conditioning & ventilation

Generated from the room scope configured with the client. Nothing here is priced — the scope becomes a project quotation after site survey.

Coordination · Trade scope matrix

Who executes what, and when

SPECIMEN

The standard scope matrix: every line in the Room Spec Standard, under the trade that executes it — except the design inputs, which no site trade executes.

Design inputs — no site trade

Stages 1–3 · Stages 5–73 lines
Scope lineCoordinated byWork-sequence stage
Room purpose & usersProgramme & structureCoordinated byELS coordinateWork-sequence stageStages 1–3 Design freeze
Structural / lintel / openingsProgramme & structureCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Accessibility provisionsProgramme & structureCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works

ALUMAX cabinet & joinery

Stages 8–96 lines
Scope lineCoordinated byWork-sequence stage
Window casing / sillDoors, windows & screensCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings
Skirting + edge trimsDoors, windows & screensCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings
Kitchen cabinetry (base · tall · wall)CabinetryCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings
Wardrobe / storageCabinetryCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings
Vanity / washroom joineryCabinetryCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings
TV / feature / study joineryCabinetryCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings

Electrical

Stages 5–7 · Stages 8–911 lines
Scope lineCoordinated byWork-sequence stage
Layered lighting scheme (ambient · task · accent)Lighting & shadingCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Cove / cabinet-integrated LEDLighting & shadingCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Lighting colour temperatureLighting & shadingCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
White light controlLighting & shadingCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Socket & switch positionsPower, data & securityCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Dedicated circuits / DBPower, data & securityCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Light fittings & second-fixPower, data & securityCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Fans (ceiling / exhaust)Power, data & securityCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Appliances (fridge · oven · hob · hood · washer)Power, data & securityCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Desk cable routeSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Exterior / facade lightingExterior safety, monitoring & comfortCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings

Plumbing

Stages 5–74 lines
Scope lineCoordinated byWork-sequence stage
Plumbing points (sink · tap · WC · shower)Water & drainageCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Drainage, floor traps & fallsWater & drainageCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Water filter / storage / pressureWater & drainageCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
External drainage / guttersExterior envelopeCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works

Waterproofing

Stages 5–71 line
Scope lineCoordinated byWork-sequence stage
Waterproofing membraneWater & drainageCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works

Tiling

Stages 8–94 lines
Scope lineCoordinated byWork-sequence stage
Floor TilingSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Wall TilingSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Feature & Backsplash TilingSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
External & Façade TilingExterior envelopeCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings

Air-conditioning & ventilation

Stages 5–7 · Stages 8–94 lines
Scope lineCoordinated byWork-sequence stage
Air-conditioning (unit · piping · condensate)Air & comfortCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Cooker hood / mechanical exhaustAir & comfortCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Ventilation / fresh-air openingsAir & comfortCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Exterior ventilation / louvresExterior safety, monitoring & comfortCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings

Ceiling

Stages 5–71 line
Scope lineCoordinated byWork-sequence stage
Ceiling type + soffitsSurfacesCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works

Flooring

Stages 8–91 line
Scope lineCoordinated byWork-sequence stage
Floor finish (tile · SPC · timber)SurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings

Aluminium doors & windows

Stages 5–7 · Stages 8–97 lines
Scope lineCoordinated byWork-sequence stage
Insect screensDoors, windows & screensCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings
Windows + glazingDoors, windows & screensCoordinated byALUMAX supply & installWork-sequence stageStages 8–9 Finish — install · trims · fittings
Partitions / internal dividersSurfacesCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Staircase (feature)SurfacesCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Roof / awning / canopyExterior envelopeCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Gates / fencing / boundaryExterior safety, monitoring & comfortCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Exterior partition / screenExterior safety, monitoring & comfortCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings

Painting & finishes

Stages 8–92 lines
Scope lineCoordinated byWork-sequence stage
Wall finish (paint · tile · plaster)SurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Facade finish (paint · tile · cladding)Exterior envelopeCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings

Loose furniture & FF&E

Stages 8–9 · Stage 107 lines
Scope lineCoordinated byWork-sequence stage
Workstation height modeSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Focus enclosureSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Breakout settingSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Sofas / seatingFurniture & stylingCoordinated byBy othersWork-sequence stageStage 10 Handover — furniture · snagging
Beds / bedroom furnitureFurniture & stylingCoordinated byBy othersWork-sequence stageStage 10 Handover — furniture · snagging
Dining setFurniture & stylingCoordinated byBy othersWork-sequence stageStage 10 Handover — furniture · snagging
Rugs / decor / stylingFurniture & stylingCoordinated byBy othersWork-sequence stageStage 10 Handover — furniture · snagging

Data & security

Stages 5–7 · Stages 8–95 lines
Scope lineCoordinated byWork-sequence stage
Data / WiFi pointsPower, data & securityCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
CCTV / surveillancePower, data & securityCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works
Anti-theft / alarmPower, data & securityCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Access control / smart locksPower, data & securityCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Exterior CCTV / monitoringExterior safety, monitoring & comfortCoordinated byELS coordinateWork-sequence stageStages 5–7 Prep — demolish · M&E · wet works

Window Treatments / Soft Furnishings

Stage 101 line
Scope lineCoordinated byWork-sequence stage
Curtains / blinds / shadingLighting & shadingCoordinated byBy othersWork-sequence stageStage 10 Handover — furniture · snagging

Specialist trade

Stages 8–97 lines
Scope lineCoordinated byWork-sequence stage
Doors (single / double) + ironmongeryDoors, windows & screensCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Door casing / architraveDoors, windows & screensCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Hidden / concealed doorDoors, windows & screensCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Wall panels / feature wallSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Decoration strips / corniceSurfacesCoordinated byBy othersWork-sequence stageStages 8–9 Finish — install · trims · fittings
Premium finishing / detailingSurfacesCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings
Exterior wall panels / feature claddingExterior envelopeCoordinated byELS coordinateWork-sequence stageStages 8–9 Finish — install · trims · fittings

Who is on site, by stage

  1. Stages 1–3
    Design freezeDesign inputs — no site trade
  2. Stages 5–7
    Prep — demolish · M&E · wet worksDesign inputs — no site trade · Air-conditioning & ventilation · Electrical · Data & security · Waterproofing · Plumbing · Ceiling · Aluminium doors & windows
  3. Stages 8–9
    Finish — install · trims · fittingsAir-conditioning & ventilation · Electrical · Data & security · Specialist trade · Aluminium doors & windows · ALUMAX cabinet & joinery · Flooring · Painting & finishes · Tiling · Loose furniture & FF&E
  4. Stage 10
    Handover — furniture · snaggingWindow Treatments / Soft Furnishings · Loose furniture & FF&E

Hold-points this scope switches on10

  • H1Design sign-offStages 1–3
  • H2Demolition scopeStages 5–7
  • H4M&E first-fix positionsStages 5–7
  • H3Waterproofing testStages 5–7
  • H5Ceiling voidStages 5–7
  • H6Delivery inspectionStage 8
  • H7Joinery / panel interfaceStages 8–9
  • H8Power-on testStages 8–9
  • H9Pre-delivery cleanStage 10
  • H10Final snaggingStage 10

Derived from this job's configured room scope — the same source the client's coordination pack reads. No line is priced here.

Coordination · Approval checklist

What you approve, and what it holds up

SPECIMEN

Work stops at an approval, not at a reminder. Each line names what cannot begin until it is signed — so a decision that is waiting on you is visible before it costs time.

Specimen: the choices behind these approvals, and the stage each one holds up, are in: Specimen decision register · Specimen programme

Commitment

  • —Design sign-offThe design you approved — the version everything after this is built and priced against.Holds up: Specification and quotationOutstanding
  • —Product-order depositThe deposit recorded as received.Holds up: Fabrication and procurementOutstanding
  • —Completion acceptedThe finished work accepted at handover.Holds up: Warranty period and after-careOutstanding

Construction hold-points

  • 01Design sign-offLayout, render, M&E overlay and finish schedule all approved.Holds up: orderingOutstanding
  • 02Demolition scopeCorrect walls and finishes removed; structure intact.Holds up: wet worksOutstanding
  • 04M&E first-fix positionsEvery socket, switch, light, water-point and AC point matches the drawing before plaster hides them.Holds up: plasteringOutstanding
  • 03Waterproofing testFlood / pressure test holds before anything covers the membrane; falls to gully.Holds up: tiling / screedOutstanding
  • 05Ceiling voidServices (AC, wiring, ducting) correct before the ceiling closes.Holds up: ceiling close-upOutstanding
  • 06Delivery inspectionRight items, correct finish codes, quantities, no transit damage.Holds up: installOutstanding
  • 07Cabinet interfaceWall / floor level and the M&E points behind the run correct before fixing.Holds up: joinery installOutstanding
  • 08Power-on testCircuits, appliances and fans commissioned.Holds up: deep clean + defectsOutstanding
  • 09Pre-delivery cleanNo wet or dusty trade remains before furniture arrives.Holds up: loose furnitureOutstanding
  • 10Final snaggingFull QC checklist signed; care & warranty pack issued.Holds up: handoverOutstanding

A line reads approved only where the project records a date. An unrecorded approval is shown as outstanding — never assumed.

Specimen: product identities to be confirmed per project

Specimen procurement schedule: kitchen

SPECIMEN

Rows and completion parts only: no brand, model, price, quantity or date. The four date columns hold stage labels. On a live project each row is filled from that project's own selection.

ItemProduct identityRoom or zoneDecide byOrder byRequired on siteInstall afterVerifier roleStatus
Main items
Worktop materialTo be confirmedWorktop runAt specificationBefore carcasses are setBefore the worktop is templatedCarcasses fixedWorktop installerNot yet selected
Sink mountingTo be confirmedSink runAt specificationBefore the worktop is templatedBefore the worktop is templatedWorktop fixedWorktop installerNot yet selected
Hinges and platesTo be confirmedBase and wall cabinetsAt specificationBefore carcasses are setBefore carcasses are setFirst fix completeCabinet installerNot yet selected
Handles and handleless systemsTo be confirmedDoors and drawersAt specificationBefore fitting offBefore fitting offCarcasses fixedCabinet installerNot yet selected
Exact hoodTo be confirmedCooking wallAt specificationBefore first fixBefore fitting offFirst fix completeSite supervisorNot yet selected
Small completion parts
Compatible sealantTo be confirmedWorktop and sink runAt specificationBefore fitting offBefore fitting offWorktop fixedWorktop installerNot yet selected
FixingsTo be confirmedBase and wall cabinetsAt specificationBefore carcasses are setBefore carcasses are setFirst fix completeCabinet installerNot yet selected
Profiles and completion piecesTo be confirmedCabinet run endsAt specificationBefore fitting offBefore fitting offCarcasses fixedCabinet installerNot yet selected
Feet/plinthsTo be confirmedBase cabinetsAt specificationBefore carcasses are setBefore carcasses are setFirst fix completeCabinet installerNot yet selected
Wastes/trapsTo be confirmedSink baseAt specificationBefore first fixBefore carcasses are setFirst fix completePlumberNot yet selected
Isolation valvesTo be confirmedSink baseAt specificationBefore first fixBefore carcasses are setFirst fix completePlumberNot yet selected
TrimsTo be confirmedBacksplashAt specificationBefore tilingBefore tilingWorktop fixedTilerNot yet selected
End capsTo be confirmedBacksplashAt specificationBefore tilingBefore tilingWorktop fixedTilerNot yet selected
Specimen: product identities to be confirmed per project

Specimen procurement schedule: bathroom

SPECIMEN

Rows and completion parts only: no brand, model, price, quantity or date. The four date columns hold stage labels. On a live project each row is filled from that project's own selection.

ItemProduct identityRoom or zoneDecide byOrder byRequired on siteInstall afterVerifier roleStatus
Main items
Waterproofing systemTo be confirmedWet floor and wallsAt specificationBefore first fixBefore the membraneFirst fix completeWaterproofing specialistNot yet selected
Shower/floor drainsTo be confirmedFloor and showerAt specificationBefore first fixBefore the membraneFirst fix completePlumberNot yet selected
Basins and sinksTo be confirmedVanityAt specificationBefore tilingBefore fitting offTiling completePlumberNot yet selected
Taps and mixersTo be confirmedVanity and showerAt specificationBefore tilingBefore fitting offTiling completePlumberNot yet selected
Shower screensTo be confirmedShower areaAt specificationBefore tilingBefore fitting offTiling completeSite supervisorNot yet selected
Small completion parts
TapesTo be confirmedWet floor and wallsAt specificationBefore first fixBefore the membraneFirst fix completeWaterproofing specialistNot yet selected
CornersTo be confirmedWet floor and wallsAt specificationBefore first fixBefore the membraneFirst fix completeWaterproofing specialistNot yet selected
CollarsTo be confirmedPipe and drain penetrationsAt specificationBefore first fixBefore the membraneFirst fix completeWaterproofing specialistNot yet selected
GroutTo be confirmedWall and floor tilingAt specificationBefore tilingBefore tilingWaterproofing clearedTilerNot yet selected
Movement-joint sealantTo be confirmedWall and floor tilingAt specificationBefore tilingBefore tilingWaterproofing clearedTilerNot yet selected
TrimsTo be confirmedTile edgesAt specificationBefore tilingBefore tilingWaterproofing clearedTilerNot yet selected
End capsTo be confirmedTile edgesAt specificationBefore tilingBefore tilingWaterproofing clearedTilerNot yet selected
Wastes and trapsTo be confirmedVanityAt specificationBefore first fixBefore tilingFirst fix completePlumberNot yet selected

Specimen quotation SPECIMEN

From the pack's fictional project. ELS's own fees only, from its published fee card: no product price and no renovation total.

Design & Specification · minimum fee
RM1,500.00 · Included
ELS technical site survey (Sibu)
RM150.00 · Optional addition, priced separately; not in the total
Total
RM1,500.00
Business details
Not yet stated

ELS+ specimen records

These records apply only if ELS+ is commissioned. They are not part of the design-only pack above. The contracting party is named in your written proposal.

10
Coordination

Foreman sheet

A standard sheet; per-project schedules are not part of the pack.

SPECIMEN

Datum & set-outWorktop datum 900mm above the high point of the finished floor; scribe to walls that run out of true. Wall cabinets hung to the 1500mm datum line, checked level across the whole run.specimen values; set per project against a defined datum

Build sequence
  1. Confirm all services are roughed to the M&E overlay before any carcass is set.
  2. Confirm the plumber's pressure test has passed and is signed off by the plumber before anything is boxed in.
  3. Set the wet-run carcasses first — level, plumb and anchor before moving on.
  4. Template the worktop only after the carcasses are fixed.
  5. Hang wall cabinets to the 1500mm datum line.
  6. Fit the hood and set the appliance gaps to the confirmed models.
  7. Seal, then snag against the QC sheet.
Tolerances
  • Carcass level ±2mm over the run.
  • Door and drawer gaps 3mm ±0.5mm.
  • Worktop overhang 20mm to the door face.
specimen values; set per project against a defined datum
Leave accessible
  • Stop valves under the sink base.
  • Hood isolator switch.
  • Appliance plugs and dedicated circuits.
Confirm before proceeding
  • Service positions match the M&E overlay.
  • Plumbing pressure test passed.
  • Wet-zone carcass is ACP or honeycomb aluminium.
  • Wet-area floor falls toward the drain.
11
Handover

QC sheet

SPECIMEN

The staged hold-points each ELS job will be checked against, where its commissioned scope includes them — shown here as a specimen.

A
Before productionDrawing approval — the cheapest stage to fix anything.
  • Dimensions match the site, not the floor plan
  • Material specified per moisture zone
  • Appliance and sink models confirmed before drawing
  • Socket, switch and water-point positions overlaid
  • Door swing, drawer clash and walkway clearance checked
  • One approved scope all trades sign to
B
During production & installCatch it while the trade is still on site.
  • Carcass material matches the approved spec
  • Edge banding sealed on all cut edges
  • Carcass level, plumb and securely anchored
  • Hinges, runners and hardware are the agreed brand
  • Wall fixings suit the actual wall type
C
Wet-area & M&EWhere Sarawak homes fail soonest.
  • Wet-zone carcasses are ACP or honeycomb aluminium, or protected P6 under a kitchen sink with ALUMAX's listed protections where ALUMAX's site measurement finds P6 suitable
  • Plumbing pressure-tested before boxing in
  • Sealant lines continuous at sink, hob and backsplash
  • Wet-area floor falls toward the drain
  • Electrical points earthed and clear of water zones
  • Flood-prone homes have a raised or sacrificial base
D
Snagging & handoverThe final walk before the balance is paid.
  • Every door and drawer aligned and soft-closing
  • Surfaces free of scratches, dents and glue marks
  • All appliances and water points tested live
  • Silicone, caulk and trims cleanly finished
  • Defects logged with photos and a fix date
  • Warranty, care notes and material list handed over
Coordination · Variation register

Changes after sign-off

SPECIMEN

Every change raised after design sign-off is entered here as it happens. A completed register is issued with the handover pack.

A change is recorded when it is raised, not reconstructed afterwards. No amount appears here — the fee sits in the approved offer terms.

Handover · Handover pack

Completion record

SPECIMEN

The record each completed job will hand over, shown here as a specimen. On a live project, each line is filled from what the project actually logged; the values on this sheet are illustrative.

Not yet recorded8

These sections are missing at least one record. They are listed here so the pack cannot read as complete when it is not.

Acceptance · Warranty · Quality record · Site record · Changes · Open items · Documents · After-care

Acceptance

When completion was accepted, and by whom.

Not recorded
Completion accepted
Not accepted yet — this pack is provisional.
Design signed off
Not recorded

Warranty

ELS produces the specification; it does not build. ALUMAX supplies and installs its own products under its own warranty, and every other trade — electrical, plumbing, tiling, ceiling, waterproofing — is contracted directly by you, to this specification.

Not recorded
Warranty
Not recorded

Each warranty above is given by the specialist trade or manufacturer named on that line, directly to the client, on that party's own terms. ELS coordinates the specification and verifies compliance; it gives no product or workmanship warranty of its own and is not a party to any warranty listed here.

Quality record

The staged hold-points this job was signed off against.

Not recorded
Hold-points passed
0 of 23

Site record

Set-out and re-measure rounds against the live site.

Not recorded
Set-out & re-measure rounds
Not recorded

Changes

Variations raised after design sign-off.

Not recorded
Variation orders
Not recorded

Open items

Anything still outstanding at handover.

Not recorded
Defects
Not recorded

Documents

Drawings and captured evidence held for this job.

Not recorded
Drawing sheets
Not recorded
Evidence captured
Not recorded

After-care

The post-handover touchpoints and when they fall due.

Not recorded
After-care schedule
Starts at handover — no date recorded yet.

For anything after handover, use the ELS contact form and quote your ELS- reference.

Every line above is a record made during the job. A blank is shown as a blank — the pack never fills one in.

Specimen

Specimen Trade work sheet: waterproofing

SPECIMEN

Structure only, no figures. Every field is blank here; on a live sheet each is filled from the project's own record and the approved drawings.

Before starting

  • The approved drawing and specification revision is named, and it is the current one.
  • The work before this trade is complete and accepted.
  • Substrate accepted for the membrane system the project approved.

Scope

  • Scope and exclusions are read from the work package; nothing is copied here.

Check before covering

  • Each linked hold point is cleared with evidence before the work is covered.
  • Flood test: set per project; a qualified reviewer is required.
  • Upturn and threshold details: a qualified reviewer is required.

Before leaving

  • What was completed this visit, and what was not.
  • Protection left on the finished surfaces.
  • Outstanding items, named.

Handoff

  • The trade that works next.
  • What must be true before that trade starts.
  • Who is responsible for the work at handoff.

Evidence

  • Photo and measurement references.
  • The role of the reviewer (a role, not a name).
  • Unresolved items, carried to the handover.
Specimen

Specimen change record

SPECIMEN

No figures. An illustrative change, to show the fields a real record carries.

Trigger type
Finish
What changed
A selected tile finish is replaced by a different finish after the drawings were issued.
Affected drawings and completed work
The tiling elevation and the tile schedule. Waterproofing is complete and cleared; tiling has not started.
Proposed resolution
Reissue the elevation and the schedule with the new finish, and confirm the setting method with the tiler before tiling starts.
Approvals
The role or company, the evidence and the day of each approval. Blank in this specimen.

Specimen programme SPECIMEN

From the pack's fictional project. Markers are relative to the signed design: not dates and not durations. A live project's programme and milestones are set in its proposal.

StageMarkerWaits onCheck before it moves on
Design freezeStep 1Your approvalDesign sign-off
Order all long-lead itemsStep 1Design freezeNone at this step
DemolitionStep 1Design freezeDemolition scope
PartitionsStep 2DemolitionNone at this step
M&E first-fixStep 2PartitionsM&E first-fix positions
Waterproofing · wet areasStep 3M&E first-fixWaterproofing test
Plaster · screedStep 4Waterproofing testNone at this step
Ceiling framing + soffitsStep 4Plaster · screedCeiling void
Long-lead items arriveSet by the orderThe orderDelivery inspection
Tiling and other finishesAfter deliveryDelivery inspectionNone at this step
CabinetsAfter the finishesTiling and other finishesCabinet interface
Power-on and cleaningAfter the cabinetsCabinetsPower-on test, Pre-delivery clean
HandoverAfter the final checkPower-on and cleaningFinal snagging

Specimen decision register SPECIMEN

From the pack's fictional project. Each decision lists its options, the role that decides it and its status. No product, price or date is recorded. On a live project each row is filled from that project's own decisions.

DecisionOptionsDecided byNeeded beforeStatus
Kitchen layoutGalley or L-shapeYou, the clientDesign freezeDecided
Worktop materialEngineered stone, sintered stone or laminateYou, the clientDesign freezeDecided
Hood and duct routeDucted to the outside or recirculatingDesigner, with the M&E tradeM&E first-fixDecided
Cabinet door finishTwo finish samplesYou, the clientCabinetsOpen
Appliance modelsTo be confirmedYou, the clientOrder all long-lead itemsWaiting for your decision

Specimen progress update SPECIMEN

From the pack's fictional project. It carries a relative marker and a role, not a date or a person, and no photographs. The format of a live update, and how often it is sent, are set in your proposal.

Marker
Step 3 (specimen)
Prepared by
Project coordinator (a role, not a named person)
Done
Demolition and partitions complete. M&E first-fix done, with its positions checked.
Next
Waterproofing in the wet areas, then its flood test.
Waiting on you
The cabinet door finish: see the decision register.
Open items
One defect logged against the partition set-out, with its responsible trade named. Not yet rectified.

Specimen defect and rectification record SPECIMEN

From the pack's fictional project. A defect and rectification record on an ELS+ project holds these fields.

Item · Location · Date reported · Responsible trade · Rectified · Verified by · Evidence

Delivery lead: to be named in your proposal

Completion, dates and rectification obligations are the ones set in your contract.

A representative ELS document set — ELS's own work, not a client file and not a quotation. A fictional project, prepared to show the format; dimensions and materials are illustrative. The QC sheet shows the standard staged hold-points; on a live project each line is dated and initialled. In ELS's design services, ELS coordinates each specialist trade's information to one approved scope; it does not itself supply electrical, plumbing, tiling, ceiling or painting works. ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.