What we offer.

Bring your space, materials and details into one considered plan.

ELS creates a coherent home—from room planning and material combinations to specified products and, when commissioned, coordinated ELS+ delivery. We resolve the design, document what needs to be built, record the agreed checkpoints and coordinate review of outstanding items within the contracted scope — so the contractors you invite can price from the same written scope.

Much of it never shows in the finished photo — five coordination streams, and the set-out and re-measure rounds your scope includes. See the invisible work

What it costs

Compare the full scope of each Compare the services side by side

Not sure which service?

Which of these sounds like you?

Say the outcome you want in plain words — we'll point you to the right service. No jargon required.

Do you need ELS?

Three levels of involvement. Only what your project needs.

The honest first question. A product-only job needs ALUMAX, not us — we will send you there. ELS earns its fee only when decisions, specification or coordination do.

L1ELS not required

Product only

You already know the product and its dimensions.

Configure and price it directly on ALUMAX — no design step to pay for.

Continue to ALUMAX
L2Limited — design & specification

Product + design support

You need room decisions and an approved specification.

ELS resolves the room and documents the spec; ALUMAX supplies and installs.

Start Pre-Check
L3Full — design, specification & coordination

ELS+ (Design and build)

Multiple rooms, trades or site dependencies.

Your contract for the works is with ELS Design and Build; your proposal names each trade and what it supplies.

Start Pre-Check
Choose the correct service

Three services. Choose by how far you take it.

A ladder — from a coherent look, to a documented spec you can build from, to coordinating each trade's information to it. Configuration is included; design authorship is charged.

Browse our published examples freely. Matching references to your property, adapting layouts or finishes, and developing drawings begins within a paid ELS service.

Service 01

Style Adaptation

For homeowners placing an ALUMAX product order who want the chosen style, finishes and products to work together across the whole property.

RM800from · for one room · excl. SSTFour rooms RM2,800. Each room beyond the fourth is RM800.
ELS determines

The whole-property style, colour and material direction — so products chosen room by room read as one system.

Main output

A style & finish direction.

The problem — Products chosen room by room drift in colour, finish and proportion — the home stops reading as one system.

Style Adaptation can coordinate suitable ALUMAX cabinet systems — including FLYHOME P6 cabinetry — where appropriate to the room and moisture exposure.

Included in this price
  • Style direction
  • Whole-property colour & material direction
  • Space plan
  • Moodboard
  • Concept visuals
  • Furniture / cabinet & finish harmonization notes

See a sample of these documents

You need to arrange
Product supply and installation, which is ALUMAX's scope; ELS technical site survey, feasibility check and specification; Construction drawings; Multi-trade coordination; Anything outside the agreed direction.
Who executes
Nobody builds from this service. It settles the direction; the products are supplied and installed by ALUMAX, and any other trade is appointed by you — once a specification exists to build from.
Fee basis & payment
Fixed fee for the room count agreed, payable per the approved offer terms.
Inputs, stages, approvals and revisions
Required inputs
Property type, rooms, photos, rough dimensions and your style references.
Decision stages
Brief → design direction → sign-off before you spend on a quotation.
Work sequence
Stages 1–2 of the ten-stage work sequence
You approve
The style and the whole-property colour & material direction.
Revisions
After sign-off, the first 2 major changes are included; further major changes are charged per the approved offer terms.

What happens next — Configure the products with ALUMAX.

See the full service page
Service 02

Design & Specification

For homeowners preparing to build or quote — you want a documented, room-by-room specification a contractor and ALUMAX can price and build against, not just a look.

Recommended when you need a buildable specification
RM1,600from · for one room · excl. SSTFour rooms RM5,600. Each room beyond the fourth is RM1,600.
ELS determines

Every room's layout, materials, cabinet, lighting and electrical requirements.

Main output

An approved, room-by-room specification, developed for procurement and trade coordination.

The problem — Without a written specification, contractors price different scopes, and wet-zone materials are easy to get wrong.

Included in this price
  • Site feasibility check, against the ELS technical site survey (charged separately: from RM300 in Sibu, RM500 outstation, excl. SST)
  • Room-by-room specifications
  • Cabinet requirements & moisture-zone materials
  • Lighting direction
  • Surface / colour / material schedule
  • Electrical & appliance planning notes
  • Budget-sensitive upgrade suggestions
  • Guidance on where to find the right materials and contractors

See a sample of these documents

You need to arrange
Product supply and installation, which is ALUMAX's scope; Construction-standard drawings outside ALUMAX scope; Multi-trade site coordination — that is ELS+ (Design and build); The ELS technical site survey, which is charged separately.
Who executes
ELS produces the specification; it does not build. ALUMAX supplies and installs its own products under its own warranty, and every other trade — electrical, plumbing, tiling, ceiling, waterproofing — is contracted directly by you, to this specification.
Fee basis & payment
Per room, at the published rate, payable per the approved offer terms.
Inputs, stages, approvals and revisions
Required inputs
Property type, rooms, photos, rough dimensions, your style direction and appliance / product intentions.
Decision stages
Direction → room-by-room specification → sign-off before quotation and production.
Work sequence
Stages 1–4 of the ten-stage work sequence
You approve
Your materials, cabinet, lighting and electrical decisions before anyone quotes or builds.
Revisions
After sign-off, the first 2 major changes are included; further major changes are charged per the approved offer terms.

What happens next — Give the same specification to ALUMAX and each contractor, and ask each for a written exclusion list. Choose ELS+ (Design and build) if you want the works delivered under one ELS+ contract.

See the full service page
Service 03

ELS+ (Design and build)

One agreed scope, coordinated through to handover.

For multi-trade renovation projects — several trades, wet areas and site constraints, with each trade's information coordinated to one approved scope.

ELS+ is taking a limited number of projects, by assessment.

Project basis
ELS determines

The scope and the interfaces between trades. Your contract for the works is with ELS Design and Build; your proposal names each trade and what it supplies.

Main output

One coordinated execution scope.

The problem — When trades work from different information, clashes and rework are more likely.

Included in this price
  • Trade scope matrix
  • Identifying and evaluating the appropriate OEM, fabricator or specialist for the approved design
  • Procurement and logistics coordination
  • Basic quality-control checkpoints
  • Foreman coordination sheets
  • Material schedules
  • Approval checklist
  • QC checklist
  • Variation control
  • Handover documentation

See a sample of these documents

You need to arrange
ALUMAX products, either within the ELS+ contract or contracted directly by you; your proposal states which; Specialist scopes — waterproofing, façade, drainage, ventilation — quoted per project.
Who executes
ELS+: Your proposal names each trade and what it supplies. ALUMAX products, either within the ELS+ contract or contracted directly by you; your proposal states which. Under Style Adaptation, Design & Specification and Bespoke: ELS may prepare/recommend a sequence and identify dependencies, but does not direct labour or assume contractor programme control. The works are priced by a project-basis quotation; a design, assessment or management fee is not the cost of the renovation.
Fee basis & payment
Quoted per project against the agreed scope. Defects, warranty and payments are set in your proposal.
Inputs, stages, approvals and revisions
Required inputs
Site measurement, an approved specification and the products your proposal states.
Decision stages
Scope → approve → coordinate → inspect & handover.
Work sequence
Stages 1–4 of the ten-stage work sequence
You approve
Scope, materials, drawings, price and timeline before work proceeds.
Revisions
After sign-off, the first 2 major changes are included; further major changes are charged per the approved offer terms.

What happens next — Start the Pre-Check to map the trades and scope, then we quote by project.

See the full service page
Optional—priced separately
The ELS technical site survey, which is charged separately
To confirm before order
Any measurement, access, compatibility or technical point not yet settled. It is shown as open in your written proposal when it applies.

Add-on — Feature Space Design: for a feature wall or important room a standard product can't solve — a TV wall, island, entrance, bar, study or prayer room. Attaches to any service above, quoted per project.

About the upgrade
Add-on · Construction Visualisation

Not ready for full design? Visualise the direction first.

Turn room photographs and product selections into concept visuals, comparisons and short videos — before technical development begins. Concept only.

Explore visualisation
The execution chain

Design is only the beginning

Under Design & Specification, multi-trade site coordination is not included — that is ELS+ (Design and build), where your proposal sets what is coordinated.

A premium interior is not created by drawings alone.

Once the design is approved, the difficult work begins: finding the right materials, matching finishes across different suppliers, recommending capable specialists for your selection, recommending the order of the trades, resolving site conditions, planning the protection of completed work and giving every contractor the same design intent to work to.

ELS coordinates the information for this process as part of the project; the trades you appoint carry out the work.

Materials are selected for the design — not the other way around

ELS is not tied to a single factory, cabinet system or material catalogue.

For each project, we may specify from different OEMs, local fabricators, specialist suppliers and trades according to the design, technical requirements, budget and site conditions.

This can include:

  • custom cabinetry and joinery
  • aluminium systems and specialist metalwork
  • glass and mirrors
  • stone and solid surfaces
  • hardware and accessories
  • lighting components
  • doors and architectural finishes
  • custom furniture
  • specialist coatings and decorative finishes
  • wet-area and service-zone materials

A material is not approved simply because it looks correct in a sample. ELS also considers suitability, dimensions, edge treatment, fabrication capability, installation method, maintenance, service access, replacement availability and compatibility with surrounding work.

The right specialist matters

Complex work cannot always be assigned to the cheapest or most convenient contractor.

Some details require installers or fabricators with the right equipment, workmanship standard and experience.

ELS therefore reviews a trade's suitability for the work it would carry out — a preliminary review for your selection, not an appointment or an acceptance of its work.

A contractor who is suitable for standard cabinetry may not be suitable for detailed veneer work.

A general aluminium fabricator may not be appropriate for a fine-profile architectural system.

A normal electrician may complete wiring correctly but may not understand the positioning and concealment required for an integrated lighting detail.

For critical work, ELS may specify the required finish standard, mock-up, sample and installation tolerance, and recommend a suitable specialist, before work proceeds; the method stays with the trade.

Trade sequence is part of the design

Many defects do not come from poor materials. They come from doing the right work in the wrong order.

ELS recommends the order between trades and identifies the dependencies, so that work which could damage, block or compromise completed work is flagged before it starts.

Typical coordination may involve:

  1. site preparation and protection
  2. demolition and setting-out
  3. plumbing, electrical and air-conditioning first fix
  4. pipe and penetration tests
  5. masonry and substrate preparation
  6. concealed services inspected before they are covered
  7. waterproofing and flood test
  8. screed and falls
  9. ceiling, tiling and flooring, in the order agreed for the project
  10. door and window interfaces
  11. wall finishes and painting
  12. cabinetry and built-ins
  13. stone, glass and specialist finishes
  14. lighting, accessories and final fixtures
  15. testing, rectification and handover

The actual sequence is adjusted to the project because interfaces between trades are often more important than the individual trades themselves.

The ceiling closes only after the concealed services have been inspected and the wet-area test has been accepted. The order of ceiling, tiling and flooring is agreed for each project. This is a dependency sequence, not a rigid calendar. See the ten-stage work sequence

We coordinate the gaps between contractors

On a multi-trade project, problems frequently occur between scopes:

  • Who prepares the opening before the aluminium installer arrives?
  • Who provides the backing required for a heavy cabinet?
  • Who confirms the final plumbing position before the stone is cut?
  • Who coordinates the ceiling opening with the lighting profile?
  • Who protects finished flooring while cabinetry is installed?
  • Who resolves a dimension that differs from the drawing?

ELS maps these interfaces and records who is responsible for each, so the question is answered before work starts.

Procurement needs coordinating too

For bespoke projects, procurement is not simply purchasing products from a list.

ELS coordinates:

  • specifications and approved samples
  • supplier and OEM selection
  • fabrication drawings where required
  • quantities and dimensions
  • lead times
  • production sequence
  • delivery timing
  • site storage constraints
  • replacement risk
  • installation readiness
  • compatibility between suppliers

Where a design requires a specialist product, ELS may specify beyond the normal ALUMAX product range rather than redesigning the project around what happens to be readily available.

Site conditions are reviewed before work proceeds

Construction inevitably produces conditions that cannot be completely resolved on screen.

Existing walls may not be straight. Service points may differ from drawings. Structural conditions may only become visible after demolition. Products from different manufacturers may have conflicting tolerances.

ELS reviews these conditions against the design intent and technical requirements before advising how the work should proceed.

The objective is not simply to “make it fit”.

The objective is to preserve the intended proportion, alignment, functionality and finish while finding a buildable solution.

Premium execution requires selective workmanship

ELS does not assume that every contractor is suitable for every detail.

For visually or technically sensitive work, the specification may call for:

  • approved material samples
  • workmanship samples or mock-ups
  • fabrication details
  • installation checks
  • hold points before subsequent work proceeds
  • dimensional verification
  • alignment and junction checks
  • protection of completed finishes
  • rectification before handover

This selective approach can make procurement and construction more demanding, but it is necessary when the project depends on multiple materials and specialists working together as one finished space.

What ELS is really coordinating

ELS coordinates four things simultaneously:

Design intent
How the completed space should look, function and feel.
Technical compatibility
How materials, dimensions, services and construction systems work together.
Procurement
Who can manufacture or supply each component to the required standard.
Execution
The recommended order in which trades enter the site, what must be completed beforehand and what must be protected afterwards.

This is why ELS projects are fundamentally different from straightforward supply-and-install work.

For standard cabinets, office furniture, accessories and doors or windows with limited design complexity, ALUMAX provides a simpler supply-and-install route.

When the outcome depends on custom detailing, multiple suppliers, specialist workmanship and careful coordination between trades, that is when ELS's coordination service is most useful.

Visit ALUMAX

Deliverables

What you walk away with

Not a menu of capabilities — and not every service includes everything. Here's what each of the three produces.

DeliverableStyle AdaptationDesign & SpecificationELS+ (Design and build)
Style & finish direction✓✓✓
Concept visual✓✓✓
Space plan✓✓✓
Room layout—✓✓
Cabinet specification—✓✓
Lighting / M&E notes—✓✓
Material schedule—✓✓
Trade scope matrix—Optional✓
Foreman sheets——✓
Staged QC——✓
Handover pack——✓

See sample deliverables

Add-ons

Everything, or only what you need.

Take one Managed Project Engagement, or pick individual ELS add-ons around the three ELS services.

One engagement

Managed Project Engagement

Runs the services you commission as one engagement, from design through coordinated handover. Product and trade costs are quoted separately. The 8% covers coordination only; design fees are charged separately.

From RM4,0008% of coordinated value · min RM4,000 · capped by home typeSee the engagement

Or, à la carte

See all add-ons
Estimate your fee

What ELS publishes, before you ask for a quote.

The starting fee and site measurement are fixed. Your project's fee is confirmed against the rooms and scope in your brief.

Which service?
How many rooms / zones?
Location
Fee for your rooms

RM4,800

+ ELS technical site survey RM300 (Sibu), excl. SST.

Design & Specification.

Next: send your rooms and photos for a real fee against your scope.

Enquire

Read from ELS's approved rate card for the rooms you selected. Your fee is confirmed on the approved brief and scope. All fees exclude SST.

This is ELS's own design and coordination fee only — not the whole renovation. See how a whole renovation budget splits three ways

What you pay, and to whom

Four separate things. Two of them are measurements.

ELS charges for design and for its own technical site survey. ALUMAX measures before a product order, and the deposit is a commitment against that order — not a design fee. ALUMAX states that this measurement is free within the Sibu local service area, and that travel for outstation projects is quoted in advance (alumax.pro, checked 19 Oct 2026).

ELSfrom RM800 for one room · excl. SST

ELS design fee

The design work itself — direction, specification or coordination, depending on the service you engage.

Not a product price, and not a deposit. Nothing is manufactured or installed against this fee.

ELSRM300 (Sibu)

ELS technical site survey

The measured basis a specification is checked against, so what is drawn can actually be built in your house.

Not the ALUMAX product measurement below. This visit exists to check a specification against the measured site, not to price a product order.

ALUMAXFree in Sibu (ALUMAX)

ALUMAX product measurement

The manufacturing and installation dimensions for a product order, and the final product price. ALUMAX states that site measurement is free within the Sibu local service area, and that travel for outstation projects is quoted in advance (alumax.pro, checked 19 Oct 2026).

Not a design service, and not the measured basis for a specification. It measures what ALUMAX will supply and install, not the whole house.

ALUMAX

Product-order deposit

The deposit follows ALUMAX's quotation and terms.

Nothing by itself — it is your commitment to the order, and it is what releases procurement and works.

Not a design fee, and not payment for either measurement. It counts toward the product order, not toward ELS's work.

Starting prices
EngagementFrom
ELS technical site surveyfrom RM300 (Sibu) / RM500 outstation
Style Adaptationfrom RM800 excl. SSTfor one room · Four rooms RM2,800. Each room beyond the fourth is RM800.
Design & Specificationfrom RM1,600 excl. SSTfor one room · Four rooms RM5,600. Each room beyond the fourth is RM1,600.
ELS+ (Design and build)Project basis

The ELS technical site survey captures the dimensions, levels and site conditions the design, specification and coordination are built on. That is different from the free in-home product measurement ALUMAX runs in Sibu to prepare a product-supply quote. The ELS survey is paid; the fee is credited in full against a qualifying confirmation within 60 days, and conditions apply — the full terms are on the Free and paid page. A travel fee applies for outstation Sarawak locations. Final quotation depends on site measurement, material selection, approved scope, access condition and final technical requirements. Full coordination is quoted by project scope.

Not sure where to start?

Tell us about your space — we'll recommend the right service.

Enquire

Browse our published examples freely. Matching references to your property, adapting layouts or finishes, and developing drawings begins within a paid ELS service.

ELS

ELS designs, specifies and coordinates.
ALUMAX supplies and installs.

ELS designs and specifies, selects the most appropriate OEM or supplier, and coordinates execution. ALUMAX supplies and installs its defined product families when those products suit the specification.

Who is responsible for what
PartyResponsibility
ALUMAXALUMAX supplies and installs its defined product families when they suit the specification — it specifies products, works with selected manufacturing partners, reviews available production quality records and checks supplied products against the confirmed order, and manages delivery, installation and product warranty.
ELSDesign, specification and coordination across multiple products/trades.
Appointed tradesElectrical, plumbing, tiling, ceiling, waterproofing and specialist works. Independent specialist works are not included within ALUMAX's scope unless a separate contracting arrangement has been expressly established and approved for that category of work.
Where to start

Already know the product you need? Go straight to ALUMAX. Need help deciding layout, material, colour, specification or trade coordination? Start with ELS.

Product-only ALUMAX: +60 11-1118 3906
Design & coordination ELS: +60 16 896 3906

Visit ALUMAX
Product ecosystem

Two production routes, one supplier you deal with — ALUMAX picks the right one for each product.

Standardized
FLYHOME · Ready to Assemble
Made-to-spec
PlywoodACPHoneycombAluminiumGlassCommercial furniture
How we work

From first brief
to final handover

Clear deliverables and checkpoints at each stage — so the project's stage and its next step are on record.

See the full workflow
  1. 01

    Design

    The space, the brief and the design intent come first.

  2. 02

    Specification

    Materials, dimensions, services and details are set down and checked to work together.

  3. 03

    Procurement

    Suppliers, OEMs and fabricators are selected for what the design requires; samples, quantities, lead times and delivery timing are coordinated.

  4. 04

    Trade Coordination

    A trade sequence is recommended, and the interfaces between trades are coordinated.

  5. 05

    Site Decisions

    Site conditions are reviewed against the design intent before the work proceeds.

  6. 06

    Handover

    Testing and rectification come before the finished space is handed over.

These six parts are ELS's method, not the order of the work. The order of the work is the ten-stage work sequence. See the ten-stage work sequence

How we keep it clean

The honest part

01

Specialist partners

We don't pretend every trade is in-house. We coordinate each selected specialist's information to one approved scope, one drawing set and one standard, so each works from the same documents.

02

Quotes follow the site

No price is final before a site check. The real quotation follows measurement, material selection, approved scope and access conditions. An approved quote defines its scope and assumptions; unforeseen conditions and variations are assessed separately.

03

Changes use variation orders

Changed your mind after approval? That's fine — it runs through a variation order, so cost, timeline and materials stay clear and agreed before anything moves.

04

No empty guarantees

We plan for what we can anticipate, check important interfaces, and help manage problems when they arise.

Services in Sarawak

Renovation services across Sibu & Sarawak

Your vision, thoughtfully designed and coordinated through to completion.

Tell us about your space. We'll map the right path.

Planned for Sarawak heat, humidity, moisture risk and daily use.