Renovation budget · Sarawak

What does your budget show as scope?

Renovation is one of the biggest things a household spends on, so the useful question is what to solve first and what to leave for later. This page is a guide to scope and priorities, with two planning figures for a worked terrace. It is not a quotation: the real figure is set after a site survey.

Scope illustration — not a price, a quotation or a package; what a project includes is set by its own survey and scope. Apart from the two planning estimates below, this page shows no amount. FF&E and styling are a separate decision.

Indicative planning estimates

Two whole-house figures, for one worked terrace

Both are for a 3-bed double-storey terrace. They are rounded, indicative planning estimates, not quotations.

  • A full rebuild of a second-hand terrace, with new wiring and piping: about RM480,000 (Essential) to RM690,000 (Premium).
  • A new terrace furnished before move-in: about RM80,000 to RM120,000, before the ALUMAX kitchen cabinets and wardrobes, which ALUMAX quotes separately.

A full rebuild of a second-hand house costs far more than a room or kitchen budget. The rebuild total includes ELS's own allowance for built-in work: an ALUMAX quotation for work that allowance already covers takes its place and is not added on top. The furnished terrace leaves out ALUMAX kitchen cabinets and wardrobes, so their quotation is added. Which built-in work is covered is confirmed after a site survey.

Three routes

Three separate routes

  • ELS Studio Commissioned design and specification. ELS Design & Specification provides the agreed design deliverables.
  • ELS+ Delivery of the works in its contract, priced after assessment. ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.
  • Managed Project Engagement A separate coordination arrangement, not ELS+ delivery. The Managed Project Engagement is taken on by assessment. Its fee and terms are on the design packages page.
See the Managed Project Engagement's terms
What to prioritise first

Fix what is expensive to change first

  • Fix the expensive-to-change things first: wet zones, layout and services.
  • Leave the cheap-to-add layer for a later phase: feature walls, styling and spare rooms.
  • Don't spread the budget evenly across every room.
One scope example
Scope illustration

A kitchen and one or two connected areas.

The kitchen plus one or two connected areas — a dry kitchen, a TV wall, a wardrobe — or the main rooms of a smaller home.

Finish tier

Essential throughout, with Signature on the surfaces you touch and see every day.

Prioritise
  • A coordinated wet + dry kitchen.
  • Layered lighting and a first air-conditioning zone.
  • Storage that fits how you actually cook and live.
Leave for now
  • Redoing every ceiling — keep the sound ones, spend on the wet/dry kitchen.
  • Wardrobes for every room at once — do the daily-use rooms first.
  • Decorative feature walls — the last, most replaceable layer.
Where the money goes

Three lines of cost, and a reserve kept apart

Every scope illustration has the same three lines of planned spend: products, professional fees and trades. Any contingency reserve is held by you, apart from them. What each comes to on your project is confirmed after a site survey. ALUMAX quotes its own products separately. If you appoint the trades yourself, each trade quotes its own work. Under ELS+, see the ELS+ route above.

Products
Cabinets, aluminium windows & screens, composite panels, hardware and internals — supplied and installed by ALUMAX. The real figure is ALUMAX's.
Professional fees and input (allowance)
A budgeting allowance, not an ELS quotation. It may include ELS fees, technical surveys, specialist consultants, submissions and additional project documentation. ELS's actual fee follows the published service rate.
Trades
Electrical, plumbing, tiling, ceiling, painting, air-conditioning and flooring — quoted and executed by appointed trades.
Contingency
These three lines split the planned spend. Keep any contingency reserve of your own apart from them — held by you, separate from ELS's fees and from the planned works.
Hidden-cost checklist
  • Items with no line of their own: access panels, the kitchen sink and taps, and air-conditioning routes.
  • Whether anti-termite treatment is in or out of the quote. Decide it before pre-works begin.
  • Long wiring or pipe runs, an uneven slab, or a weak wall that needs treating first.
  • Changes after first fix, and spare tiles for wastage and repairs.