How we work: your ELS project, step by step
A good renovation is calm because everyone knows what happens next, who decides, and what a change will mean before it happens. This page sets that out up front, so there are no surprises later. Your written proposal confirms the details for your project.
1. Choose how we work together
| Package A: Design | Package B: Coordination | ELS Design & Build (partial scope only) | |
|---|---|---|---|
| Who it suits | You want the design fully resolved, and your own main contractor will build it. | Your design is already complete enough to build from, and you want ELS to coordinate the trades and checks. | One room or one package (for example a kitchen) that ELS designs and delivers. Taken on by assessment. Not offered for a whole house. |
| What ELS does | Brief and site measure, space plan, style, colour and material board, renders, drawings and a specification pack. | Reviews your design pack for buildability gaps, sets the trade sequence and hold points, keeps the variation record, runs quality checks and prepares handover records. | Everything in Package A and Package B for that scope, plus delivery of the contracted works. |
| What ELS does not do | Site management, trade coordination or build responsibility. | Design or redesign, or contracting the works. | Work outside the written scope. |
| Where it ends | Once your specification pack is issued and the design fee is settled. | At handover. | At handover. |
Prices for each package are printed on our Packages page. Your proposal lists exactly what is included and what is not. Anything not listed is not included.
2. Your expected timeline
Every project follows the same ten stages. We do not publish fixed durations, because every home, site and scope is different. Your proposal sets out the programme for your project.
| Stage | What happens | Your approval | Typical duration |
|---|---|---|---|
| 1. Brief and survey | Room needs, budget, what stays, measurements and what is still uncertain are written down. | Budget and space plan sign-off | Confirmed in your proposal |
| 2. Room concept and decisions | Layout, palette and functional choices are proposed and checked for feasibility. | Design direction approval | Confirmed in your proposal |
| 3. Coordinated technical design | Drawings, dimensions, junctions, services and access are worked out so the trades review their interfaces together. | Technical specification approval | Confirmed in your proposal |
| 4. Scope, cost and purchase release | Work packages, responsibilities and the programme are agreed; purchases are authorised against approved specifications. | Procurement approval, including your cabinetry colour, finish and material sign-off before any cabinetry is ordered | Confirmed in your proposal |
| 5. Site preparation | Protection, access and removal are planned; site conditions are investigated. | Production release, before anything is fabricated | Confirmed in your proposal |
| 6. First fix and substrates | Masonry, plumbing, electrical, air-conditioning, framing and backing. | — | Confirmed in your proposal |
| 7. Waterproofing and finishes | Waterproofing, tiling, ceilings, flooring and painting, in the agreed order. | — | Confirmed in your proposal |
| 8. Fabrication and installation | Cabinetry, stone, glass, metalwork and doors, made and fitted to verified site dimensions. | — | Confirmed in your proposal |
| 9. Second fix and furnishing | Sanitary and electrical fittings, appliances, curtains and furniture. | — | Confirmed in your proposal |
| 10. Commissioning and handover | Testing, rectification and demonstration; defects, care information and the responsibility record are handed over. | Handover acceptance | Confirmed in your proposal |
3. The six sign-off points
There are six main sign-off points. At each one, we send you the issued document as a PDF with its title and version. You approve it by replying on WhatsApp from your registered number, naming the document and version. The ELS lead signs off the same document. We move to the next step only once both approvals are saved in your project folder.
| Sign-off point | What you approve on WhatsApp | What ELS is responsible for |
|---|---|---|
| 1. Budget and space plan | The written scope, the budget structure and the space plan. | A measured brief, a clear written scope and a space plan that fits how you live. The ELS lead signs off. |
| 2. Design direction | The style, the specification level and the functional direction. | One clear design direction, checked for feasibility. The ELS lead signs off. |
| 3. Technical specification | The drawings, renders, services layout and finish schedule. | A coordinated technical design, with door swings, drawers, sockets and appliances checked. The ELS lead signs off. |
| 4. Procurement | What will be purchased, against the approved specification, and your cabinetry colours, finishes and materials. | A purchase list matched to the approved specification, with any gaps flagged. The ELS lead signs off. |
| 5. Production release | Release for fabrication, once the site is ready and final measurements are taken. | Final site measurements, the trade sequence and the hold-point checks. The ELS lead signs off. |
| 6. Handover | The finished works, with any open items written down. | Quality checks, snagging with photos and fix dates, and the care and warranty pack. The ELS lead signs off. |
Which sign-off points apply depends on your package: Package A covers points 1 to 3. Package B covers points 1 and 3 to 6 (at point 3, you confirm your supplied design is the technical basis). Design & Build covers all six.
4. Who does what
| You | ELS | |
|---|---|---|
| Brief and budget | Share a complete brief and your own budget figure. | Measure on site and write the brief, scope and budget structure. |
| Decisions | Make decisions on time and approve each sign-off point on WhatsApp. | Give you clear options and issue each document for approval. |
| Design | Package B: supply a complete design and name the designer who answers design questions. | Packages A and Design & Build: produce the design and specification. |
| Contractor and trades | Packages A and B: appoint your main contractor and trades. | Package B and Design & Build: coordinate the trades and run the hold-point checks. |
| Changes | Approve every change in writing, with its cost and time, before it goes ahead. | Record every change in the variation record, priced and with its time impact. |
| Payment | Pay on the agreed schedule. | Issue clear invoices against the agreed schedule. |
| Handover | Inspect the works and confirm handover. | Fix snags, hand over care and warranty information, and document any open items. |
5. Changes: what is included and what is not
We want you to be sure before anything is built, so some changes are included. Here is how each kind of change works.
Design changes (design work only). After a design sign-off, your first 2 major design changes are included. A 3rd major design change, or any after it, is treated as a new project with a new design fee. This allowance applies to design work only, not to coordination or site work.
What counts as major. A major change alters the approved layout or specification after sign-off. Swapping a colour, finish or material within the approved layout is a minor change at no charge, as long as it happens before your cabinetry sign-off.
Cabinetry sign-off comes before the order. To protect your timeline, ELS usually orders cabinetry early. So before any cabinetry is ordered, you sign off its colours, finishes and materials in writing, by WhatsApp, on the issued specification. After that sign-off, any change is a major change, even if the order has not yet been placed. If the cabinetry has been ordered, the supplier's remake or re-order cost is charged to you as a variation. The only exception is if we hold no saved sign-off from you for what was ordered.
Coordination rework. On coordination work, rework is free of charge up to RM3,000 or 10% of your committed project amount, whichever is higher. Your committed project amount is your signed contract sum plus any approved variations, so the limit grows as variations are approved. Rework is valued at our selling price. Beyond that limit, rework is a priced variation.
Variations. Any other change after a sign-off is a variation. We confirm its cost and its effect on the timeline in writing, and it goes ahead only after you approve it.
6. Fees and payment
- Payment for an ELS package is 60 / 35 / 5. An ELS quotation is valid for 14 days from its date unless stated otherwise.
- Design fees are a separate service. They are not credited or offset against build or works costs. The only exception is kitchen design under our ALUMAX only channel, where your proposal says so.
- Prices are as printed on our Packages page or as set out in your proposal.
7. Before we start
Before the first sign-off, you receive and confirm:
- Your package and written scope, including what is not included.
- The ten stages and six sign-off points, and how WhatsApp approval works.
- Your expected timeline, as set out in your proposal.
- Who does what for your package.
- The fees, payment schedule and the design-fee rule.
- The change rules on this page: design changes, cabinetry sign-off, coordination rework and variations.
You confirm by replying on WhatsApp to the issued pack. We keep a copy in your project folder.