BETAWe're refining the site during beta testing.Until Share feedback
The project record standard

How every completed ELS project will be documented.

The record every completed ELS project will carry — the initial problem, the actual measurement, the approved drawings, site and completed photography, the QC checklist and a verified client quote. The samples below show that structure; real photography and quotes are added only once verified.

This library is being populated with verified projects. Each completed job will be captured at 13 stages — before photos through to professional finished photography, the QC checklist and a verified client quote. The cards below show that record structure; the photography and quotes are added as each project is documented. How we document every project

What counts as evidence

  • Completed projects

    None yet

    A job that was built, photographed after handover and signed off — with the QC record and the client's own words behind it.

    None published yet. ELS will not publish one until the four proof stages, client-approved photography, a verified client quote and the QC record all exist — /projects sets out that standard in full. A project is shown as completed only when every one of them is in place.

  • Showroom installations

    None yet

    Built work you can stand in front of at Lanang — the same products and details, installed and touchable, without a client's home being involved.

    Not published on the site yet. A limited preview of the showroom can be visited by appointment now; what is missing is the photographed, captioned record of what is installed in it.

  • Design studies

    5

    Concept work — a real Sarawak problem worked through to a resolved design, with the reasoning shown. A study is never a photograph of something built, however convincing the image.

    See them
Illustrative record — a wet and dry kitchen: taupe handleless dry run with a tall oak shelf, a breakfast bar with two stools, and a grey wet kitchen with a wall hood beyond.
Project Record Example
Illustrative Project Record — not a completed ALUMAX/ELS project
Sibu · Mid-terrace

Wet + dry kitchen

Value band
e.g. RM35k–RM45k
Materials
Plywood + honeycomb
Duration
Not recorded
QC
Staged QC
Completed photo
Pending
Open the record
Illustrative record — a three-panel strip: living-dining with a staircase, an island kitchen with an oven tower, and a bedroom with a wardrobe and dressing niche.
Project Record Example
Illustrative Project Record — not a completed ALUMAX/ELS project
Sibu · Semi-detached

Full-home renovation

Value band
e.g. RM120k–RM160k
Materials
ACP + honeycomb (wet zones) + P6 (dry zones)
Duration
Not recorded
QC
Staged QC
Completed photo
Pending
Open the record
Project Record Example
Kuching · Shophouse

Flood-resilient wet kitchen

Value band
e.g. RM40k–RM55k
Materials
Full aluminium + honeycomb
Duration
Not recorded
QC
Staged QC
Completed photo
Pending
Open the record
Project Record Example
StayReady · Sibu · 2-bedroom condo

Full Furnish — short-stay ready

Value band
e.g. RM25k–RM40k
Package
e.g. Full Furnish · Plus
Max downtime
Not recorded
Units
e.g. 1 unit
Open the record
Project Record Example
Commercial · Sibu · Shoplot

Shoplot Reset — façade, lighting, display, cashier

Value band
e.g. Quotation-based
Materials
Retained shell · new display + counter systems
Duration
Not recorded
QC
Staged QC
Open the record
Project Record Example
Developer · Sibu · Terrace development

Multi-unit standardisation — one spec, repeated

Value band
e.g. Quotation-based
Materials
Prototype → freeze → repeat
Units
e.g. 12 units
QC
Staged QC
Open the record

Value bands are ranges, not fixed prices; final cost follows site measurement and approved scope. Completed photography, QC records and client quotes are published only once verified — nothing here is a concept render presented as a finished home.