Full-home renovation
The problem — Moisture across wet zones, solved with ACP + honeycomb (wet zones) + P6 (dry zones) and documented at every stage.
Sample record — the 13-stage structure a completed ELS project carries. Photography, the QC checklist, the client quote and the after-sales log are added once verified; nothing on this page is presented as real until it is.
- 01
Before
Pending5–10 photos
The room exactly as we found it — the honest starting point.
5–10 photos · Pending - 02
Measurement
PendingMeasurement sheet
Every dimension taken on site, not assumed.
Pending - 03
Design
PendingRender
The agreed look, before a single panel is cut.
Pending - 04
Technical
PendingApproved drawing
The signed-off drawing production works to.
Pending - 05
Material
PendingMaterial schedule
Exactly what goes in — grade, finish and quantity.
Pending - 06
Production
Pending2–5 fabrication photos
The panels being built to the approved drawing.
2–5 photos · Pending - 07
Installation
Pending5–10 installation photos
The fit-out on site, step by step.
5–10 photos · Pending - 08
QC
PendingChecklist
The signed quality checklist — snags and all.
Signed QC checklist · Pending
- 09
Finished
PendingProfessional photography
The completed room, properly shot.
Pending - 10
Client
PendingShort quote / testimonial
The client's own words, verified before use.
Verified quote · Pending
- 11
Commercial
Value band
An honest range, never a fabricated exact figure.
RM120k–RM160k
- 12
Timeline
Actual weeks
How long it really took, start to handover.
14 weeks
- 13
After-sales
PendingAny snag + resolution
What came back, and how we closed it.
No snags logged after handover · Pending
Verified client quote — added once the project is documented and the client has approved it for use.
Start with a free Pre-Check — we'll map the risk and the right scope.
Start Pre-Check