Premium kitchen renovation
ELS design, ALUMAX cabinetry and products, ELS+ wet works and specialist coordination.
Approved designs brought together through selected contractors and specialist trades, with defined scope, site coordination, quality checks and handover.
ELS+ starts with two defined offers.
ELS design, ALUMAX cabinetry and products, ELS+ wet works and specialist coordination.
A defined renovation scope with clear exclusions, suitable for homeowner or StayReady projects.
Other projects are assessed case by case.
Each proposal states who contracts each trade.
Coordination is not a promise of an outcome or a date. What is committed is set in your proposal.
ALUMAX is a product supply and installation partner within the project. ELS tells you when a recommendation involves ALUMAX or another commercial partner.
Grouped by what your project needs, not as a list of contractors. Your proposal names who carries out each item.
Structural work is assessed separately, with an engineer. ELS+ coordinates the engineer and the qualified execution team; contractor workmanship alone does not establish whether an alteration is structurally appropriate.
A site review and project assessment, including any structural question for an engineer.
ELS designs and specifies; the approved design is the basis of the works.
Drawings, specifications, inclusions, exclusions and payment stages are set in your proposal.
The selected contractors and specialist trades carry out the works, coordinated by ELS+.
Checks at the stages set in your proposal, including before concealment.
A documented handover: defects, rectification ownership, warranties and maintenance information are recorded.
Quality is a delivery standard, not a description of the trades.
Completed work is inspected and references are checked before a trade is selected for your proposal.
Materials, quantities, exclusions, preparation and variation rates are defined in writing.
Visible finishes, junctions and workmanship are confirmed before full installation.
Waterproofing, services and concealed construction are checked at the stages set in your proposal.
Defects, rectification ownership, warranties and maintenance information are recorded.
Material approvals, samples, inspection stages, progress records and defect tracking.
Defect tracking is a record of what is found. How defects are rectified is set in your proposal.
ELS's service targets: Site Observation Report issued within 36 hours of each milestone visit; a standard technical query (RFI) answered within 5 working days.
Each ELS+ proposal names the business you contract with, and defines five commitments.
This page sets no contract terms. Payments, defects and warranties are set in your proposal.
Coordination is quoted per project because scope, trades and site conditions vary — but the fee is built from a clear basis, so you always know how the number is formed.
A fixed-scope fee for a defined scope or a percentage of the coordinated works for larger multi-trade projects — whichever fits the size and length of the job.
A defined number of scheduled site inspections is included, set in the approved scope against the build programme.
Visits beyond the included inspections are charged at a per-visit rate, agreed up front.
Work outside Sibu carries a per-trip travel charge (for reference, the ELS technical site survey is from RM500 outstation versus RM300 in Sibu).
The applicable basis, the number of included inspections and the rates are set in your quotation after site measurement and an approved scope. All fees exclude SST.
No verified ELS+ project is published yet.
A project will be shown here only when it is verified. Until then, the specimen document pack shows the kind of records a project produces. It is a specimen, not a completed project.
See the specimen document packEach ELS+ proposal names the business you contract with, and who contracts each trade.
Payments are set in your proposal.
Defects and warranties are set in your proposal: defect reporting, the response process and the warranty terms that apply. Defects found at inspection and handover are recorded.
Changes are approved in writing, with their additional cost and time, before they proceed. How delays are handled is set in your proposal.
Structural alterations need a separate assessment and an engineer. They are subject to that assessment.
ALUMAX is a product supply and installation partner within the project. ELS tells you when a recommendation involves ALUMAX or another commercial partner.
The enquiry form opens with ELS+ Renovation Delivery already selected. Change it if it is not right.