ELS+ — Build & Delivery · ELS

Keep What Works. Improve What Matters.

ELS+ — Build & Delivery.

One agreed scope, coordinated through to handover.

Deliver the agreed construction and renovation works, with scheduling, quality checks and handover as set in your proposal.

ELS+ is taking a limited number of projects, by assessment.

ELS determines

The scope and the interfaces between trades. The contracting party is named in your written proposal, which also names each trade and what it supplies.

Main output

One coordinated execution scope.

Six answers before you enquire

The problem it solves
When trades work from different information, clashes and rework are more likely.
Who it is for
For multi-trade renovation projects — several trades, wet areas and site constraints, with each trade's information coordinated to one approved scope.
What is included
Delivery of the agreed construction and renovation works within the contracted scope. Your proposal names each trade and what it supplies.
Separate or to be confirmed
ALUMAX products, either within the ELS+ contract or contracted directly by you; your proposal states which; Specialist scopes — waterproofing, façade, drainage, ventilation — quoted per project.
How it relates to the other services
ELS+ delivers the contracted build. ELS Budget plans spending alongside the design, design is ELS Studio's, an ELS+ proposal can include specialist materials sourced through ELS Source, and ALUMAX supplies and installs its specified products.
What you can do next
Use “Request a build assessment” to open the enquiry with ELS+ selected. The price is set after assessment.

An enquiry, Pre-Check or brief does not reserve a start date; dates are set in your written quotation or proposal.

The contracting party is named in your written proposal.

What ELS and ELS+ check

How we select, specify, inspect and install—not simply how a factory makes something.

They resolve problems before those problems become expensive.

  • Layout corrections: Correct the plan before it is built. In an ELS Studio commission, when the site measurements held for the project change a dimension, ELS corrects the layout in the specification before cabinets are quoted.
  • Physical finish combinations: One palette, checked together. In an ELS Studio commission, finish samples are first looked at separately, then reviewed together as one palette, and ELS applies that palette in the concept.
  • Appliance-clearance checks: This door needs room to open. In an ELS Studio commission, when an appliance's position would make a door collide, ELS corrects the layout in the specification before cabinets are made.
  • Actual site inspections: Check the detail before it disappears. Under an ELS+ contract, when a junction is about to be covered by the next trade, ELS+ inspects it at the stage set in your proposal.

Suitable projects

ELS+ starts with two defined offers.

Priced after assessment

Premium kitchen renovation

ELS design, ALUMAX cabinetry and products, ELS+ wet works and specialist coordination.

Priced after assessment

Selected whole-unit refurbishment

A defined renovation scope with clear exclusions, suitable for homeowner or StayReady projects.

Other projects are assessed case by case.

Sibu as standard. Elsewhere in Sarawak by quotation, subject to schedule and capacity. ELS+ delivery outside Sibu is by assessment.

Repairs & Restoration: targeted repairs, quoted per task See Repairs & Restoration

Already an ELS client with an issue? Ask through the contact page. If it concerns work ELS contracted, say in your message that it is a defect in that work.

How prices work

  • The same scope, on the same terms, has the same price.
  • A lower budget means a different scope or specification.
  • The checks set in your specification or proposal stay in, whatever the budget.

What ELS+ delivers and coordinates

  • Coordination of the selected contractors and specialist trades named in your proposal.
  • Scheduling of the works against the programme in your proposal.
  • Site coordination between the trades.
  • Quality checks at the stages set in your proposal.
  • Handover records.

ALUMAX is a product supply and installation partner within the project. ELS tells you when a recommendation involves ALUMAX or another commercial partner.

Specialist capabilities

Grouped by what your project needs, not as a list of contractors. Your proposal names who carries out each item.

Some of these are carried out by partner trades appointed for each project; your proposal confirms each one before work starts.

Wet areas and surfaces

  • Wet works, waterproofing and tiling
  • Tile joint finishing and grouting

Joinery and metalwork

  • Carpentry and cabinetry
  • Stainless steel and iron fabrication

Building services

  • Electrical, plumbing and air-conditioning

Structural changes

  • Structural alterations, subject to project assessment and required professional involvement

Structural work is assessed separately, with an engineer. ELS+ coordinates the engineer and the qualified execution team; contractor workmanship alone does not establish whether an alteration is structurally appropriate.

Delivery process

  1. 01

    Assessment

    A site review and project assessment, including any structural question for an engineer.

  2. 02

    Design

    ELS designs and specifies; the approved design is the basis of the works.

  3. 03

    Agreed scope and price

    Drawings, specifications, inclusions, exclusions and payment stages are set in your proposal.

  4. 04

    Works

    The selected contractors and specialist trades carry out the works, coordinated by ELS+.

  5. 05

    Inspections, during works and before handover

    Checks at the stages set in your proposal, including before concealment.

  6. 06

    Handover

    A documented handover: defects, rectification ownership, warranties and maintenance information are recorded.

See how we work: stages, sign-offs and change rules

Quality controls

Quality is a delivery standard, not a description of the trades.

01

Verified relevant work

Completed work and references are checked as set in your proposal, before a trade is selected for it.

02

Written scope and pricing

Materials, quantities, exclusions, preparation and variation rates are defined in writing.

03

Approved samples

Visible finishes, junctions and workmanship are confirmed before full installation, as set in your proposal.

04

Inspection before concealment

Waterproofing, services and concealed construction are checked at the stages set in your proposal.

05

Documented handover

Defects, rectification ownership, warranties and maintenance information are recorded as set in your proposal.

Material approvals, samples, inspection stages, progress records and defect tracking.

Defect tracking is a record of what is found.

The written proposal sets the reporting and response times, who is accountable, and when each period starts.

How an ELS+ assessment works

What helps the assessment

  • Location
  • Rooms
  • Site condition
  • Intended work
  • Plans or photos, if you have them
  • A budget indication
  • Timing, where known

Details you do not know yet can be discussed. Plans and documents are not needed before the first conversation.

The sequence

  1. Enquiry
  2. Clarification
  3. Assessment and site information as required
  4. Written scope and proposal
  5. Written acceptance and applicable terms
  6. Confirmed scheduling and authorised work

Before any delivery commitment

ELS+ works are scheduled and authorised only after a written proposal has been accepted in writing under the applicable terms.

Your proposal

Each ELS+ proposal names the business you contract with, and defines five commitments.

Your proposal sets out the contracting parties, the scope by group, payments, milestones and who rectifies each part. Completion, dates and rectification obligations are the ones set in your contract.

Scope and price
Drawings, specifications, inclusions, exclusions and payment stages.
Completion
Programme, milestones and how delays are handled.
Changes
Written approval of additional cost and time before variations proceed.
Quality
Approved samples, inspection stages and acceptance criteria.
Rectification
Defect reporting, response process and applicable warranty terms.

This page sets no contract terms.

From the selected system to the finished room

ALUMAX supplies and installs its specified product. ELS+ prepares and finishes the surrounding openings, walls, ceilings, floors and services only where that work is included in its written contract.

These are potential scopes to inspect and quote, not automatic inclusions in every package.

Proposed detail — not a completed project

Kitchen cabinets

Existing condition
The wall, ceiling and services as measured on site.
Selected system
Cabinet sizes, fronts, hardware and internal fittings of the selected system.
Proposed site work
Wall fillers, finished end panels, a local ceiling bulkhead, backsplash and service interfaces.
Responsible party
ALUMAX installs the selected cabinets. ELS+ carries out the surrounding work only where your written contract includes it.
What to look for
Straight alignment, balanced fillers, neat junctions and accessible services.
Checks required
Site measurements, finished levels, services and access confirmed before the detail is fixed; appliance ventilation and maintenance access checked.
Proposed detail — not a completed project

Wardrobes and home storage

Existing condition
The ceiling height, wall and skirting as measured on site.
Selected system
Cabinet sizes, fronts, hardware and internal fittings of the selected system.
Proposed site work
Top closure, wall returns, skirting transitions, aligned fronts and lighting preparation.
Responsible party
ALUMAX installs the selected storage units. ELS+ carries out the surrounding work only where your written contract includes it.
What to look for
Consistent gaps, aligned fronts, clean end panels and coordinated lighting.
Checks required
Measurements and finished levels confirmed; lighting and power positions agreed before the top is closed.
Proposed detail — not a completed project

Doors

Existing condition
The opening, the frame position and the floor finish as measured on site.
Selected system
Approved door and frame sets, hardware and opening direction.
Proposed site work
Opening preparation, frame surrounds, plaster and paint reinstatement and the floor transition.
Responsible party
ALUMAX installs the selected doors. ELS+ carries out the surrounding work only where your written contract includes it.
What to look for
Even reveals, smooth operation, neat thresholds and tidy finishing.
Checks required
Opening level, plumb and square, and the finished-floor level, against the manufacturer's installation requirements. Structural changes and regulated work need competent review and approval.
Proposed detail — not a completed project

Windows

Existing condition
The opening, the sill and the surrounding finishes as measured on site.
Selected system
Approved frame systems, operations and selected sizes.
Proposed site work
Opening and sill preparation, reveals, sealing, drainage interfaces and reinstatement.
Responsible party
ALUMAX installs the selected windows. ELS+ carries out the surrounding work only where your written contract includes it.
What to look for
Straight surrounds, clean sealant lines and coordinated drainage details.
Checks required
Opening level, plumb and square against the manufacturer's installation requirements; waterproofing interfaces checked at the stages set in your proposal. Exterior openings need competent review and approval.
Proposed detail — not a completed project

Office furniture

Existing condition
The floor plan, the power and data positions and the wall finishes as found.
Selected system
Desk sizes, storage units and workstation combinations of the selected system.
Proposed site work
Workstation alignment, power and data preparation, partitions and accessible cable management.
Responsible party
ALUMAX installs the selected furniture. ELS+ carries out the surrounding work only where your written contract includes it.
What to look for
Aligned workstations, concealed but accessible wiring and usable storage.
Checks required
Power and data positions confirmed before furniture is fixed; wiring access checked.
Proposed detail — not a completed project

Glassworks

Existing condition
The supporting surfaces and the adjoining tile or plaster as measured on site.
Selected system
Profiles, fittings and approved assemblies.
Proposed site work
Supporting surfaces, fixing interfaces, adjoining finishes and seals; site-sized glass remains subject to measurement and the selected system.
Responsible party
Standalone glass, such as partitions and mirrors, is ELS+ installation work where your written contract includes it, with the material through ELS Source. Glazing built into ALUMAX doors, windows and cabinets stays with ALUMAX.
What to look for
Consistent junctions, tidy fittings, smooth operation and appropriate water management.
Checks required
Supporting surfaces checked before fixing and seals checked after; glass sizes confirmed by measurement.

Value engineering

The goal is not to make every renovation cheaper. It is to make every ringgit spent more visible, useful and durable.

We identify where simpler choices can reduce your project cost, explain the trade-offs, and protect the details that matter to everyday use.

Maximum visual impact · Minimum unnecessary cost · Minimum disruption · No compromise on essential performance. Technical safety, waterproofing, structural integrity and regulatory compliance are mandatory gates, not optional points that can be traded against appearance or price.

Spend less on what customers cannot appreciate, spend wisely on what they can see and use, and never save money by hiding technical risks.

Wall tiles: sizes and two coordinated colours

ApplicationSizeVerdict
Bathroom main walls300 × 600 mmDefault
Bathroom feature wall300 × 600 mm in contrasting colourDefault
Shower walls300 × 600 mmGood, with correct waterproofing
Bathroom floor300 × 300 mm or smaller where falls requireSeparate selection
Kitchen backsplash300 × 600 mmDefault value option
Premium kitchen backsplash600 × 1200 mmUpgrade
Premium bathroom walls600 × 1200 mmUpgrade

Keep the same tile size and grout width, with the feature colour restricted to one logical wall or shower zone.

For a more spacious appearance, lay 300 × 600 tiles horizontally with aligned joints. Vertical orientation can work for selected accent walls, but it is not automatically more economical because cutting depends on wall dimensions.

Four colour combinations

  • Ivory + Taupe

    Warm bathrooms

    IvoryTaupe

    Concept colours only; final selection must use physical supplier tile samples.

  • Greige + Concrete

    Modern bathrooms

    GreigeConcrete

    Concept colours only; final selection must use physical supplier tile samples.

  • Cream + Sand

    Kitchen backsplash

    CreamSand

    Concept colours only; final selection must use physical supplier tile samples.

  • Light Grey + Slate

    Contemporary feature

    Light GreySlate

    Concept colours only; final selection must use physical supplier tile samples.

The actual savings still depend on the tile price and installer's rate. We should compare actual quotations before making a universal cost claim.

Default and upgrade

300 × 600 mm is the default for bathroom walls and kitchen backsplashes. 600 × 1200 mm is the upgrade for customers who specifically want fewer grout joints and a more seamless appearance.

The strongest value-engineering opportunity is to use affordable, well-matched tiles with disciplined layout and detailing, rather than expensive tiles with unnecessary patterns.

A renovation you cannot be on site for every day

Who it helps
Owners who are busy or away and want one party responsible for the works in an ELS+ contract.
What ELS decides
Each ELS+ proposal names your contact and sets the reporting frequency and update format. Your proposal defines scope and price, completion, changes, quality and rectification.
What you receive
An ELS+ proposal that defines the works, and updates in the format the proposal sets.
What is not included

Work you appoint separately is outside the ELS+ contract.

No fixed reporting frequency is published; your proposal sets it.

Service and fee
ELS+ — Build & Delivery
Priced after assessment
ELS+ is contracted separately from design.
How ELS helps

ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.

Request a build assessment

Changes and revisions

  • Decisions and documents are approved in writing: a signed sheet, a WhatsApp message or an email.
  • Name one person to confirm decisions: who signs off design decisions, and is anyone else's agreement needed?
  • Approved changes may affect price and timing.

Agreed product configuration and detailing belong to ALUMAX's product scope; wider room design is a separate ELS commission. An ALUMAX enquiry does not need an ELS commission.

How ELS+ is priced

Works price and professional fees — kept apart.

The price of the contracted works is explained separately from any design, assessment or management fee.

01

The contracted works

The works included in the ELS+ contract are quoted as one fixed price for the agreed scope, itemised line by line after the site visit. There is no public per-room figure. Your proposal sets the scope, inclusions and exclusions.

  • Allowances are marked as allowances on the quotation, which states how each one is adjusted.
02

Design, assessment and management fees

Where ELS designs your project, design is charged at the published design fee. Whether an assessment fee applies is confirmed in your written proposal. The fixed price includes ELS's management of the works; no percentage is added on top. The 5% applies to the coordinated value excluding the ELS+ contracted works; ELS+ coordination is priced only inside its own proposal. This 5% belongs to the separate Managed Project Engagement. The contracting party is named in your written proposal. The Managed Project Engagement is taken on by assessment.

03

Visits and travel

ELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job. The best first step is to visit the showroom and book an appointment. For a measure or site visit booked through the showroom, the RM150 fee may be waived, subject to availability. Any further visits, inspections or travel are confirmed in your written proposal.

04

Exclusions and variations

Your proposal sets the exclusions. Changes are approved in writing, with their additional cost and time, before they proceed.

Anything not stated here is confirmed in your written proposal.

Sample documents

Sample — not a completed project

Explore a sample proposal and handover pack.

Open the sample pack

What coordination produces, as labelled specimens: Specimen programme · Specimen decision register · Specimen progress update

Questions

How and when do I pay?

Payment for an ELS package is 60 / 35 / 5 unless your written proposal states a different schedule: 60% on approval to proceed, 35% before works start, and 5% at practical completion.

What about defects and warranties?

Defects and warranties are set in your proposal: defect reporting, the response process and the warranty terms that apply. Defects found at inspection and handover are recorded.

What if the scope or the schedule changes?

Changes are approved in writing, with their additional cost and time, before they proceed. How delays are handled is set in your proposal.

Can ELS+ handle structural work?

Structural alterations need a separate assessment and an engineer. They are subject to that assessment.

Where does ALUMAX fit?

ALUMAX is a product supply and installation partner within the project. ELS tells you when a recommendation involves ALUMAX or another commercial partner.

Request a build assessment

The enquiry form opens with ELS+ already selected. Change it if it is not right.

Your written proposal confirms the site conditions its scope assumes. If measurement or site inspection identifies additional work, we will explain the work, price and programme effect for your approval before proceeding.

What your proposal will confirm
  • Trade scope matrix
  • Identifying and evaluating a suitable OEM, fabricator or specialist for the approved design, starting from ALUMAX’s ready packages where suitable
  • Procurement and logistics coordination
  • Basic quality-control checkpoints
  • Foreman coordination sheets
  • Material schedules
  • Approval checklist
  • QC checklist
  • Variation control
  • Handover documentation
Optional—priced separately
  • ELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job.
  • The best first step is to visit the showroom and book an appointment. For a measure or site visit booked through the showroom, the RM150 fee may be waived, subject to availability.
You need to arrange
  • ALUMAX products, either within the ELS+ contract or contracted directly by you; your proposal states which; Specialist scopes — waterproofing, façade, drainage, ventilation — quoted per project.
  • Works outside the contract you sign. Your proposal names each trade and what it supplies; anything it does not list is not part of the price, so ask ELS+ to add it to the proposal or arrange it yourself before work begins.
To confirm before order
Any measurement, access, compatibility or technical point not yet settled. It is shown as open in your written proposal when it applies.

Compare the packages Compare the packages side by side Repairs & Restoration: targeted repairs, quoted per task See a sample document pack