Kuching · ShophouseSample record

Flood-resilient wet kitchen

The problem — Ground-floor flood exposure, solved with Full aluminium + honeycomb and documented at every stage.

Value band
RM40k–RM55k
Timeline
9 weeks
Materials
Full aluminium + honeycomb
QC
Pending

Sample record — the 13-stage structure a completed ELS project carries. Photography, the QC checklist, the client quote and the after-sales log are added once verified; nothing on this page is presented as real until it is.

Documented at 13 stages
  1. 01

    Before

    Pending

    5–10 photos

    The room exactly as we found it — the honest starting point.

    5–10 photos · Pending
  2. 02

    Measurement

    Pending

    Measurement sheet

    Every dimension taken on site, not assumed.

    Pending
  3. 03

    Design

    Pending

    Render

    The agreed look, before a single panel is cut.

    Pending
  4. 04

    Technical

    Pending

    Approved drawing

    The signed-off drawing production works to.

    Pending
  5. 05

    Material

    Pending

    Material schedule

    Exactly what goes in — grade, finish and quantity.

    Pending
  6. 06

    Production

    Pending

    2–5 fabrication photos

    The panels being built to the approved drawing.

    2–5 photos · Pending
  7. 07

    Installation

    Pending

    5–10 installation photos

    The fit-out on site, step by step.

    5–10 photos · Pending
  8. 08

    QC

    Pending

    Checklist

    The signed quality checklist — snags and all.

    Signed QC checklist · Pending

  9. 09

    Finished

    Pending

    Professional photography

    The completed room, properly shot.

    Pending
  10. 10

    Client

    Pending

    Short quote / testimonial

    The client's own words, verified before use.

    Verified quote · Pending

  11. 11

    Commercial

    Value band

    An honest range, never a fabricated exact figure.

    RM40k–RM55k

  12. 12

    Timeline

    Actual weeks

    How long it really took, start to handover.

    9 weeks

  13. 13

    After-sales

    Pending

    Any snag + resolution

    What came back, and how we closed it.

    No snags logged after handover · Pending

Client

Verified client quote — added once the project is documented and the client has approved it for use.

Planning something similar?

Start with a free Pre-Check — we'll map the risk and the right scope.

Start Pre-Check