Site readiness,before ALUMAX cuts a board.
Cabinets, wardrobes, doors and windows are fabricated to the site as it is on measurement day — not as you hope it will be. ELS by ALUMAX confirms the site is actually ready before fabrication starts: walls and plaster done, points set, floor level and finished, wet areas cured, access and power in place. Get this true first, and install goes in clean — no on-site cutting, no variations, no rework.
Homeowners and renovators booking an ALUMAX install, who want the site checked against the fabrication scope before the order is locked.
Ready, or not ready — and what happens next
ELS calls site-readiness against the fabrication scope. The honest answer protects your money, not the schedule.
| If | Then |
|---|---|
| Walls, plaster and floor finish are complete and dimensions stable | Final measurement is taken and the fabrication order can be confirmed. |
| Electrical or plumbing points aren't set and confirmed yet | We hold fabrication and mark points first — moving a hob or sink after install means cutting finished cabinetry. |
| Wet-area waterproofing is laid but not yet cured | We wait out the cure before tiling and cabinet base install — drilling green membrane voids the protection. |
| Floor isn't level or the finished floor isn't down | We set datum and sequence flooring vs cabinet first, so toe-kicks and door gaps land right. |
| Site has no safe access, clear path or working power | We schedule a delivery and install window once access and power are confirmed. |
| You're unsure whether the site is ready | Start the free Pre-Check — it maps what's true on site against the install scope. |
Readiness is what kills rework and variations
ALUMAX fabricates to confirmed dimensions and points. When the site changes after the order, the cost lands on you — as on-site cutting, refits or a re-order.
What site-readiness coordination covers
ELS confirms and documents readiness, then takes the final measurement that locks the ALUMAX order. We coordinate the conditions — we don't carry out the building trades ourselves.
- Pre-install site visit against the fabrication scope
- Readiness checklist: walls, plaster, floor, points, wet areas, access, power
- Final measurement that confirms the ALUMAX order
- M&E point check — hob, sink, hood, sockets, water points marked vs layout
- Wet-area waterproofing cure confirmation before base install
- Trade sequencing note so the right trade goes first
- Go / no-go readiness sign-off, written and dated
- Hand-off to ALUMAX for fabrication and install scheduling
- Carrying out the wall, plaster, tiling or flooring trades
- Applying or repairing waterproofing membrane
- Electrical or plumbing first-fix wiring and piping works
- The ALUMAX product, fabrication and installation itself
- Supplying tools, scaffolding or site power
- Structural, drainage or façade remediation (ELS project-basis, separately scoped)
What drives the price
Site-readiness coordination is quoted on a project basis — the visit and document load depend on how much site there is to check and how many trades touch it.
Indicative only — the final quotation follows site measurement, material selection and approved scope. Prices exclude SST.
The site-readiness checklist
Have these true before final measurement, and the ALUMAX order can be locked with confidence. If any are open, ELS holds fabrication until they're closed.
- Walls built, plastered and dry — no further skim or render planned in the install area.
- Final dimensions stable — wall thickness and openings won't change after measurement.
- Electrical points set and confirmed — sockets, switches, hood and appliance feeds marked against the layout.
- Plumbing points set and confirmed — sink, hob gas, water in/out and floor traps in final position.
- Floor level checked and the finished-floor decision sequenced against cabinetry.
- Wet-area waterproofing laid and fully cured before any base unit install.
- Ceiling, tiling and other overhead trades done — so finished units aren't worked over.
- Safe access, a clear delivery path and working power on the install day.
Based in Sibu — across Sarawak by appointment.
Common questions
What does 'site ready' actually mean before an ALUMAX install?
It means the conditions ALUMAX fabricates to are final and won't move: walls built and plastered, dimensions stable, electrical and plumbing points set and confirmed, floor level with the finished-floor decision sequenced, wet-area waterproofing fully cured, and safe access with working power on install day. ELS by ALUMAX checks each of these against the fabrication scope before the order is locked — because cabinets are cut to the site as measured, not as hoped.
Why does the site have to be ready before fabrication, not during install?
Because ALUMAX cuts boards to confirmed dimensions and cut-outs to confirmed points. Once a unit is fabricated, changing the site means cutting finished cabinetry on the spot, refitting, or re-ordering a part — all of which cost you money and time. Getting the site true first is what keeps install clean and keeps your quotation from drifting into variations.
Does ELS do the building works to get the site ready?
No. ELS coordinates and confirms readiness — we check, document and sign off, then take the final measurement that locks the ALUMAX order. The wall, plaster, tiling, flooring, waterproofing, electrical and plumbing trades are carried out by your contractor or appointed specialists. ELS holds them to one approved scope and the right sequence; we don't replace them.
What if the site isn't ready on the day you visit?
We give you an honest no-go with a short list of exactly what's open — a point not yet set, waterproofing still curing, a floor not yet level — and we hold fabrication until those are closed. That's the whole point: a no-go before fabrication costs a revisit; a yes given too early costs cut cabinetry. We'd rather protect your order than protect the schedule.
How long should waterproofing cure before cabinets go in?
Follow the membrane manufacturer's cure time for your system — it varies by product and by Sarawak humidity, and ELS confirms it on site rather than guessing. The principle holds regardless: drilling fixings or tiling over green, uncured waterproofing breaks the membrane, and in our climate the leak shows up months later behind the cabinet, where it's slowest and costliest to fix. We wait the cure out before any base unit install.
I'm self-managing my contractor — can ELS still check readiness?
Yes. ELS can run the readiness check against the ALUMAX install scope even when your own contractor is doing the building works. We mark up what's set and what's open, give your contractor a clear sequencing note, and only take the final measurement once the site is true. That keeps the boundary between your trades and the ALUMAX install clean — and keeps responsibility for any gap in writing.
How is site-readiness coordination priced?
On a project basis, because the check depends on how much site there is and how many trades and wet zones touch it. The site measurement itself is from RM300 in Sibu and from RM500 outstation (excluding SST), creditable against your engagement on confirmation. If you're not sure whether your site needs this layer yet, start with the free Renovation Pre-Check — it maps what's true on site against your install scope.
Does ELS supply the SPC flooring or do the floor works?
SPC flooring is an ALUMAX-direct product, so the supply and lay sit with ALUMAX. ELS coordinates the readiness around it — confirming the floor is level and sequencing the finished-floor decision against the cabinetry so toe-kicks and door gaps land right. Broader flooring systems, screeding or levelling works are multi-trade and would be scoped separately on a project basis.
Related ELS services
Every path starts the same way — the free Pre-Check tells you which one your project needs.
Renovation Coordination, Sibu
One approved scope, sequenced trades and QC — the seams held together.
OpenFull House Renovation, Sibu
Whole-home renovation planned, specified and coordinated to one approved scope.
OpenCabinet · Ceiling · Lighting Coordination
The seam where cabinets, ceiling, lighting, electrical and A/C meet — clash-free.
OpenNot sure which you need? Start with the free Renovation Pre-Check — two minutes, and your next step is clear.