Add-ons · ELS

Add depth where you need it.

Around the ELS Studio and ELS+ packages, ELS offers focused add-ons — renders, lighting, special design, procurement and coordination — each scoped to the job. Take only what your project needs.

One engagement

Managed Project Engagement

Runs the services you commission, coordinated together, by assessment. Product and trade costs are quoted separately. The 5% covers coordination only; design fees are charged separately.

Covered by the 5%
  • Checking materials against the approved specification
  • A recommended trade sequence, QC hold-points and a recorded handover
Charged separately
  • Design direction and room-by-room specification
  • Site-scale-matched renders
  • Premium lighting planning
  • Special design intents where the home needs them
Price

5% of the approved coordinated project value, minimum RM500.

Coordinated project value counts the ALUMAX and appointed-trade scopes in the approved coordination matrix — not ELS fees, SST, loose furnishing, authority fees or unappointed work.

The 5% applies to the coordinated value excluding the ELS+ contracted works; ELS+ coordination is priced only inside its own proposal.

The contracting party is named in your written proposal. The Managed Project Engagement is taken on by assessment.

Enquire — Managed Project Engagement
Why 5% with a minimum

How the fee is set.

Proportional

You pay 5% of the coordinated project value — so a smaller scope is not charged a heavy flat fee.

A minimum

The fee never falls below RM500.

Or build your own

Prefer to take only part of it? Each add-on below is scoped on its own.

Each add-on is quoted per project by scope, complexity and site condition.

Visualisation

See it before you commit — then verify it

Two levels of render: one to agree the direction, one built to your measured site, so the design intent you approve can be compared with what is built.

Concept renders

Agree the look and shortlist a direction.

  • Style-direction visuals for each key space
  • Palette, material and finish mood
  • Enough to choose a direction with confidence
Within a Style Adaptation engagementStyle Adaptation is RM800 per room; concept renders are part of that scope.for one room · Four rooms RM2,800. Each room beyond the fourth is RM800.
Site-scale

Site-scale-matched renders

Built to your measured dimensions — a checkable reference, not a mood board.

  • Renders matched to measured site dimensions
  • Real scale — cabinetry, clearances and sightlines true
  • Material, finish and lighting shown at the measured scale
  • The image becomes a design-intent reference; the approved drawings and specification govern what is built.
Scoped per projectRequires a site measurement. ELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job.
Lighting

Lighting specialist add-on

Lighting designed as its own layer, not left to the electrician on site.

Premium lighting planning

Layered light that makes the finishes read the way they were designed.

  • Layered ambient, task and accent lighting
  • Fixture selection; CCT and CRI strategy
  • Lux targets, switching and scenes
  • Driver access and cabinet-lighting integration
Quoted per project
Special design

Special design intents

Dedicated concepts for high-impact spaces a standard product adaptation can't solve.

Special design intents add-on

Bespoke concept and technical development for feature spaces.

  • Dedicated design intent for the feature space
  • Technical development beyond standard product adaptation
  • Coordinated with the material, lighting and cabinet spec
Procurement

Procurement support

ELS guides and specifies your selections. ALUMAX handles product sourcing and quotations. Supply, installation and warranty responsibilities are stated in your quotation. If a specified item is imported, freight, duty, SST, compatibility, certification, warranty, replacement and local after-sales support are confirmed in the quotation before you commit.

Local materials

Coordinate locally-supplied materials to the spec.

  • Matching materials to the approved specification
  • Lead-time and delivery coordination
Quoted per project
Coordination

Coordination support

ELS recommends the order of the work and checks the hand-offs set in the commissioned scope. The coordination model changes with where the materials come from.

Local materials · local labour

Local trades, with a recommended sequence to one scope.

  • Coordinate local trades to one approved scope
  • A recommended trade sequence and coordination sheets
  • QC hold-points and variation control
Quoted per project

Imported materials · local labour

Local crews installing imported materials — timed around the shipment.

  • Everything in the local model, plus:
  • Extra hold-points at delivery and incoming inspection
  • Matching imported materials to local install methods
Quoted per project

Imported materials · specialist labour

Imported materials installed by specialist crews.

  • Everything in the imported-materials model, plus:
  • Tightest hold-points and a recorded handover
Quoted per project
On pricing

The Managed Project Engagement is 5% of the approved coordinated project value, minimum RM500. The individual add-ons are scoped per job — no fixed list price. Firm published fees elsewhere: Style Adaptation at RM800 per room and Design & Specification at RM5 per sq ft or 5% of job value, whichever is higher; minimum RM1,500. ELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job. The best first step is to visit the showroom and book an appointment. For a measure or site visit booked through the showroom, the RM150 fee may be waived, subject to availability.

The Style Adaptation fee is RM800 for one room. Four rooms RM2,800. Each room beyond the fourth is RM800. Design fee only; products and renovation are quoted separately.

Not sure which add-ons fit?

Start with a free Renovation Pre-Check — it clarifies your scope, then we recommend only the add-ons your project actually needs.

See how we work: stages, sign-offs and change rules

ELS package terms

An ELS quotation is valid for 14 days from its date unless stated otherwise. Payment for an ELS package is 60 / 35 / 5 unless your written proposal states a different schedule: 60% on approval to proceed, 35% before works start, and 5% at practical completion. ELS design-only jobs use the same 60/35/5 schedule. ELS workmanship cover is 12 months from handover sign-off, for works ELS is contracted to deliver. Manufacturer component periods follow their source documents. ALUMAX products follow ALUMAX's own quotation and terms. Trades you appoint directly follow their own terms.