BETAWe're refining the site during beta testing.Until Share feedback
Sibu · Sarawak

Renovation design, made clear in Sibu.

ELS is a renovation design and coordination studio in Sibu, Sarawak. We turn an uncertain renovation into approved drawings, material decisions and a coordination plan every trade can build from — clarity before execution.

Start Pre-CheckSee how ELS works
What a design studio does

Decided on paper, before it's built.

Three things a renovation in Sibu needs settled before any quote or any wall moves — and what ELS hands you for each.

Design directionLayouts, flow and a material palette resolved on paper — so a Sibu home is decided before it is built, not during.
SpecificationCabinet sheets, electrical and lighting plans, and moisture-zone material calls written for Sarawak's heat and humidity.
CoordinationOne approved scope every trade quotes against — so foremen in Sibu price the same work, and the seams between them don't fail.
Built for Sibu conditions

The risks that are specific to homes here.

Humidity, monsoon rain, heat and terrace-house layouts create risks that are easy to miss. These are the ones ELS checks first.

Humidity & wet areasRisk: In the wet zone, Sibu's humidity and heavy use swell particleboard cabinets — a dry-zone board in the wrong place, which can fail.Confirm: Aluminium base cabinets, hood ducting, drainage, ventilation.
Monsoon & waterproofingRisk: Monsoon rain and high water tables turn a small waterproofing failure into damage that spreads between rooms.Confirm: Waterproofing membrane, floor-trap falls, wet/dry separation.
Terrace-house ventilationRisk: Long, narrow terrace and shophouse layouts trap heat and damp in the middle — rooms without cross-flow grow mould.Confirm: Airwell strategy, exhaust paths, window placement, material zoning.
Sun-facing roomsRisk: Afternoon sun through large windows fades finishes, warps cabinetry and pushes up the cooling load.Confirm: Glass selection, orientation, shading, heat-stable materials.

These risks shift with the building itself — a terrace, an apartment, an old timber home or a flood-prone lot each need different checks. See renovation planning by property type.

Where ELS works

Based in Sibu — elsewhere in Sarawak by quotation.

Sibu as standard. Elsewhere in Sarawak by quotation, subject to schedule and capacity.

SibuKuchingBintuluMiriMukahKapit
Renovation design in Sibu

Common questions

Does ELS work in Sibu?

Yes. ELS is a design and coordination studio based in Sibu, Sarawak: Sibu as standard, and elsewhere in Sarawak — Kuching, Bintulu, Miri, Mukah and Kapit — by quotation, subject to schedule and capacity.

What does a renovation design studio in Sibu actually do?

ELS plans your layout, specifies materials and fittings, and coordinates the trades to one approved scope — before any building starts. ELS Design & Specification provides the agreed design deliverables. ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.

How much does renovation design cost in Sibu?

ELS design and coordination starts from RM800 (excl. SST), depending on scope. It covers paid consultation, measurement and design support. A final construction cost can only be confirmed after site measurement.

Do I still need a contractor if I use ELS?

With Style Adaptation or Design & Specification, yes: you or your contractor build to the approved drawings, specifications and trade matrix, and ELS checks the hand-offs set in the commissioned scope, so everyone works to the same scope and the quotations stay comparable. Clients using independently appointed contractors must nominate a main contractor responsible for site management and trade coordination. ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.

Why does design matter for Sibu homes specifically?

Sibu's humidity, monsoon rain, heat and terrace/shophouse layouts create risks that are easy to miss — swelling cabinets, waterproofing failures, trapped damp and sun-warped finishes. Resolving material, ventilation and waterproofing decisions on paper first helps identify the assumptions that could cause costly rework here.

Do you work in both English and Chinese?

Yes. ELS works in both English and Chinese (Mandarin), and all documents can be prepared bilingually so every decision is clear to you and to the trades.

Prepared by George Wong — Founder, ELSFormer senior research engineer, Fortune 500 · Based in Sibu, Sarawak
Keep planning with ELS

Related ELS services

Every path starts the same way — the free Pre-Check tells you which one your project needs.

Not sure which you need? Start with the free Pre-Check: about two minutes, and it suggests which service to ask about.

Start Pre-Check
Who is responsible for what
PartyResponsibility
ALUMAXALUMAX supplies and installs its defined product families when they suit the specification — it specifies products, works with selected manufacturing partners, reviews available production quality records and checks supplied products against the confirmed order, and manages delivery, installation and product warranty.
ELSDesign, specification and coordination across multiple products/trades.
Appointed tradesElectrical, plumbing, tiling, ceiling, waterproofing and specialist works. Independent specialist works are not included within ALUMAX's scope unless a separate contracting arrangement has been expressly established and approved for that category of work.
Start in Sibu

Plan your renovation with clarity — before anyone quotes a price.