BETAWe're refining the site during beta testing.Until Share feedback
Service 03 · ELS

Renovation Coordination

For multi-trade renovation projects — several trades, wet areas and site constraints, with each trade's information coordinated to one approved scope.

Project basisReviewed 2026-09-18

Just need the product? ALUMAX can quote it directly — no ELS fee. Get an ALUMAX quotation

The problem it solves — Trades working from different information clash, redo work and blow the timeline, with no single approved scope or QC.

What you receive

  • Trade scope matrix
  • Identifying and evaluating the appropriate OEM, fabricator or specialist for the approved design
  • Procurement and logistics coordination
  • A recommended sequence for your specialist trades, to your specification
  • Basic quality-control checkpoints
  • Foreman coordination sheets
  • Material schedules
  • Approval checklist
  • QC checklist
  • Variation control
  • Handover documentation

The detail

Required inputs
Site measurement, an approved specification and the confirmed product order.
Expected duration
Runs with the build programme — scoped per project.
Response times
ELS's service targets: Site Observation Report issued within 36 hours of each milestone visit; a standard technical query (RFI) answered within 5 working days.
Decision stages
Scope → approve → coordinate → inspect & handover.
You approve
Scope, materials, drawings, price and timeline before work proceeds.
Revisions
After sign-off, the first 2 major changes are included; further major changes are charged per the approved offer terms.
Not included
Product supply and installation, which is ALUMAX's scope; Specialist scopes — waterproofing, façade, drainage, ventilation — quoted per project; Daily supervision & labour dispatch.
Who executes
You contract every trade; ELS contracts none of them. ELS recommends the sequence, identifies the dependencies between trades and flags readiness at the quality checkpoints; it does not direct labour or control the contractors' programme, and the trades' own workmanship stays with whoever you appointed. ALUMAX remains responsible for its own products and their installation. THE COORDINATION FEE IS NOT THE COST OF THE RENOVATION: the trades and the products are quoted and paid separately.
Fee basis & payment
Quoted per project against the agreed scope and programme, payable in stages set in that quotation.

Who is responsible for what

Who designsELS, the overall design; ALUMAX, product configuration and detailing for what it supplies
Who suppliesALUMAX, for its own products; other specified suppliers, for theirs
Who installsALUMAX, for its own products; every other trade is appointed by you
Who carries each warrantyALUMAX, on its own products; each trade you appoint, on its own workmanship

ELS produces the specification; it does not build. ALUMAX supplies and installs its own products under its own warranty, and every other trade — electrical, plumbing, tiling, ceiling, waterproofing — is contracted directly by you, to this specification.

How coordination is priced

Project basis — but the basis is clear.

Coordination is quoted per project because scope, trades and site conditions vary — but the fee is built from a clear basis, so you always know how the number is formed.

01

Fee basis

A fixed-scope fee for a defined scope or a percentage of the coordinated works for larger multi-trade projects — whichever fits the size and length of the job.

02

Site inspections

A defined number of scheduled site inspections is included, set in the approved scope against the build programme.

03

Additional visits

Visits beyond the included inspections are charged at a per-visit rate, agreed up front.

04

Outstation travel

Work outside Sibu carries a per-trip travel charge (for reference, the ELS technical site survey is from RM500 outstation versus RM300 in Sibu).

The applicable basis, the number of included inspections and the rates are set in your quotation after site measurement and an approved scope. All fees exclude SST.

What happens next

Start the Pre-Check to map the trades and scope, then we quote by project.

Not included
Product supply and installation, which is ALUMAX's scope; Specialist scopes — waterproofing, façade, drainage, ventilation — quoted per project; Daily supervision & labour dispatch.
Who executes
You contract every trade; ELS contracts none of them. ELS recommends the sequence, identifies the dependencies between trades and flags readiness at the quality checkpoints; it does not direct labour or control the contractors' programme, and the trades' own workmanship stays with whoever you appointed. ALUMAX remains responsible for its own products and their installation. THE COORDINATION FEE IS NOT THE COST OF THE RENOVATION: the trades and the products are quoted and paid separately.
Fee basis & payment
Quoted per project against the agreed scope and programme, payable in stages set in that quotation.
ELS technical site survey
From RM300 in Sibu (RM500 outstation) excl. SST. Credited in full against a qualifying confirmation within 60 days — conditions apply.

Compare all three services Compare the services side by side