Renovation Coordination

For multi-trade renovation projects — several trades, wet areas, sequencing and site constraints held to one approved scope.

Project basis

The problem it solves — Trades working from different information clash, redo work and blow the timeline, with no single approved scope or QC.

What you receive

  • Trade scope matrix
  • Foreman coordination sheets
  • Material schedules
  • Approval checklist
  • QC checklist
  • Variation control
  • Handover documentation

The detail

Required inputs
Site measurement, an approved specification and the confirmed product order.
Expected duration
Runs with the build programme — scoped per project.
Decision stages
Scope → approve → coordinate → inspect & handover.
You approve
Scope, materials, drawings, price and timeline before work proceeds.
Revisions
Per the approved offer terms; variations after approval are logged and controlled.
Not included
Product supply & installation (ALUMAX); specialist scopes — waterproofing, façade, drainage, ventilation — quoted per project.
How coordination is priced

Project basis — but the basis is clear.

Coordination is quoted per project because scope, trades and site conditions vary — but the fee is built from a clear basis, so you always know how the number is formed.

01

Fee basis — one of three

A fixed-scope fee for a defined scope, a percentage of the coordinated works for larger multi-trade projects, or a monthly retainer for longer programmes — whichever fits the size and length of the job.

02

Site inspections

A defined number of scheduled site inspections is included, set in the approved scope against the build programme.

03

Additional visits

Visits beyond the included inspections are charged at a per-visit rate, agreed up front.

04

Outstation travel

Work outside Sibu carries a per-trip travel charge (for reference, site measurement is from RM500 outstation versus RM300 in Sibu).

The applicable basis, the number of included inspections and the rates are set in your quotation after site measurement and an approved scope. All fees exclude SST.

What happens next

Start the Pre-Check to map the trades and scope, then we quote by project.