Fee basis — one of three
A fixed-scope fee for a defined scope, a percentage of the coordinated works for larger multi-trade projects, or a monthly retainer for longer programmes — whichever fits the size and length of the job.
For multi-trade renovation projects — several trades, wet areas, sequencing and site constraints held to one approved scope.
The problem it solves — Trades working from different information clash, redo work and blow the timeline, with no single approved scope or QC.
Coordination is quoted per project because scope, trades and site conditions vary — but the fee is built from a clear basis, so you always know how the number is formed.
A fixed-scope fee for a defined scope, a percentage of the coordinated works for larger multi-trade projects, or a monthly retainer for longer programmes — whichever fits the size and length of the job.
A defined number of scheduled site inspections is included, set in the approved scope against the build programme.
Visits beyond the included inspections are charged at a per-visit rate, agreed up front.
Work outside Sibu carries a per-trip travel charge (for reference, site measurement is from RM500 outstation versus RM300 in Sibu).
The applicable basis, the number of included inspections and the rates are set in your quotation after site measurement and an approved scope. All fees exclude SST.
Start the Pre-Check to map the trades and scope, then we quote by project.