BETAWe're refining the site during beta testing.Until Share feedback
Illustrative scenario Concept studyShophouse Kitchen + Wet AreaKuching, Sarawak Design scope: Design studyDelivery: No delivery by ELS+

Kuching Shophouse: Flood-Resilient Kitchen

Scope

Marine-grade stainless + elevated, flood-ready build

The Challenge

A typical ground-floor, flood-prone shophouse situation: a kitchen where a seasonal flood can destroy appliances and finishes, and the owner wants one designed to survive water of roughly 1.2m with minimal loss.

The Approach

The proposal raises all electrical to 1.5m height and sets marine-grade 316 stainless steel cabinetry on a reinforced concrete plinth (0.5m height). It specifies polished concrete flooring with an epoxy sealant, and mounts every appliance on an adjustable pedestal that can be removed before flooding.

Proposed resolution

Designed so a flood can become a clean-up rather than a rebuild: the electrics sit above the expected water line, the marine-grade stainless carcass and sealed concrete floor are specified to tolerate floodwater, and appliances lift off their pedestals to be moved out ahead of rising water — so recovery would be drying out rather than replacing the kitchen.

Key Lessons

  • →Marine-grade stainless costs more up front, but in a flood zone it is the part designed to outlast the water
  • →Elevated electrical design should be planned in from the start — not treated as cosmetic
  • →Removable appliances on pedestals reduce flood losses
  • →Polished concrete + epoxy suits wet areas where it is detailed and sealed correctly
Prepared by George Wong — Founder, ELSFormer senior research engineer, Fortune 500 · Based in Sibu, Sarawak

*Illustrative scenario based on conditions ELS plans for across Sarawak — figures are indicative and not a quotation. We are actively building our project portfolio; named, photographed case studies will follow.

Design studies

Your project

Ready to start planning yours?

Design intent — subject to feasibility and site measurement; any variation is agreed with you before work continues.