Illustrative scenario2-Level Terrace RenovationSibu, Sarawak

Sibu Terrace: Humidity Control Retrofit

Scope

Multi-zone ventilation + AC dehumidification + E0 materials

Timeline

3 weeks design + 2 weeks installation

The Challenge

A common Sibu complaint: black mould returning on the ceiling within months of a renovation, windows that condensate for much of the year, and stagnant air in the kitchen and bathrooms.

The Approach

Designed multi-zone ventilation with extraction fans in all wet areas. Upgraded AC with dedicated dehumidification. Specified E0 MDF and marine-grade finishes. Installed recessed ventilation ducts to avoid visual clutter.

The Outcome

Designed so the conditions that breed mould — trapped humid air and cold, condensing surfaces — are removed at the planning stage: extraction in every wet area, dehumidifying AC zoning and moisture-safe materials, rather than repainting over recurring mould later.

Key Lessons

  • Ventilation is non-negotiable in Sarawak — not an optional upgrade
  • Zone-based AC costs slightly more but saves energy long-term
  • Material grade matters: E0 over standard MDF is designed to resist recurrence
  • Monthly maintenance (coil cleaning) is essential, not optional
Prepared by George Wong — Founder, ELS by ALUMAXFormer senior research engineer, Fortune 500 · Based in Sibu, Sarawak · Last updated: July 2026

*Illustrative scenario based on conditions ELS by ALUMAX plans for across Sarawak — figures are indicative and not a quotation. We are actively building our project portfolio; named, photographed case studies will follow.