BETAWe're refining the site during beta testing.Until Share feedback
Design options LIV-08 — Whole home

Floor finish

Look at the options, then save the one you prefer to ELS Design Brief.

Purpose: Design options

Design intent — subject to feasibility and site measurement; any variation is agreed with you before work continues.

LIV-08

Floor finish

Whole home
Floor finish — SPC (stone-plastic composite)
SPC (stone-plastic composite)
Best for
Rooms that need timber's look with real moisture tolerance.
Watch out
The wear layer is thin: deep scratches cannot be sanded out, only replaced. A poorly levelled slab telegraphs through.
Relative cost
Lower than tile or timber once laid.
Consequential work
Needs a level, dry slab; screeding and moisture readings belong in the programme before delivery.
Floor finish — Porcelain tile
Porcelain tile
Best for
Wet and high-traffic areas.
Watch out
Hard and cold underfoot, and grout is the maintenance line — colour choice matters more than most clients expect.
Relative cost
Varies widely by format; large formats cost more to lay than to buy.
Consequential work
Sets floor level and threshold details against adjoining rooms; falls and drainage must be resolved first.
Floor finish — Engineered timber
Engineered timber
Best for
Bedrooms and upper floors where warmth matters and water exposure is genuinely low.
Watch out
Real timber moves with humidity; in an unconditioned Sarawak room expect movement at the joints. Not for a ground floor with flood risk.
Relative cost
The highest of the three, and the most sensitive to species.
Consequential work
Requires acclimatisation time on site and a decided expansion gap at every perimeter and threshold.
Cost lines are relative and typical for the illustrated specification. Relative cost names the direct cost drivers, consequential work names what else changes, and watch out names the checks required. Exceptions and site conditions can change any of them. A relative direction, not an amount. Nothing here is a price; the figure belongs to whoever supplies the item and is set after measurement.

Supply and installation confirmed with your specification.

Plan with ELS

Concept renders — a design render, not a photo. Shown as design options for one decision.

More design options for this room

Whole home — 4 more