BETAWe're refining the site during beta testing.Until Share feedback
Room Decision System

Every set of design options, side by side.

The whole browsable set, filterable by room.

Design options

61 sets of design options — 36 with named options · 25 visual referencesThese are concept design options — looking at one chooses nothing and prices nothing. Quoting one needs your choice, the room it is for, and an ELS check against the specification.Cost lines are relative and typical for the illustrated specification. Relative cost names the direct cost drivers, consequential work names what else changes, and watch out names the checks required. Exceptions and site conditions can change any of them. A relative direction, not an amount. Nothing here is a price; the figure belongs to whoever supplies the item and is set after measurement.

Design intent — subject to feasibility and site measurement; any variation is agreed with you before work continues.

Concept renders — a design render, not a photo. Shown as design options for one decision.

Supply and installation confirmed with your specification. How this is priced is confirmed after measurement, by whoever supplies it.

Air-conditioning — Wall split unit
Wall split unit
Air-conditioning — Ceiling cassette
Ceiling cassette
Air-conditioning — Concealed ducted / zoned
Concealed ducted / zoned
Show the trade-offs

Wall split unit

Best for
The pragmatic default — simplest to install, service and replace.
Watch out
The wall unit is visible and dictates where furniture can sit; it dates the room faster than the joinery.
Cost and scope2
Relative cost
The least expensive of the three.
Consequential work
Fixes wall position, drainage fall and the pipe route to the condenser — decide before the wall finish.

Ceiling cassette

Best for
Even distribution across a square room from a single central point.
Watch out
Needs real ceiling void; it commits the ceiling design and is disruptive to retrofit.
Cost and scope2
Relative cost
Higher than a split.
Consequential work
Ceiling height, void depth and drainage fall must be settled before the ceiling is closed.

Concealed ducted / zoned

Best for
Concealing the system entirely across several rooms from one plant location.
Watch out
The most demanding of the three: duct routing, void depth and return-air paths all have to work, and service access must be planned.
Cost and scope2
Relative cost
The highest.
Consequential work
Drives the ceiling design across multiple rooms and must be coordinated with lighting and any structural downstand.

Also part of this decision, not pictured: Fans only / no AC

Floor finish — SPC (stone-plastic composite)
SPC (stone-plastic composite)
Floor finish — Porcelain tile
Porcelain tile
Floor finish — Engineered timber
Engineered timber
Show the trade-offs

SPC (stone-plastic composite)

Best for
Rooms that need timber's look with real moisture tolerance.
Watch out
The wear layer is thin: deep scratches cannot be sanded out, only replaced. A poorly levelled slab telegraphs through.
Cost and scope2
Relative cost
Lower than tile or timber once laid.
Consequential work
Needs a level, dry slab; screeding and moisture readings belong in the programme before delivery.

Porcelain tile

Best for
Wet and high-traffic areas.
Watch out
Hard and cold underfoot, and grout is the maintenance line — colour choice matters more than most clients expect.
Cost and scope2
Relative cost
Varies widely by format; large formats cost more to lay than to buy.
Consequential work
Sets floor level and threshold details against adjoining rooms; falls and drainage must be resolved first.

Engineered timber

Best for
Bedrooms and upper floors where warmth matters and water exposure is genuinely low.
Watch out
Real timber moves with humidity; in an unconditioned Sarawak room expect movement at the joints. Not for a ground floor with flood risk.
Cost and scope2
Relative cost
The highest of the three, and the most sensitive to species.
Consequential work
Requires acclimatisation time on site and a decided expansion gap at every perimeter and threshold.

Shown on a bare wall rather than a styled feature wall, so the sheen is what you compare.

Paint system & sheen — Acrylic matte
Acrylic matte
Paint system & sheen — Washable eggshell
Washable eggshell
Paint system & sheen — Satin acrylic
Satin acrylic
Paint system & sheen — Semi-gloss enamel
Semi-gloss enamel
Paint system & sheen — Mineral limewash
Mineral limewash
Show the trade-offs

Acrylic matte

Best for
Walls where a flat, non-reflective surface hides minor unevenness.
Watch out
The least scrubbable — marks in a circulation zone will show and touch-up flashes.
Cost and scope2
Relative cost
The reference point.
Consequential work
Best kept away from wet areas and high-touch surfaces.

Washable eggshell

Best for
The pragmatic middle for family rooms — cleanable without a shine.
Watch out
Not fully scrubbable despite the name; check the manufacturer's actual claim.
Cost and scope2
Relative cost
Moderate.
Consequential work
Confirm the cleaning expectation with the client so the finish is not blamed later.

Satin acrylic

Best for
A durable, wipeable general-purpose finish for busy rooms.
Watch out
The sheen shows wall unevenness that a matte finish would hide.
Cost and scope2
Relative cost
Moderate.
Consequential work
Substrate preparation matters more than with a matte finish.

Semi-gloss enamel

Best for
Trim, doors and anywhere that takes hands and cleaning.
Watch out
Unforgiving of surface defects and brush marks; the higher the sheen, the more it shows.
Cost and scope2
Relative cost
Higher.
Consequential work
Preparation standard must be agreed — this finish exposes it.

Mineral limewash

Best for
A soft, breathable finish with visible depth and movement.
Watch out
It is a texture, not just a colour — application skill decides the result, and touch-up is difficult.
Cost and scope2
Relative cost
Higher, and the cost is in application.
Consequential work
Requires a competent applicator and a sample panel signed off before the room is done.
Visible acoustic treatment — Fabric panels
Fabric panels
Visible acoustic treatment — PET felt
PET felt
Show the trade-offs

Fabric panels

Best for
The most absorption per area — rooms with a real echo problem.
Watch out
Fabric collects dust and, in a humid room, needs to be a material that tolerates it.
Cost and scope2
Relative cost
Moderate.
Consequential work
Panel positions should follow the reflection points, not just the composition.

PET felt

Best for
A durable, wipeable absorber that can also be a graphic element.
Watch out
Absorbs a narrower range than fabric over a cavity — good for speech, less for low frequencies.
Cost and scope2
Relative cost
Moderate.
Consequential work
Fixing and joint detail are visible; they need drawing.

One option isn't shown yet — coming soon.

Retain / repair / replace — Repair
Repair
Retain / repair / replace — Upgrade
Upgrade
Show the trade-offs

Repair

Best for
Sound construction with surface damage — the fault is cosmetic, not structural.
Watch out
Repair reveals its own scope once opened; budget for a finding, not just the visible fault.
Cost and scope2
Relative cost
Lower than replacement, but less predictable.
Consequential work
Needs a hold point after opening up, so the decision can change on evidence.

Upgrade

Best for
Improving something that works — better performance without full replacement.
Watch out
The temptation is to upgrade what is visible rather than what fails; check the reasoning.
Cost and scope2
Relative cost
Between repair and replace.
Consequential work
Confirm the upgrade is compatible with what is retained around it.

2 options aren't shown yet — coming soon.