The Specialist Handoff Register.

ALUMAX selects and supplies the nominated visible / key materials. The partner specialist supplies the concealed materials and owns the technical design, installation, testing and workmanship warranty — their work is not under ALUMAX's liability. This register makes that split explicit for every package.

Draft — not customer terms

This is an internal coordination framework, not a legal instrument. The liability separation is an operating intent — a disclaimer alone is not enough, so review and draft it with a Sarawak construction lawyer before it appears in any quotation or customer terms.

Jump to any register

Every register, in one place

The critical rule

The specialist signs off the site survey, product compatibility and installation conditions BEFORE ALUMAX releases the material order.

Three layers of responsibility

Who owns what

ResponsibilityALUMAXPartner specialistJoint interface
ProductsSelect and supply the nominated visible / key materialsSupply concealed materials and consumablesConfirm compatibility before ordering
DesignDefine visual intent, location and finishPerform technical design, sizing and installation methodApprove the coordinated shop drawing
InstallationDeliver materials and product instructionsInstall, test, certify and warrant the workmanshipInspect material condition and completed appearance
DefectsMaterial manufacturing defectsWorkmanship, sizing, concealed materials and system performanceInvestigate interface failures before assigning responsibility
The seven packages

What ALUMAX supplies · what the specialist records

Select a package. The specialist confirms the site survey, compatibility and installation conditions on the right before ALUMAX releases the materials on the left.

ALUMAX supplies — visible / key materials

  • Socket and switch faceplates
  • Power tracks and compatible adaptors
  • Selected data faceplates
  • USB or charging modules
  • Decorative control panels
  • Smart switches, where specified

Specialist records before the order is released

  • Existing incoming supply and available capacity
  • Load calculation and appliance load schedule
  • Single-phase or three-phase requirements
  • Distribution-board capacity and spare ways
  • Circuit zoning and dedicated circuits
  • Cable type, size and permissible loading
  • Conduits, trunking, back boxes and junction boxes
  • Required back-box depth for Alumax faceplates
  • Power-track feed, isolator and protective device
  • MCB, RCD/RCBO and surge-protection selection
  • Earthing and bonding
  • Data-cable type, topology and termination
  • Separation and coordination of power and data routes
  • Switch location, two-way switching and dimming compatibility
  • Testing, circuit labels and as-built drawings
  • Completion and test certificates
  • Workmanship warranty

Internal wiring should be by an appropriately registered EIU contractor; testing and certification require the relevant “Authorised to Test” endorsement. Sarawak EIU guidance

Every specialist order

Fifteen fields, on every order

  1. 01Specialist company and named person in charge
  2. 02Registration, competency and insurance details
  3. 03Direct client–specialist contract reference
  4. 04Exact included and excluded work
  5. 05ALUMAX-supplied product schedule with SKU and quantity
  6. 06Specialist-supplied concealed materials and consumables
  7. 07Site conditions and assumptions
  8. 08Specialist compatibility acceptance
  9. 09Approved shop drawing and setting-out
  10. 10Required tests and certificates
  11. 11Interface with other trades
  12. 12Protection and making-good responsibility
  13. 13Variation-pricing method
  14. 14Workmanship warranty and defect contact
  15. 15Signed completion and customer acceptance
The liability distinction

For the separation to be credible

  • The client appoints and contracts the specialist directly.
  • The specialist invoices the client directly for installation.
  • ALUMAX invoices only for its materials and defined design services.
  • The specialist approves compatibility before materials are ordered.
  • The specialist owns technical design, installation, testing and certification.
  • Specialist workmanship warranties are issued directly to the client.
  • ALUMAX does not promise that the specialist's entire installed system is covered by the ALUMAX material warranty.

A disclaimer that “specialist work is not ALUMAX's liability” may not be enough on its own. CIDB defines a contractor broadly — including a person who undertakes or manages construction work — so the actual contracting, payment, marketing and site-control arrangement matters, not just the wording. This structure must be reviewed and drafted by a Sarawak construction lawyer before it is placed in any quotation or customer terms, and contractors undertaking construction work may have CIDB registration obligations within their grade and category.

Before you appoint

Vet the wet-works specialist first.

Structural, finishing and exterior-water work are three different competences. Ten selection KPIs, a responsibility split and mandatory hold points — before the order is placed.

Open the selection register
Product standardisation

Standardising the products, not just the handoff.

The registers that turn a brand into a standardised, buildable specification — decided in the right order, tied to the installation interface.

See the full scope & responsibility system