BETAWe're refining the site during beta testing.UntilShare feedback
Internal · interior finishes

The finish, not the system above it.

For interior ceiling treatment, register the visible finish separately from the concealed framing, suspension, MEP services and structural supports.

CIDB itself treats ceiling and plasterboard installation as a distinct contractor competency — the visible finish is not the concealed system. CIDB contractor competency modules

“Cost” is a relative direction band (Low … High), not a price — no SKUs or RM figures; generic material categories only.

The packages

Ten ceiling treatments, distinct competencies

CEI-PREPCostLow
Existing soffit repair and skim coat
VisualPreserves maximum ceiling height with a clean, flat appearance
UsageSimple maintenance; services remain visible or surface-mounted
ALUMAX may supply

Repair material, skim coat and selected finish

Specialist work

Crack investigation, concrete repair, levelling and moisture treatment

Trap — Skim coating over active cracks or water leakage

CEI-PNTCostLow
Painted exposed ceiling
VisualMinimal or industrial; can be white, dark or colour-zoned
UsageMaximum height and easiest access to services
ALUMAX may supply

Primer, paint colour and finish

Specialist work

Cleaning, masking, surface preparation and coordinated painting of pipes / services

Trap — Exposed services looking accidental rather than intentionally arranged

CEI-FLTCostMedium
Flat gypsum-board ceiling
VisualClean and calm; suitable for most residential rooms
UsageConceals wiring, pipes and lighting components
ALUMAX may supply

Approved boards, perimeter profiles, access panels and finish specification

Specialist work

Suspension, framing centres, jointing, levelling and cut-outs

Trap — Insufficient access or cracking at board joints

CEI-LYRCostMedium–High
Bulkhead, cove or layered ceiling
VisualAdds depth, zoning and concealed lighting
UsageCan conceal beams, ducts and curtain tracks
ALUMAX may supply

Aluminium shadow-gap profiles, LED channels, diffusers and selected boards

Specialist work

Setting-out, framing, lighting recesses and service coordination

Trap — Excessive drops making the room feel low

CEI-WETCostMedium
Moisture-resistant wet-area ceiling
VisualClean flat or modular appearance
UsageSuitable for bathrooms, kitchens and utility areas
ALUMAX may supply

Moisture-resistant gypsum, calcium-silicate, fibre-cement, aluminium or approved PVC panels

Specialist work

Ventilation openings, corrosion-resistant framing, access and moisture control

Trap — Assuming a moisture-resistant board can solve an active roof or plumbing leak

CEI-ACOCostMedium–High
Acoustic tile or acoustic panel ceiling
VisualModular, fabric-like, perforated or seamless
UsageReduces reverberation in offices, TV rooms and meeting spaces
ALUMAX may supply

Acoustic panels, suspension grid and edge profiles

Specialist work

Grid installation, perimeter cuts and coordination with lights and diffusers

Trap — Acoustic-looking products without verified performance

CEI-MTLCostMedium–High
Aluminium or metal ceiling
VisualLinear strip, clip-in, mesh, open-cell or baffle appearance
UsageDurable, washable, removable and suitable for service-heavy areas
ALUMAX may supply

Aluminium panels, profiles, colours and trims

Specialist work

Suspension, module alignment, cut-outs, earthing where applicable and access coordination

Trap — Irregular panel cuts around lights and AC outlets

CEI-SLTCostHigh
Timber or wood-look slatted ceiling
VisualWarm, premium and directional
UsageCan conceal acoustic backing and linear services
ALUMAX may supply

Timber, aluminium wood-look sections, WPC slats and perimeter profiles

Specialist work

Subframe, spacing, alignment, access and material movement allowance

Trap — Real timber movement, humidity damage or inaccessible services

CEI-STRCostHigh
Stretch or luminous membrane ceiling
VisualSeamless, curved, printed or evenly illuminated surface
UsageCan create diffuse feature lighting and conceal uneven slabs
ALUMAX may supply

Selected membrane, perimeter track and lighting components

Specialist work

Site measurement, heat installation, lighting distance, ventilation and access strategy

Trap — Visible LED hotspots or membrane removal required for every repair

CEI-FTRCostHigh
Feature ceiling panels
VisualMirror, laminate, metal, fabric, decorative panel or suspended feature
UsageCreates a focal zone above dining, island, reception or display areas
ALUMAX may supply

Decorative panels, aluminium profiles and selected finishes

Specialist work

Independent supports, fixing, joint layout and load verification

Trap — Hanging heavy features from gypsum-board framing

Before the ceiling is closed

Mandatory coordination register

Before ceiling work starts, record every item passing through or supported above it:

  • Downlights, tracks, pendants and LED drivers.
  • Ceiling fans and chandeliers.
  • AC fan-coil units, ducts, diffusers and return-air paths.
  • Condensate and plumbing pipes.
  • Sprinklers, smoke detectors and emergency systems.
  • CCTV, Wi-Fi access points, speakers and projectors.
  • Motorised curtains and recessed curtain tracks.
  • Access panels and maintenance clearances.

Fans, chandeliers, heavy panels and mechanical equipment need suitable independent structural support — they must not rely on the plasterboard or decorative ceiling frame alone.

Selection by room

Where to start, what to control

RoomRecommended startImportant controls
Living / diningFlat gypsum with one restrained cove, shadow gap or feature zoneClear height, curtain pocket, lighting layout and AC airflow
BedroomFlat gypsum or painted soffitFan position, wardrobe clearance, curtain track and quiet AC operation
KitchenFlat moisture-resistant board or removable aluminium systemHood duct, service access, grease cleaning and cabinet-to-ceiling junction
BathroomAluminium, approved PVC, calcium-silicate or moisture-resistant ceiling systemExhaust ventilation, water-heater access and leak inspection
Utility / storePainted soffit, removable metal or simple board ceilingPipe access and low maintenance
Home officeFlat gypsum, acoustic tile or acoustic panelGlare, video-call lighting and reverberation
Commercial officeModular acoustic grid, baffle or open-cell systemFlexible access to MEP services and future layout changes
Premium display areaLayered, timber slat, metal or luminous ceilingMock-up, joint control and maintenance access
Per ceiling

Ten required configurator fields

  1. 01Room and ceiling-zone identification
  2. 02Slab / roof underside condition
  3. 03Existing and proposed clear ceiling height
  4. 04Ceiling type, level and required drop
  5. 05Board, panel or finish material
  6. 06Lighting type and lighting positions
  7. 07AC, fan, sprinkler, detector, speaker and service coordination
  8. 08Curtain pockets, shadow gaps, perimeter profiles and junction details
  9. 09Access-panel quantity, size and location
  10. 10Material-supply, installation, inspection and warranty responsibilities
Responsibility boundary

Who owns what

ALUMAX
  • Specified visible panels, aluminium profiles, access-panel type and key lighting channels.
  • Approved colour, texture, module and finish.
  • Supplied quantity and material condition.
The specialist
  • Site measurement and soffit inspection.
  • Suspension and framing design.
  • Fixings, anchors, levelling and board joints.
  • Coordination with electrical, AC, plumbing and fire-system specialists.
  • Moisture protection, cut-outs and access panels.
  • Installation safety, workmanship and warranty.
Sign before closing the ceiling

The specialist signs a ceiling and MEP coordination acceptance form before closing the ceiling. Once closed, repositioning a concealed valve, driver, pipe or AC component becomes recovery work, not a simple ceiling correction. Products subject to Malaysian construction-material controls should also be checked for the applicable conformity documentation. CIDB construction materials

The register family

Other registers in this family

Register hub
Interior Ceiling-Treatment Packages | ELS by ALUMAX