How ELS works

Scope & responsibility, made honest.

Who does what, in what order, and who's accountable — across the three ways to work with ELS, every project type, and every trade. The one rule under all of it: responsibility follows the approved quotation, drawings and written scope. Anything not listed is not automatically included.

Choose the engagement

Who does what, by service.

Every route is led by ELS and adds scope as the project gets harder — from resolving the design, to having ALUMAX supply it, to coordinating every trade's information to one plan.

Scroll wide charts sideways →

Compare
1
Design & Specification
You need the design resolved
2
Design & Specification + ALUMAX products
…supplied and installed too
3
ELS+ Renovation Delivery
Several trades affect one another
Best for
Layout · style · material · moisture-zone · lighting · budget decisions
A resolved design you also want made and fitted, with one product interface
Multi-trade work · wet areas · sequencing · whole-room / whole-home risk
The trigger
The product may be known, but the design decisions aren't
You want ELS's spec built by ALUMAX under one product warranty
Cabinets, services and building works interact and must be sequenced
What ELS does
Designs & specifies — layout, materials by zone, lighting & M&E intentions; issues the spec pack + drawings
The same design authorship; the ELS spec drives the ALUMAX quotation
ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.
What ALUMAX does
Optional — quotes the product separately against ELS's spec (any supplier can)
Supplies · installs · warrants its products to the approved spec (FLYHOME RTA + made-to-spec)
Within an ELS+ contract, ALUMAX can supply and install the specified products.
Specialist trades
Client appoints independent specialists. ELS/ALUMAX may recommend or pre-screen candidates but does not appoint them on the client's behalf. ELS recommends the order of the work and checks the hand-offs set in the commissioned scope. Clients using independently appointed contractors must nominate a main contractor responsible for site management and trade coordination.
Appointed separately by you if needed; ELS recommends the order of the work and checks the hand-offs set in the commissioned scope.
Selected contractors and specialist trades. Your contract for the works is with ELS Design and Build; your proposal names each trade and what it supplies. Defects, warranty and payments are set in your proposal.
Measurement
ELS technical site survey where required
ALUMAX product measure + ELS technical site survey
ELS technical site survey + ALUMAX product measurements
Documents you receive
ELS design / specification pack + drawings + material schedule
…that, plus the ALUMAX quotation + product shop drawing
…plus trade matrix · coordination sheets · approval checklist · variation control · QC + handover records
Coordination depth
Design & specification — no multi-trade site coordination
Product interface coordinated; other trades stay separate
Full — interfaces, hold-points & handover to one plan
Pricing structure
An ELS design-authorship fee — a service fee, not a construction price
ELS fee + a separate ALUMAX product quotation
A project-basis quotation for the works in your ELS+ proposal; any design, assessment or management fee is confirmed in your written proposal
You approve
Layout · materials · M&E intentions · drawings
…plus the product quotation · shop drawings
Scope · drawings · materials · work packages · prices · programme
Not automatically included
Product supply, installation, trade execution & site coordination
Multi-trade site coordination (until you step up to ELS+ Renovation Delivery)
Work you appoint separately is outside the ELS+ contract. Anything not written in your proposal is not automatically included.
Choose this when…
The product is clear but the design still needs resolving
You want the design built by ALUMAX with one product-warranty interface
Several trades must follow one approved plan
⚠︎

A product quotation is not a whole-renovation quotation.

An ALUMAX product quotation covers ALUMAX's products only. Under Design & Specification, an ELS fee is a design service fee — never the renovation construction price. Under ELS+, the price of the contracted works is a project-basis quotation set in your proposal, and any design, assessment or management fee is confirmed in your written proposal.

ⓘ

Service route and product tier are different decisions.

The route is how much ELS does. Essential · Signature · Bespoke is a separate axis — the ALUMAX product specification level. FLYHOME is ALUMAX's own Ready-to-Assemble modular cabinetry, supplied and warranted by ALUMAX.

Who does what, by service

The same five questions for each way of working with ELS: who specifies, who supplies, who installs, who coordinates and who warrants.

Design-only commission: ELS Design & Specification

ELS produces the specification and does not build. The rows below say who does the rest.

WorkSpecifiesSuppliesInstallsCoordinatesWarrants
ELS design and specificationELS produces the specificationNot ELS: it does not buildNot ELS: it does not buildDesign and specification only, with no multi-trade site coordinationELS professional-service responsibility, not another party's workmanship
ALUMAX products (cabinetry, doors, windows and the like)ELS, the overall design; ALUMAX, product configuration and detailing for what it suppliesALUMAX, for its own productsALUMAX, for its own productsThe ALUMAX product interfaceALUMAX, on its own products
Other trades (electrical, plumbing, tiling, ceiling, waterproofing)ELS, in the specification these trades work toOther specified suppliers, for theirsEach trade you appointYou appoint them; ELS recommends the order of the work and checks the hand-offs set in the commissioned scope.Each trade you appoint, on its own workmanship

ELS+ Renovation Delivery

ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.

WorkSpecifiesSuppliesInstallsCoordinatesWarrants
ELS design and specificationELS Design & Specification provides the agreed design deliverables.Not part of the design deliverablesNot part of the design deliverablesNot yet statedSet in your proposal
ALUMAX products (cabinetry, doors, windows and the like)ELS, the overall design; ALUMAX, product configuration and detailing for what it suppliesWithin an ELS+ contract, ALUMAX can supply and install the specified products.ALUMAX, for its own productsELS+ can coordinate its timing with other tradesALUMAX, on its own products
Works included in the ELS+ contractELS Design & SpecificationSet in your proposalSelected contractors and specialist tradesELS+, for the works in its contractSet in your proposal

ELS+ works are contracted by ELS Design and Build. Defects, warranty and payments are set in your proposal. Your proposal sets out the contracting parties, the scope by group, payments, milestones and who rectifies each part. Completion, dates and rectification obligations are the ones set in your contract.