What the old house is hiding.

An older Sarawak house has character — and problems you cannot see until you open it up: walls that are not straight or plumb, leaks that have been quietly rotting timber, wiring from another era, termite damage, floors that step between extensions, and windows that no longer seal. ELS surveys the real condition first, plans for what is behind the surface, and recommends a phased sequence so a family can keep living there through it — because in an old house, the expensive surprises are the ones nobody looked for before signing off the finishes.

Start Pre-CheckSee how ELS worksWhatsApp ELS
Your design journey · Older house

What are you planning?

Step 1 / 3

Best for

Where an older-house specification earns its fee in Sarawak conditions.

Older terrace, wooden and mixed-era housesUneven, out-of-plumb walls and floorsA history of leaks, damp or termitesAgeing wiring and old windowsRenovating while the family lives there
Quick decision rules

How to decide before you build

An old house fails on the condition nobody surveyed — not on finish. Settle these before quotation.

IfThen
The walls are uneven or out of plumbMeasure the real condition and detail scribes, packers and tolerances. Cabinets built to a drawing that assumes square will not fit.
There are signs of hidden leaks or dampFind and fix the source before you finish over it. New finishes laid over an active leak fail.
The wiring is oldHave a licensed electrician assess it early, and plan the new layout so the house is rewired once — not opened up room by room later.
There is a history of termitesTreat first, then specify termite-resistant materials — aluminium, treated substrates — in the risk zones. Do not rebuild in the same vulnerable material.
Floors step between old extensionsPlan the transitions deliberately — a ramp, a detailed threshold or an honest level change — for safety and for water.
The windows are old and leak air or waterDecide retrofit versus replace early — it changes the weatherproofing, the light and the ventilation of the whole house.
Behind the surface

Renovate the condition, not the photo.

In an old house, the surface hides the story. The survey — not the mood board — is where an honest renovation begins.

Uneven, out-of-plumb wallsDecades of movement leave walls bowed and floors sloped, so nothing off-the-shelf sits flush.ELS checks: The real condition is measured and cabinetry detailed to tolerance, not to a false square.
Hidden leaks & dampA slow leak rots timber and feeds mould long before it shows on the wall you were about to tile over.ELS checks: The source is investigated and fixed before any new finish goes over it.
Old wiring & servicesWiring from an earlier era rarely matches today's loads or safety, and it is buried behind everything.ELS checks: A licensed electrician assesses it and the layout is planned to rewire once.
Termite history & damageSarawak's climate and timber make termites a recurring threat; damage found is rarely the whole of it.ELS checks: Treatment first, then termite-resistant materials specified in the risk zones.
Retrofit & living through it

New work that meets the old gracefully.

The craft in an old house is in the joins — between eras, between new and old, and between a live household and a building site.

Floor transitions between erasExtensions built at different times leave steps and level changes that trip people and trap water.ELS checks: Transitions detailed deliberately for safety and drainage.
Retrofit vs replace windowsOld windows leak air, water and heat; the choice to retrofit or replace shapes the whole envelope.ELS checks: Opening sizes, weatherproofing and ventilation decided as one call.
Renovating while occupiedA family still cooking, washing and sleeping in the house cannot lose the whole place at once.ELS checks: Work phased and zoned, with dust and noise control and a working kitchen and bath kept live.
Matching new to oldNew cabinetry and finishes can either fight the old house or settle into it — the detail decides which.ELS checks: Junctions and finishes detailed to meet the existing fabric honestly.
Designed for the climate here

The site decides these, not you.

Climate and site conditions that quietly modify the design — checkable actions, confirmed against your home after the survey.

Termite protectionA rural, older or timber-framed home with a termite history.ELS response: No timber-to-ground contact; aluminium or treated carcasses at the base; the substructure treated before new joinery goes over it.ELS field guidance
Humidity & mouldEnclosed joinery, wet zones and still-air corners — everywhere in Sarawak.ELS response: Damp-stable, sealed materials in wet zones; airflow into closed runs; no untreated timber where it stays wet.Industry standard
Flood resilienceThe home sits below a known flood line.ELS response: Sockets, the DB and services raised above the line; aluminium or sacrificial bases below it; a drainage-and-drying detail so one flood does not destroy a whole run.ELS field guidance
How to read our claims

We grade every strong technical claim by its evidence and review them on a schedule. A manufacturer test is not a design lean — we label which is which rather than dress one up as the other.

Manufacturer-testedA figure the product's maker publishes from their own testing or datasheet.
Industry standardEstablished material science or building practice — not specific to one product.
ELS field guidanceWhat ELS has repeatedly seen on Sarawak sites. Experience, not a lab result.
Design recommendationA judgement about how a space should look or feel. Reasonable people may differ.

Claims last reviewed 2026-07-23. Figures are planning guidance, not warranties — real performance depends on the specific product, its installation and the site's exposure, and is confirmed on the product datasheet and after site measurement.

What's included

What the older-house specification covers

ELS surveys and specifies the renovation, recommends the order of the work and checks the hand-offs set in the commissioned scope. ALUMAX supplies and installs the cabinetry. Structural repair, treatment and rewiring sit with licensed trades on a project basis.

Included in the specification
  • A measured survey of the real condition — out-of-square, levels, damp
  • Leak- and damp-source investigation direction before finishing
  • A rewire-once electrical layout, coordinated with a licensed trade
  • Termite-risk material schedule for the vulnerable zones
  • Floor-transition, threshold and window-retrofit direction
  • A phased plan to renovate while the house is occupied
  • Quality checkpoints as hidden conditions are opened up
Not included (coordinated separately)
  • Structural, timber and roof repair — project basis, licensed
  • Active-leak and waterproofing civil remediation — project basis
  • Termite treatment application — licensed pest specialist
  • Rewiring and plumbing — licensed trades
  • Final renovation price — confirmed after survey and quotation
What drives the price

What drives an older-house quote

The specification fee starts from RM1,600 (excl. SST; a four-room house is RM5,600). Because old houses hide conditions, the survey is what makes the build cost honest.

How much hidden condition is foundThe survey helps size the risk, so leaks, rot and termite damage found early can be planned for — in the scope, or from a contingency reserve you hold — rather than found mid-job.
Extent of rewiringWhether a partial update will do, or the whole house needs rewiring to today's loads.
Termite treatment & material substitutionTreatment plus swapping vulnerable timber for termite-resistant materials in the risk zones.
Window scopeRetrofitting seals and hardware versus replacing the windows outright.
Number of phases while occupiedLiving in the house through the works means more phases and dust control, spread against one plan.
Site condition & accessELS technical site survey from RM300 in Sibu, RM500 outstation. Credited in full against a qualifying confirmation within 60 days — conditions apply.

Indicative only — the final quotation follows site measurement, material selection and approved scope. Prices exclude SST.

How to prepare

How to prepare for the Pre-Check

A few things that make the survey faster and the plan more accurate.

  • The rough age and extension history of the house
  • Any known leaks, damp patches or termite activity
  • Where the floors step or slope
  • The condition of the windows and wiring, if you know
  • Whether you will live in the house during works
  • What must keep working — kitchen, bathroom
  • What stays and what is new
Where ELS works

Based in Sibu — elsewhere in Sarawak by quotation.

Sibu as standard. Elsewhere in Sarawak by quotation, subject to schedule and capacity.

SibuKuchingBintuluMiriMukahKapit
Older house renovation in Sarawak

Common questions

Why do cabinets never fit properly in an old house?

Because old walls and floors are rarely square or plumb, and standard cabinetry is built as if they are. Decades of movement leave walls bowed, corners off ninety degrees and floors sloped, so a run built to a drawing that assumes a true rectangle ends up with tapering gaps, doors that will not align and a worktop that is not level. The fix is to measure the real condition first and detail the cabinetry to tolerance — with scribes, packers and adjustable feet planned in — so the finished run looks straight even though the room is not. That survey-first discipline is exactly what an old house needs and a showroom quote skips.

How do you deal with hidden leaks and damp in an old house?

By finding and fixing the source before anything is finished over it. Damp in an old Sarawak house usually has a cause — a failed seal, a cracked pipe, rising moisture or a roof leak — and covering it with new plaster, waterproofing or cabinetry simply hides an active problem that then rots the new work from behind. The survey looks for the source, and only then does the new finish go on. It is slower and less glamorous than painting straight over a stain, but it is the difference between a renovation that lasts and one that shows the same damp patch again.

Should I rewire the whole house?

Have a licensed electrician assess it first — but in an old house it is often wiser to rewire once, as part of the renovation, than to patch it room by room. Wiring from an earlier era may not match today's loads or safety, and it is buried behind walls and ceilings that are open now and closed later. Planning the new electrical layout up front — sockets, lighting, the kitchen and any A/C — means the rewire happens cleanly in one pass, while the walls are already open, instead of forcing you to hack them open again next year. ELS coordinates the layout; the rewiring itself is done by the licensed trade.

We found termite damage — can we just replace the wood?

Replacing the wood without treating the cause just feeds the next generation. In Sarawak's climate termites are a recurring threat, and the damage you can see is rarely the full extent of it. The honest approach is to treat the infestation first — through a licensed pest specialist — and then specify termite-resistant materials in the vulnerable zones rather than rebuilding in the same timber that was eaten. Aluminium cabinetry and treated substrates take the risk out of the wet and ground-contact areas. Rebuilding like-for-like in untreated wood is how a family pays for the same repair twice.

Can we live in the house during the renovation?

Usually yes, if the works are phased and zoned for it. Renovating an occupied house means the family still needs to cook, wash and sleep somewhere clean each day, so the plan keeps a working kitchen and bathroom live while the rest is worked on, seals off the active zone for dust and noise, and moves through the house in stages rather than gutting it all at once. It takes longer than an empty-house job and needs more coordination, but for many families it is the only practical way — and planning for it from the start is far better than discovering halfway that the one working toilet is now behind a wall of tools.

How much does an old-house renovation specification cost?

The Design + Specification service starts from RM1,600 (excl. SST; a four-room house is RM5,600), depending on scope, and an older house usually warrants a proper measured survey because so much is hidden. The ELS technical site survey is from RM300 in Sibu and RM500 outstation. Credited in full against a qualifying confirmation within 60 days — conditions apply. The Design + Specification fee pays for the specification; the survey is charged as above, and Renovation Coordination, if you commission it, is quoted separately. The final build cost is confirmed after the survey. Old houses tend to reveal hidden conditions, so we recommend you keep a contingency reserve of your own — held by you, separate from ELS's fees and from the planned works — and size it from the survey and the trades' quotations. Prices exclude SST.

References

External references for the standards and climate data cited above. ELS is not affiliated with these organisations.

Prepared by George Wong — Founder, ELSFormer senior research engineer, Fortune 500 · Based in Sibu, Sarawak
How ELS coordinates it

The Coordination Blueprint.

Freeze the drawings, order every long-lead item the same day, and the factory lead runs concurrent with demolition and wet works instead of after them.

Older house10 QC hold-pointsSurvey-first

Programme confirmed by ALUMAX on order

The binding constraint here: The hidden-condition survey — what the walls hide governs the whole programme, so it comes before the freeze.

  • A measured survey and a hidden-condition gate run before the design freeze, not after.
  • A contingency window is planned for leaks, rot and termite damage found on opening up.
  • Wiring is rewired once against the new layout; cabinetry detailed to out-of-square walls.
See the full coordination blueprint

Sign in with Google to open the interactive timeline and hold-point library.

Keep planning with ELS

Related ELS services

Every path starts the same way — the free Pre-Check tells you which one your project needs.

Not sure which you need? Start with the free Renovation Pre-Check — two minutes, and your next step is clear.

Start Pre-Check
Survey before you commit

Know what's behind the walls first.