Sibu · Sarawak · Terrace & link house

The middle house, planned for its middle.

A Sarawak terrace or link house is long and narrow, shares two walls, and gets almost no daylight or cross-breeze in its middle rooms — so heat and humidity settle in the core and the rear wet kitchen carries the whole cooking load through one external wall. ELS plans the light path, the air path, the rear wet kitchen and the phasing before any trade starts — so the dark middle becomes usable, the heat has somewhere to go, and you can build it in stages without demolishing your own earlier work.

Start Pre-CheckSee how ELS worksWhatsApp ELS
Your design journey · Mid-terrace house

What are you planning?

Step 1 / 3

Best for

Where a terrace-house specification earns its fee in Sarawak conditions.

Mid-terrace / intermediate link housesLong plans with a dark, stuffy coreA rear wet kitchen on one external wallRenovating in phases, on a budgetOccupied homes renovated room by room
Quick decision rules

How to decide before you build

A terrace house fails on light, air and sequence decisions made before quotation — not on finish. Use these rules first.

IfThen
The middle rooms are dark all dayOpen a light path to the core — a light well, borrowed light or glazed internal doors — before you choose finishes. Downlights do not fix a plan with no daylight.
The house feels hot and still in the afternoonPlan a front-to-back air path and shade the rear / west openings before you size the air-conditioning. Ventilation and shade cut the heat load you then have to cool.
The wet kitchen sits at the rear with one external wallRoute the hood duct the shortest way to that wall and specify an aluminium wet-base — never duct into the ceiling void or recirculate.
Exhaust routes are limited — shared walls, no side accessDecide the hood, dryer and toilet vent paths on the plan first. Cutting a duct through a party wall afterwards is the expensive fix.
You are renovating in phasesFreeze the whole-house scope and M&E once, then build in stages — so wiring, ducts and wet points in phase one already serve phases two and three.
Only the rear is wet; the front stays drySpecify by zone — aluminium at the rear wet run, P6 particleboard or plywood on the dry front — not one material for the whole house.
Light, air & heat

Making a long plan livable.

A terrace house is a tube: light and air only enter at the two ends. The first job is to move both into the middle.

Daylight to the coreThe middle rooms — often the dining and stairs — sit furthest from any window and stay dark and damp all day.ELS checks: A light well, borrowed light or glazed internal doors are planned before finishes, not patched with downlights.
Cross-ventilation front to backWith two shared walls, air only moves if the front and rear openings line up and high-level vents let hot air escape.ELS checks: The air path and stack venting are set on the plan so the core is not sealed still.
Heat accumulationRoof heat, the rear wall and west sun load the house through the afternoon; a sealed core holds it against every surface.ELS checks: Shading and ventilation are decided before A/C, so you cool a lighter load.
Storage down the spineThe long corridor and understair are the most wasted space in a terrace house — and the easiest storage to win.ELS checks: Circulation and built-in storage are planned together so the spine works twice.
The rear wet kitchen & services

One external wall, carrying everything.

At the back of a terrace house, the wet kitchen, drainage and every exhaust compete for one external wall. Coordinating them is the difference between a kitchen that clears and one that sweats.

Wet-base materialThe rear kitchen and yard live with standing water and monsoon damp — board carcasses swell and delaminate here first.ELS checks: ACP or honeycomb aluminium in the wet zone, supplied and installed by ALUMAX.
Hood ducting to the nearest wallSarawak wok cooking throws steam and oil; a long or bent duct, or one dumped in the ceiling, leaves grease on every surface.ELS checks: The shortest duct run to outside air is planned before the ceiling closes.
Drainage falls to the trapIf the rear floor does not fall to the trap, wash-down and rain water pool under the cabinets — the worst place in a humid house.ELS checks: Floor falls and the trap position are coordinated with the wet-cabinet layout.
Dryer, toilet & exhaust routesA shared-wall house has few places to vent a dryer, a toilet fan or a second exhaust — and they cannot all take the same hole.ELS checks: Every exhaust path is assigned on the plan before walls and ceilings close.
Designed for the climate here

The site decides these, not you.

Climate and site conditions that quietly modify the design — checkable actions, confirmed against your home after the survey.

Heat gainWest and east elevations, and glazing struck by the sun.ELS response: Fixed shading sized to the orientation, cutting the load before the aircon runs — the reason a louvre's depth and angle are designed, not chosen for looks.Industry standard
Cross-ventilationA home that wants natural air, not full air-conditioning.ELS response: Breeze-block, louvres and a stack path through a void so air moves without insects or losing security — ventilation designed, not left to a window.ELS field guidance
Haze episodesRegional haze that drops outdoor air quality for days at a time.ELS response: Well-sealed openings that cut infiltration so the home holds cleaner air longer through a haze episode, with a planned point for filtration rather than an afterthought — a design that reduces what gets in, never a health guarantee.ELS field guidance
Rainwater dischargeEvery roof, canopy and hard surface.ELS response: Falls, discharge points and a route to the drain set out on the drawing — the most common local defect is water that ponds because no one planned where it goes.Industry standard

Figures are planning guidance, not warranties. Real performance depends on the product, its installation and the site's exposure; the product datasheet and site measurement confirm it.

Roof heat

Roof heat: four approaches, and when one is not enough.

A hot room under a roof can have more than one cause, and each approach changes a different one. Which suits a roof depends on the roof, so this guide sets them side by side. It names no product and gives no temperature, saving or result.

Reflective coatingWhat it changes: The roof's outer surface: how much of the sun's heat that surface takes in.Not enough on its own when: A cooler roof surface is not the same as a cooler room. What reaches the indoor air depends on the roof assembly, ventilation, existing insulation, the sun and how the home is used. A coating is not a repair for a leaking roof or a waterproofing layer. It is judged as a whole system of substrate, primer and topcoat, and its result can change as the surface ages and gathers dirt.Interfaces ELS specifies: The roof substrate and its primer system; the roof's condition, and any repair or waterproofing needed first; the access and drainage detail around it.
Roof or ceiling insulationWhat it changes: Heat passing from the roof or ceiling into the room below.Not enough on its own when: Insulation does not stop a roof heating up. It does not remove heat that already sits in a closed roof void, and a gap or a crushed section can let heat past it. What is already installed changes what more would add.Interfaces ELS specifies: The ceiling void and its access; the junctions at walls and roof lights; the openings for services and downlights; the air path above the layer.
VentilationWhat it changes: Where hot air in the roof void or the room can leave, and cooler air can enter.Not enough on its own when: Moving air does not cool a roof that is taking in a lot of sun. It needs an inlet, an outlet and a clear path between them, and openings may have to stay closed against rain, haze, insects or for security.Interfaces ELS specifies: The openings at the eaves, ridge or gables; the route through the ceiling void; insect screening and security; where fans and aircon sit.
ShadingWhat it changes: How much sun reaches the roof, wall or glass in the first place.Not enough on its own when: Shade helps only what it falls on, at the hours it falls there. A canopy or louvre sized for one orientation may not cover another elevation or the roof itself, and shade alone does not deal with heat the structure has already stored.Interfaces ELS specifies: The fixing to the structure; the depth and angle drawn for each elevation; drainage and wind on a canopy; the clearance to glazing and roof.

What ELS looks at first The roof type and its condition, including any leak. What insulation is already there. How air can leave the roof void. Which elevations and glass take the sun, and what shades them. The ceiling void, and when the household says the heat is worst.

Which approach, or which combination, suits a roof is decided after a survey. Nothing here promises a cooler home.

What's included

What the terrace-house specification covers

ELS specifies the whole plan, recommends the order of the work and checks the hand-offs set in the commissioned scope. ALUMAX supplies and installs the cabinetry. Some scope is ALUMAX-direct; some is multi-trade on a project basis.

Included in the specification
  • Whole-house long-plan layout with a light and air strategy
  • Daylight, cross-ventilation and heat-clearance direction for the core
  • Moisture-zone material schedule — aluminium wet, P6 / plywood dry
  • Rear wet-kitchen cabinet, hood-duct route and drainage intent
  • Exhaust-route plan for hood, dryer and toilet vents
  • A phasing plan — scope and M&E frozen once, built in stages
  • Quality checkpoints at the end of each phase
Not included (coordinated separately)
  • Structural openings and party-wall works — project basis, licensed
  • Waterproofing / tanking works — project basis, multi-trade
  • Mechanical ventilation system supply — project basis
  • Plumbing and electrical works — licensed trades
  • Final renovation price — confirmed after measurement and quotation
What drives the price

What drives a terrace-house quote

The specification fee is RM5 per sq ft or 5% of job value, whichever is higher; minimum RM1,500. The build cost that follows depends on these.

How you open the core for lightBorrowed light and glazed doors are light; a new light well or roof opening is structural and heavier.
Extent of aluminium cabinetryHow much of the rear run sits in the wet zone and must be ACP or honeycomb aluminium rather than board.
Duct and exhaust complexityDuct length and bends to reach the external wall, and how many exhausts share that wall.
Number of phasesMore phases mean more mobilisations, but let you spread cost against a single frozen plan.
ALUMAX package levelEssential, Signature or Bespoke — product pricing confirmed by ALUMAX after measurement.
Site condition & accessELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job. The best first step is to visit the showroom and book an appointment. For a measure or site visit booked through the showroom, the RM150 fee may be waived, subject to availability.

Indicative only — the final quotation follows site measurement, material selection and approved scope.

How to prepare

How to prepare for the Pre-Check

A few things that make the specification faster and the quote more accurate.

  • A floor plan or rough sketch — mark which walls are shared
  • Photos of the dark middle rooms and the rear kitchen
  • Which rooms overheat, and at what time of day
  • How the hood vents now — outside, ceiling void, or recirculating
  • Your phase order and rough budget per phase
  • Whether you will live in the house during works
  • What stays and what is new
Where ELS works

Based in Sibu — elsewhere in Sarawak by quotation.

Sibu as standard. Elsewhere in Sarawak by quotation, subject to schedule and capacity. Other towns are by arrangement.

KuchingSamarahanSibuBintuluMiri
Terrace house renovation in Sarawak

Common questions

Why is the middle of my terrace house so dark and hot?

A terrace or link house is long, narrow and shares two side walls, so daylight and breeze only enter at the front and rear. The middle rooms — usually the dining area and stairs — sit furthest from any opening, so they stay dark, and without a front-to-back air path the heat that builds up through the afternoon has nowhere to escape. The fix is planned before finishes: a light path to the core (a light well, borrowed light or glazed internal doors) and a cross-ventilation and shading strategy, so you are not relying on downlights and air-conditioning to paper over the plan.

Can I renovate my terrace house in phases?

Yes — and it is often the sensible way to do it on a budget or while living in the house. The key is to freeze the whole-house scope and the M&E (wiring, plumbing, duct and wet points) once, up front, then build in stages against that single plan. That way the electrical and drainage you install in phase one already serve phases two and three. Plan phases to reduce avoidable demolition and repeated work. Phasing without a frozen plan is how people end up chasing the same wall open twice.

Where should the wet kitchen go in a terrace house?

At the rear, against the external wall — because that is where the hood duct can reach outside air on the shortest run and where drainage can fall to a floor trap. The wet-kitchen base, sink run and anything that stays wet should be specified in ACP or honeycomb aluminium, not unprotected board, because board swells in Sarawak's humidity; under the kitchen sink, protected P6 is allowed only with ALUMAX's listed protections and where ALUMAX's site measurement finds P6 suitable. The dry-side cabinetry away from direct water can use P6 particleboard or plywood. The point is to decide the material by moisture zone, and to place the wet kitchen where its services actually work.

Do I have to knock down walls to get more light?

Not always. Before any structural work, there is usually a lighter path: borrowing light from a brighter room through a glazed internal door or a high-level opening, adding a light well or roof opening where the plan allows, or re-planning which rooms sit in the dark core. Structural openings and any work on a party wall are possible but sit on a project basis and involve a licensed trade, so we scope those separately. ELS plans the light strategy first and only proposes structural work where a lighter option genuinely will not do.

How do you deal with limited exhaust routes on a shared-wall house?

By deciding every exhaust path on the plan before walls and ceilings close. A terrace house often has only one external wall at the rear and no side access, so the hood, the dryer, a toilet fan and any second kitchen exhaust are all competing for a few possible outlets — and they cannot share one hole. We map each duct route to a real outlet up front, size it, and coordinate it with the ceiling and cabinet layout, so nothing gets discovered as impossible after the plaster is up. Cutting a new duct through a party wall afterwards is the expensive, disruptive fix we plan to avoid.

How much does a terrace house renovation specification cost?

The Design & Specification service is RM5 per sq ft or 5% of job value, whichever is higher; minimum RM1,500, depending on scope. That fee covers the plan, the material and services specification and the coordination — the final build cost is confirmed after measurement, material selection and an approved scope, and if you phase the work it is quoted against a single frozen plan. ELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job.

References

External references for the standards and climate data cited above. ELS is not affiliated with these organisations.

Prepared by George Wong — Founder, ELSFormer senior research engineer, Fortune 500 · Based in Sibu, Sarawak
How ELS coordinates it

The Coordination Blueprint.

Long-lead items can be ordered once the drawings freeze; cutting and fabrication are released only after the site is ready and the final measurements are taken.

Middle terrace10 QC hold-pointsBaseline

Programme under ELS+: Completion, dates and rectification obligations are the ones set in your contract. Under Style Adaptation, Design & Specification and Bespoke: ELS may prepare/recommend a sequence and identify dependencies, but does not direct labour or assume contractor programme control.

The binding constraint here: The concurrency itself — and party-wall coordination with the neighbours on both sides.

  • The worked baseline above: single-phase M&E, one delivery, one household.
  • Party-wall notice and dust / noise control with the attached neighbours.
  • Rear wet kitchen sets the waterproofing and drainage sequence — and the envelope steps apply too, at terrace scale: no side elevation, but the roof, rainwater goods and the back-lane connection are still yours.
See the full coordination blueprint

Sign in with Google to open the interactive timeline and hold-point library.

Keep planning with ELS

Related ELS services

Not sure which service fits? Start the free Pre-Check. Already know your scope? Enquire directly