BETAWe're refining the site during beta testing.Until Share feedback
Room Decision System — Main Entrance

The ten decisions that shape a main entrance.

Each decision below shows its status: Available now, Requires consultation or Coming soon. Open a comparison where there is one; for the rest, ask ELS. A preference you note here is not a confirmed specification until it is measured and agreed.

10 decisions to settle in this room1 available now9 require consultation
01 · Opening sizeRequires consultation

This decision is covered only in part, or for a different situation; ask ELS about yours.

02 · Opening operationRequires consultation

Interior door operation

Interior door operation — Offset pivotDesign concept
Offset pivot
Interior door operation — Surface slidingDesign concept
Surface sliding

2 options aren't shown yet — coming soon.

This set is for an interior bedroom or study door, never for the main entrance.

03 · Door constructionRequires consultation

This decision is covered only in part, or for a different situation; ask ELS about yours.

04 · Frame and wall substrateRequires consultation

This decision is covered only in part, or for a different situation; ask ELS about yours.

05 · Casing and entrance portalRequires consultation

This decision is covered only in part, or for a different situation; ask ELS about yours.

06 · Weather protectionRequires consultation

This decision is covered only in part, or for a different situation; ask ELS about yours.

07 · Lock and accessAvailable now

You are choosing how the entrance door locks and who can open it: a cylinder deadbolt, a mortice multi-point lock or a digital smart lock, with PIN, fingerprint, card or phone access. Next: compare the opening hardware, then tell ELS who needs access.

Room Scope Builder
08 · Privacy and visibilityRequires consultation

Glazing transparency

Glazing transparency — ClearDesign concept
Clear
Glazing transparency — OpaqueDesign concept
Opaque
Glazing transparency — ReededDesign concept
Reeded

These comparisons are for glazing between rooms — an interior-partition decision, not the entrance door.

09 · Threshold and accessibilityRequires consultation

This decision is covered only in part, or for a different situation; ask ELS about yours.

10 · Finish and entrance lightingRequires consultation

This decision is covered only in part, or for a different situation; ask ELS about yours.

Main Entrance

Settle these decisions before the walls close.