Sibu · Sarawak · Apartment & condo

Every centimetre, and every building rule.

An apartment or condo renovation is a game of density and constraints at once — a compact kitchen, a service yard doubling as the laundry, storage that has to go vertical, and a management office that governs the lift, the renovation hours, the noise and what you are allowed to touch. ELS designs the space to work at that density and plans the whole job around the building's rules — so the unit gains real storage and a workable kitchen, and the works actually get past the management on day one.

Start Pre-CheckSee how ELS worksWhatsApp ELS
Your design journey · Apartment / condo

What are you planning?

Step 1 / 3

Best for

Where an apartment specification earns its fee in Sarawak conditions.

Condos, apartments and high-rise unitsCompact kitchens and diningA service yard used as the laundryBuildings with lift, hour and noise rulesStorage that has to go vertical
Quick decision rules

How to decide before you build

An apartment fails on density and on the building's rules — not on finish. Settle both before quotation.

IfThen
The kitchen is compactDesign the work triangle and full-height, vertical storage before choosing appliances — density is planned, not bought in baskets.
The laundry lives in the service yardSpecify humidity- and weather-tolerant material there and plan drying and ventilation — the service yard is a wet, exposed zone.
The building limits lift use or renovation hoursSequence deliveries and noisy work to the management's rules first. A plan that ignores them stalls on day one.
Sound comes through shared floors or wallsPlan acoustic isolation — flooring underlay and partition build-up — during the renovation. You cannot fix it after handover.
Storage is tight in every roomGo vertical — full-height, over-door and under-bed — and pick one storage tier, not a hundred loose baskets.
The dining area is smallIntegrate it — a banquette, an extendable table or an island edge — rather than forcing in a separate room that does not fit.
Density

Making a compact plan work harder.

In an apartment, floor area is fixed and scarce, so every surface has to earn its place. Density is a design problem, not a shopping problem.

Compact kitchenA small kitchen fails when the work triangle is cramped and storage is shallow — not because it is small, but because it is unplanned.ELS checks: The work triangle and full-height storage are planned before appliances.
Storage densityApartment storage has to go up and into every gap — over doors, under beds, into the understair — or it never fits.ELS checks: Vertical, full-height storage on a single tier, mapped to real hardware.
Compact diningA separate dining room rarely fits a condo; forced in, it wastes the floor a family actually needs.ELS checks: Dining integrated — banquette, extendable or island-edge — to save floor.
Service yard & laundryThe service yard is where laundry, washing and the outdoor air meet — wet and exposed, yet usually left unspecified.ELS checks: Weather-tolerant material and a drying and ventilation plan for the zone.
The building's rules

The unit you own, inside a building you don't.

In a strata building, the renovation has to pass the management before it pleases you. Lifts, hours, noise and shared structure all set hard limits.

Lift & access restrictionsEvery material and every offcut goes up one lift with size, time and protection limits — and back down as waste.ELS checks: Deliveries and material sizes sequenced to the building's access rules.
Renovation-hour & noise rulesMost buildings allow noisy work only in set hours on set days — ignore it and the job is stopped by complaints.ELS checks: A recommended schedule that keeps noisy work to the permitted hours, to reduce the risk of the management halting it.
Sound transferShared floors and walls carry footfall and voices both ways; it cannot be fixed once the finishes are on.ELS checks: Acoustic underlay and partition build-ups planned during the works.
What you cannot touchStructure, facade, wet-area waterproofing membranes and common property are off-limits or the building's own scope.ELS checks: The scope is drawn to respect the strata limits, checked before work starts, to reduce the risk of issues at inspection.
Designed for the climate here

The site decides these, not you.

Climate and site conditions that quietly modify the design — checkable actions, confirmed against your home after the survey.

Heat gainWest and east elevations, and glazing struck by the sun.ELS response: Fixed shading sized to the orientation, cutting the load before the aircon runs — the reason a louvre's depth and angle are designed, not chosen for looks.Industry standard
Haze episodesRegional haze that drops outdoor air quality for days at a time.ELS response: Well-sealed openings that cut infiltration so the home holds cleaner air longer through a haze episode, with a planned point for filtration rather than an afterthought — a design that reduces what gets in, never a health guarantee.ELS field guidance
Cross-ventilationA home that wants natural air, not full air-conditioning.ELS response: Breeze-block, louvres and a stack path through a void so air moves without insects or losing security — ventilation designed, not left to a window.ELS field guidance

Figures are planning guidance, not warranties. Real performance depends on the product, its installation and the site's exposure; the product datasheet and site measurement confirm it.

Roof heat

Roof heat: four approaches, and when one is not enough.

A hot room under a roof can have more than one cause, and each approach changes a different one. Which suits a roof depends on the roof, so this guide sets them side by side. It names no product and gives no temperature, saving or result.

Reflective coatingWhat it changes: The roof's outer surface: how much of the sun's heat that surface takes in.Not enough on its own when: A cooler roof surface is not the same as a cooler room. What reaches the indoor air depends on the roof assembly, ventilation, existing insulation, the sun and how the home is used. A coating is not a repair for a leaking roof or a waterproofing layer. It is judged as a whole system of substrate, primer and topcoat, and its result can change as the surface ages and gathers dirt.Interfaces ELS specifies: The roof substrate and its primer system; the roof's condition, and any repair or waterproofing needed first; the access and drainage detail around it.
Roof or ceiling insulationWhat it changes: Heat passing from the roof or ceiling into the room below.Not enough on its own when: Insulation does not stop a roof heating up. It does not remove heat that already sits in a closed roof void, and a gap or a crushed section can let heat past it. What is already installed changes what more would add.Interfaces ELS specifies: The ceiling void and its access; the junctions at walls and roof lights; the openings for services and downlights; the air path above the layer.
VentilationWhat it changes: Where hot air in the roof void or the room can leave, and cooler air can enter.Not enough on its own when: Moving air does not cool a roof that is taking in a lot of sun. It needs an inlet, an outlet and a clear path between them, and openings may have to stay closed against rain, haze, insects or for security.Interfaces ELS specifies: The openings at the eaves, ridge or gables; the route through the ceiling void; insect screening and security; where fans and aircon sit.
ShadingWhat it changes: How much sun reaches the roof, wall or glass in the first place.Not enough on its own when: Shade helps only what it falls on, at the hours it falls there. A canopy or louvre sized for one orientation may not cover another elevation or the roof itself, and shade alone does not deal with heat the structure has already stored.Interfaces ELS specifies: The fixing to the structure; the depth and angle drawn for each elevation; drainage and wind on a canopy; the clearance to glazing and roof.

What ELS looks at first The roof type and its condition, including any leak. What insulation is already there. How air can leave the roof void. Which elevations and glass take the sun, and what shades them. The ceiling void, and when the household says the heat is worst.

Which approach, or which combination, suits a roof is decided after a survey. Nothing here promises a cooler home.

What's included

What the apartment specification covers

ELS specifies the unit, plans the works around the building's rules, recommends the order of the work and checks the hand-offs set in the commissioned scope. ALUMAX supplies and installs the cabinetry. Some scope is ALUMAX-direct; some is multi-trade on a project basis.

Included in the specification
  • Compact-plan layout that maximises storage density
  • Kitchen work-triangle and full-height, vertical storage spec
  • Service-yard laundry material, drying and ventilation plan
  • Acoustic build-up direction for floors and partitions
  • A works plan sequenced to the building's lift, hour and noise rules
  • Moisture-zone material schedule for the wet areas
  • Quality checkpoints across the fit-out
Not included (coordinated separately)
  • Management approvals, permits and deposits — obtained by the owner
  • Structural, facade and common-property works — not permitted / building scope
  • Wet-area waterproofing membrane — project basis, licensed
  • Plumbing and electrical works — licensed trades
  • Appliance and equipment supply — separate
  • Final renovation price — confirmed after measurement and quotation
What drives the price

What drives an apartment quote

The specification fee is RM5 per sq ft or 5% of job value, whichever is higher; minimum RM1,500. The build cost that follows depends on these.

How much bespoke, vertical joineryDensity is won with tall, fitted storage — the more it is tailored to the plan, the more it costs.
Service-yard scopeA simple laundry line versus a fully specified, ventilated wet service yard.
Acoustic scopeWhether floors and partitions need acoustic build-ups for shared-wall sound.
Access difficultyFloor level, lift size limits and delivery windows all affect the labour to get material in.
ALUMAX package levelEssential, Signature or Bespoke — product pricing confirmed by ALUMAX after measurement.
Site condition & accessELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job. The best first step is to visit the showroom and book an appointment. For a measure or site visit booked through the showroom, the RM150 fee may be waived, subject to availability.

Indicative only — the final quotation follows site measurement, material selection and approved scope.

How to prepare

How to prepare for the Pre-Check

A few things that make the specification faster and the quote more accurate.

  • Your unit floor plan, if you have it
  • The building's renovation guidelines — hours, lift, deposit, what's allowed
  • Which walls are shared with neighbours
  • How the service yard and laundry are used now
  • Your worst storage pain points
  • Any noise problems from neighbouring units
  • What stays and what is new
Where ELS works

Based in Sibu — elsewhere in Sarawak by quotation.

Sibu as standard. Elsewhere in Sarawak by quotation, subject to schedule and capacity. Other towns are by arrangement.

KuchingSamarahanSibuBintuluMiri
Apartment & condo renovation in Sarawak

Common questions

How do you fit enough storage into a small condo?

By designing for density instead of buying baskets. In a compact unit the floor is fixed, so storage has to go vertical — full-height cabinetry, over-door and above-fridge space, under-bed and understair volume, and the shallow gaps most people waste. The trick is to plan it as one coherent storage tier mapped to real hardware, rather than a hundred loose organisers that never quite fit. Planned that way, a small condo can hold far more than it looks, and still feel open rather than crammed. ELS specifies the tier and the hardware; ALUMAX supplies it, with installation included or quoted separately, as ALUMAX's quotation states.

What material should the service yard / laundry be?

Treat it as a wet, exposed zone, because that is what it is. The service yard takes washing water, splashback and outdoor air, so any cabinetry there should be humidity- and weather-tolerant — aluminium rather than board, with corrosion-tolerant hardware — and the space needs a real drying and ventilation plan so damp laundry does not sit in still, humid air. A service yard specified like an indoor dry cupboard is the classic Sarawak mistake: the doors swell, the hinges rust, and the laundry never dries. Specify it for what it actually endures.

Do I need management approval to renovate my apartment?

Almost always. Most strata buildings require the owner to submit the renovation for approval, pay a deposit, and work within set rules on renovation hours, lift use, noise and what may be altered. Getting those permits is the owner's responsibility, but the renovation has to be planned to fit them or it will be stopped. ELS designs the works around the building's guidelines from the start — sequencing noisy trades into the permitted windows and planning deliveries to the lift rules — so the approval process is smooth and the job is not halted by a complaint on day two.

How do you deal with renovation-hour and lift restrictions?

By building them into the works plan before anyone starts. Renovation hours mean the noisy trades — hacking, drilling, cutting — can only run in specific windows, so they are scheduled to those windows and the quieter work fills the rest. Lift restrictions mean every material and offcut has to fit the lift and its protection and booking rules, so deliveries and material sizes are planned accordingly. It is unglamorous, but it is the difference between a job that runs to schedule and one that loses days to stop-work notices and rejected deliveries.

Can you reduce noise from the unit next door or upstairs?

To a degree, and only if it is planned during the renovation. Sound travels through shared floors and walls, and once the flooring and finishes are on, adding isolation means tearing them up again. So while the floor and partitions are open, that is the moment to specify an acoustic underlay beneath the flooring and a heavier or decoupled partition build-up on the noisy walls. It will not make a high-rise silent, but it meaningfully cuts footfall and voice transfer. Retrofitting it after handover is far more disruptive and expensive — which is exactly why it belongs in the plan.

How much does an apartment renovation specification cost?

The Design & Specification service is RM5 per sq ft or 5% of job value, whichever is higher; minimum RM1,500, depending on scope. The fee covers the dense layout, the material and services specification, and a works plan that fits the building's rules; the final build cost is confirmed after measurement, material selection and an approved scope. Management deposits and permits are separate and obtained by the owner. ELS site visit: RM150 local (within 30 km of Sibu centre), payable when booked and credited to your order if you go ahead; outstation visits are quoted per job.

References

External references for the standards and climate data cited above. ELS is not affiliated with these organisations.

Prepared by George Wong — Founder, ELSFormer senior research engineer, Fortune 500 · Based in Sibu, Sarawak
How ELS coordinates it

The Coordination Blueprint.

Long-lead items can be ordered once the drawings freeze; cutting and fabrication are released only after the site is ready and the final measurements are taken.

Apartment / condo10 QC hold-pointsDelivery-constrained

Programme under ELS+: Completion, dates and rectification obligations are the ones set in your contract. Under Style Adaptation, Design & Specification and Bespoke: ELS may prepare/recommend a sequence and identify dependencies, but does not direct labour or assume contractor programme control.

The binding constraint here: Delivery, not lead time — management work-hours, lift booking and delivery slots become the hard gates.

  • The delivery inspection, not the factory lead, is the binding constraint.
  • Every delivery is sized and scheduled to the lift and the permitted work-hours.
  • Acoustic partitions and floor underlay specified into the preparation stages (5–7).
See the full coordination blueprint

Sign in with Google to open the interactive timeline and hold-point library.

Keep planning with ELS

Related ELS services

Not sure which service fits? Start the free Pre-Check. Already know your scope? Enquire directly

Not sure which you need? Start with the free Pre-Check: it suggests which service to ask about.

Start Pre-Check
Design for the space and the rules

Small unit, planned to feel twice the size.