Water inlets and outlets
A starting reference for each water point, set before the walls are chased and tiled.
v1.1 · 14 Nov 2026
ELS planning references
This sheet provides ELS planning references. Final positions and plumbing arrangements must meet applicable Sarawak requirements and the selected fitting’s installation instructions, verified by the appointed plumbing contractor.
This sheet does not establish statutory compliance, and a datum schedule alone is not a plumbing design or an approval. Verification of the plumbing arrangement stays with the appointed plumbing contractor.
The schedule by use
Measurements in millimetres. Each row shows the reference, what the position depends on, and its status.
| Point | ID | Reference value | Status | What the position depends on |
|---|---|---|---|---|
| Washing machine water inlet | WD-01 |
| Planning reference, not verified by ELS | DetailsThe selected machine’s installation sheet governs the position. |
| Point | ID | Reference value | Status | What the position depends on |
|---|---|---|---|---|
| Shower water inlet (the mixer’s hot and cold connections) | WD-02 |
| Planning reference, not verified by ELS | DetailsThe selected mixer’s installation sheet governs the connection positions. |
| WC | WD-03 |
| Planning reference, not verified by ELS | DetailsThe set-out is fixed by the selected pan’s installation sheet. A wall-hung pan needs its frame fixed before the wall is built. |
| Basin (vanity) water supply | WD-06 |
| Planning reference, not verified by ELS | DetailsThe selected basin and tap’s installation sheet governs the position. |
| Basin (vanity) waste outlet | WD-07 |
| Planning reference, not verified by ELS | DetailsThe selected vanity, basin and trap’s installation sheets govern the position. |
| Point | ID | Reference value | Status | What the position depends on |
|---|---|---|---|---|
| Water filter inlet | WD-04 |
| Planning reference, not verified by ELS | DetailsThe selected filter’s installation sheet governs the position. |
| Water heater connections | WD-05 |
| Planning reference, not verified by ELS | DetailsThe height depends on the heater type and model. Its electrical isolator is on the electrical datum sheet. |
The points of each space, for four ELS reference homes, are listed on one page with the electrical points beside them: Points by space
Other project-specific points
Project-specific, with no reference height. Each appears on a project only when it is selected, and none is priced or included automatically.
- WD-P1 Kitchen sink water connectionsThe sink base holds the water connections. How they are reached for servicing or replacement is decided before the base is built.
- WD-P2 Floor trapThe drainage location, and the waterproofing and tile build-up around it. The trap is chosen before the grate.
- WD-P3 Wall-hung pan frameA wall-hung pan needs its frame fixed before the wall is built, so the frame is placed to the selected pan’s installation sheet.
- WD-P4 Utility / mop sink connectionsThe selected sink’s installation sheet fixes the position of its water connections.
- WD-P5 Handheld bidet connectionThe selected fitting’s installation sheet fixes the position.
- WD-P6 Outdoor tapThe selected tap’s installation sheet fixes the position.
- WD-P7 Water tank and pump connectionsThe selected tank and pump’s installation sheets fix the position of their connections.
How a position is measured
Heights are measured from finished floor level (FFL) to the centre of the point. A distance from the wall is measured from the finished wall face to the centre of the outlet. Set FFL from the finished floor build-up, not the slab.
Verification status
Every height and distance on this sheet is a starting reference. None has been verified by ELS against a selected product or on a site.
How to use it
- Decide the fitting first. Read the row of the fitting or appliance you have chosen. A reference is a starting point, and the installation sheet of the selected product governs.
- Share the sheet with the appointed plumbing contractor as a starting reference, before the walls are chased and tiled.
- The contractor confirms each position against the selected fitting’s installation sheet.
The electrical isolators for water heaters and pumps are on the electrical datum sheet. Electrical Datum Joinery datum