Sibu · Sarawak · Apartment & condo

Every centimetre,and every building rule.

An apartment or condo renovation is a game of density and constraints at once — a compact kitchen, a service yard doubling as the laundry, storage that has to go vertical, and a management office that governs the lift, the renovation hours, the noise and what you are allowed to touch. ELS by ALUMAX designs the space to work at that density and plans the whole job around the building's rules — so the unit gains real storage and a workable kitchen, and the works actually get past the management on day one.

Start ELS Pre-CheckSee how ELS worksWhatsApp ELS
Paling sesuai untuk

Where an apartment specification earns its fee in Sarawak conditions.

Condos, apartments and high-rise unitsCompact kitchens and diningA service yard used as the laundryBuildings with lift, hour and noise rulesStorage that has to go vertical
Quick decision rules

Cara membuat keputusan sebelum anda membina

An apartment fails on density and on the building's rules — not on finish. Settle both before quotation.

IfThen
The kitchen is compactDesign the work triangle and full-height, vertical storage before choosing appliances — density is planned, not bought in baskets.
The laundry lives in the service yardSpecify humidity- and weather-tolerant material there and plan drying and ventilation — the service yard is a wet, exposed zone.
The building limits lift use or renovation hoursSequence deliveries and noisy work to the management's rules first. A plan that ignores them stalls on day one.
Sound comes through shared floors or wallsPlan acoustic isolation — flooring underlay and partition build-up — during the renovation. You cannot fix it after handover.
Storage is tight in every roomGo vertical — full-height, over-door and under-bed — and pick one storage tier, not a hundred loose baskets.
The dining area is smallIntegrate it — a banquette, an extendable table or an island edge — rather than forcing in a separate room that does not fit.
Density

Making a compact plan work harder.

In an apartment, floor area is fixed and scarce, so every surface has to earn its place. Density is a design problem, not a shopping problem.

Compact kitchenA small kitchen fails when the work triangle is cramped and storage is shallow — not because it is small, but because it is unplanned.ELS checks: The work triangle and full-height storage are planned before appliances.
Storage densityApartment storage has to go up and into every gap — over doors, under beds, into the understair — or it never fits.ELS checks: Vertical, full-height storage on a single tier, mapped to real hardware.
Compact diningA separate dining room rarely fits a condo; forced in, it wastes the floor a family actually needs.ELS checks: Dining integrated — banquette, extendable or island-edge — to save floor.
Service yard & laundryThe service yard is where laundry, washing and the outdoor air meet — wet and exposed, yet usually left unspecified.ELS checks: Weather-tolerant material and a drying and ventilation plan for the zone.
The building's rules

The unit you own, inside a building you don't.

In a strata building, the renovation has to pass the management before it pleases you. Lifts, hours, noise and shared structure all set hard limits.

Lift & access restrictionsEvery material and every offcut goes up one lift with size, time and protection limits — and back down as waste.ELS checks: Deliveries and material sizes sequenced to the building's access rules.
Renovation-hour & noise rulesMost buildings allow noisy work only in set hours on set days — ignore it and the job is stopped by complaints.ELS checks: Noisy trades scheduled to the permitted windows so work is never halted.
Sound transferShared floors and walls carry footfall and voices both ways; it cannot be fixed once the finishes are on.ELS checks: Acoustic underlay and partition build-ups planned during the works.
What you cannot touchStructure, facade, wet-area waterproofing membranes and common property are off-limits or the building's own scope.ELS checks: The scope is drawn to respect the strata limits — no surprises at inspection.
Apa yang termasuk

What the apartment specification covers

ELS specifies, coordinates and QCs the unit and plans the works around the building's rules. ALUMAX supplies and installs the cabinetry. Some scope is ALUMAX-direct; some is multi-trade on a project basis.

Termasuk dalam spesifikasi
  • Compact-plan layout that maximises storage density
  • Kitchen work-triangle and full-height, vertical storage spec
  • Service-yard laundry material, drying and ventilation plan
  • Acoustic build-up direction for floors and partitions
  • A works plan sequenced to the building's lift, hour and noise rules
  • Moisture-zone material schedule for the wet areas
  • QC hold-points across the fit-out
Tidak termasuk (dikoordinasi secara berasingan)
  • Management approvals, permits and deposits — obtained by the owner
  • Structural, facade and common-property works — not permitted / building scope
  • Wet-area waterproofing membrane — project basis, licensed
  • Plumbing and electrical works — licensed trades
  • Appliance and equipment supply — separate
  • Harga renovasi akhir — disahkan selepas pengukuran dan sebut harga
What drives the price

What drives an apartment quote

The specification fee starts from RM1,500 (excl. SST). The build cost that follows depends on these.

How much bespoke, vertical joineryDensity is won with tall, fitted storage — the more it is tailored to the plan, the more it costs.
Service-yard scopeA simple laundry line versus a fully specified, ventilated wet service yard.
Acoustic scopeWhether floors and partitions need acoustic build-ups for shared-wall sound.
Access difficultyFloor level, lift size limits and delivery windows all affect the labour to get material in.
Tahap pakej ALUMAXEssential, Signature or Bespoke — product pricing confirmed by ALUMAX after measurement.
Keadaan tapak & aksesSibu site measurement from RM300, outstation from RM500 — creditable on confirmation.

Indicative only — the final quotation follows site measurement, material selection and approved scope. Prices exclude SST.

How to prepare

How to prepare for the Pre-Check

Beberapa perkara yang mempercepatkan spesifikasi dan menjadikan sebut harga lebih tepat.

  • Your unit floor plan, if you have it
  • The building's renovation guidelines — hours, lift, deposit, what's allowed
  • Which walls are shared with neighbours
  • How the service yard and laundry are used now
  • Your worst storage pain points
  • Any noise problems from neighbouring units
  • What stays and what is new
Where ELS works

Based in Sibu — across Sarawak by appointment.

SibuKuchingBintuluMiriMukahKapit
Apartment & condo renovation in Sarawak

Soalan lazim

How do you fit enough storage into a small condo?

By designing for density instead of buying baskets. In a compact unit the floor is fixed, so storage has to go vertical — full-height cabinetry, over-door and above-fridge space, under-bed and understair volume, and the shallow gaps most people waste. The trick is to plan it as one coherent storage tier mapped to real hardware, rather than a hundred loose organisers that never quite fit. Planned that way, a small condo can hold far more than it looks, and still feel open rather than crammed. ELS specifies the tier and the hardware; ALUMAX supplies and installs it.

What material should the service yard / laundry be?

Treat it as a wet, exposed zone, because that is what it is. The service yard takes washing water, splashback and outdoor air, so any cabinetry there should be humidity- and weather-tolerant — aluminium rather than board, with corrosion-tolerant hardware — and the space needs a real drying and ventilation plan so damp laundry does not sit in still, humid air. A service yard specified like an indoor dry cupboard is the classic Sarawak mistake: the doors swell, the hinges rust, and the laundry never dries. Specify it for what it actually endures.

Do I need management approval to renovate my apartment?

Almost always. Most strata buildings require the owner to submit the renovation for approval, pay a deposit, and work within set rules on renovation hours, lift use, noise and what may be altered. Getting those permits is the owner's responsibility, but the renovation has to be planned to fit them or it will be stopped. ELS designs the works around the building's guidelines from the start — sequencing noisy trades into the permitted windows and planning deliveries to the lift rules — so the approval process is smooth and the job is not halted by a complaint on day two.

How do you deal with renovation-hour and lift restrictions?

By building them into the works plan before anyone starts. Renovation hours mean the noisy trades — hacking, drilling, cutting — can only run in specific windows, so they are scheduled to those windows and the quieter work fills the rest. Lift restrictions mean every material and offcut has to fit the lift and its protection and booking rules, so deliveries and material sizes are planned accordingly. It is unglamorous, but it is the difference between a job that runs to schedule and one that loses days to stop-work notices and rejected deliveries.

Can you reduce noise from the unit next door or upstairs?

To a degree, and only if it is planned during the renovation. Sound travels through shared floors and walls, and once the flooring and finishes are on, adding isolation means tearing them up again. So while the floor and partitions are open, that is the moment to specify an acoustic underlay beneath the flooring and a heavier or decoupled partition build-up on the noisy walls. It will not make a high-rise silent, but it meaningfully cuts footfall and voice transfer. Retrofitting it after handover is far more disruptive and expensive — which is exactly why it belongs in the plan.

How much does an apartment renovation specification cost?

The Design + Specification service starts from RM1,500 (excl. SST), depending on scope. Site measurement is from RM300 in Sibu and RM500 outstation, creditable on confirmation. The fee covers the dense layout, the material and services specification, and a works plan that fits the building's rules; the final build cost is confirmed after measurement, material selection and an approved scope. Management deposits and permits are separate and obtained by the owner. Prices exclude SST.

References

External references for the standards and climate data cited above. ELS by ALUMAX is not affiliated with these organisations.

Prepared by George Wong — Founder, ELS by ALUMAXFormer senior research engineer, Fortune 500 · Berpusat di Sibu, Sarawak · Last updated: July 2026
How ELS coordinates it

The weeks ELS saves — by ordering, not waiting.

Freeze the drawings, order every long-lead item the same day, and the 8-week factory lead runs concurrent with demolition and wet works instead of after them.

Apartment / condo · ~13–15 weeks10 QC hold-pointsDelivery-constrained

The binding constraint here: Delivery, not lead time — management work-hours, lift booking and delivery slots become the hard gates.

  • The delivery inspection (Gate 6), not the factory lead, is the binding constraint.
  • Every delivery is sized and scheduled to the lift and the permitted work-hours.
  • Acoustic partitions and floor underlay specified into the prep phase.
See the full coordination blueprint

Sign in with Google to open the interactive timeline and hold-point library.

Keep planning with ELS

Related ELS services

Every path starts the same way — the free Pre-Check tells you which one your project needs.

Not sure which you need? Start with the free Renovation Pre-Check — two minutes, and your next step is clear.

Start ELS Pre-Check
Design for the space and the rules

Small unit, planned to feel twice the size.

Renovasi Apartmen & Kondominium Sarawak | ELS