Every centimetre,and every building rule.
An apartment or condo renovation is a game of density and constraints at once — a compact kitchen, a service yard doubling as the laundry, storage that has to go vertical, and a management office that governs the lift, the renovation hours, the noise and what you are allowed to touch. ELS by ALUMAX designs the space to work at that density and plans the whole job around the building's rules — so the unit gains real storage and a workable kitchen, and the works actually get past the management on day one.
Where an apartment specification earns its fee in Sarawak conditions.
Cara membuat keputusan sebelum anda membina
An apartment fails on density and on the building's rules — not on finish. Settle both before quotation.
| If | Then |
|---|---|
| The kitchen is compact | Design the work triangle and full-height, vertical storage before choosing appliances — density is planned, not bought in baskets. |
| The laundry lives in the service yard | Specify humidity- and weather-tolerant material there and plan drying and ventilation — the service yard is a wet, exposed zone. |
| The building limits lift use or renovation hours | Sequence deliveries and noisy work to the management's rules first. A plan that ignores them stalls on day one. |
| Sound comes through shared floors or walls | Plan acoustic isolation — flooring underlay and partition build-up — during the renovation. You cannot fix it after handover. |
| Storage is tight in every room | Go vertical — full-height, over-door and under-bed — and pick one storage tier, not a hundred loose baskets. |
| The dining area is small | Integrate it — a banquette, an extendable table or an island edge — rather than forcing in a separate room that does not fit. |
Making a compact plan work harder.
In an apartment, floor area is fixed and scarce, so every surface has to earn its place. Density is a design problem, not a shopping problem.
The unit you own, inside a building you don't.
In a strata building, the renovation has to pass the management before it pleases you. Lifts, hours, noise and shared structure all set hard limits.
What the apartment specification covers
ELS specifies, coordinates and QCs the unit and plans the works around the building's rules. ALUMAX supplies and installs the cabinetry. Some scope is ALUMAX-direct; some is multi-trade on a project basis.
- Compact-plan layout that maximises storage density
- Kitchen work-triangle and full-height, vertical storage spec
- Service-yard laundry material, drying and ventilation plan
- Acoustic build-up direction for floors and partitions
- A works plan sequenced to the building's lift, hour and noise rules
- Moisture-zone material schedule for the wet areas
- QC hold-points across the fit-out
- Management approvals, permits and deposits — obtained by the owner
- Structural, facade and common-property works — not permitted / building scope
- Wet-area waterproofing membrane — project basis, licensed
- Plumbing and electrical works — licensed trades
- Appliance and equipment supply — separate
- Harga renovasi akhir — disahkan selepas pengukuran dan sebut harga
What drives an apartment quote
The specification fee starts from RM1,500 (excl. SST). The build cost that follows depends on these.
Indicative only — the final quotation follows site measurement, material selection and approved scope. Prices exclude SST.
How to prepare for the Pre-Check
Beberapa perkara yang mempercepatkan spesifikasi dan menjadikan sebut harga lebih tepat.
- Your unit floor plan, if you have it
- The building's renovation guidelines — hours, lift, deposit, what's allowed
- Which walls are shared with neighbours
- How the service yard and laundry are used now
- Your worst storage pain points
- Any noise problems from neighbouring units
- What stays and what is new
Based in Sibu — across Sarawak by appointment.
Soalan lazim
How do you fit enough storage into a small condo?
By designing for density instead of buying baskets. In a compact unit the floor is fixed, so storage has to go vertical — full-height cabinetry, over-door and above-fridge space, under-bed and understair volume, and the shallow gaps most people waste. The trick is to plan it as one coherent storage tier mapped to real hardware, rather than a hundred loose organisers that never quite fit. Planned that way, a small condo can hold far more than it looks, and still feel open rather than crammed. ELS specifies the tier and the hardware; ALUMAX supplies and installs it.
What material should the service yard / laundry be?
Treat it as a wet, exposed zone, because that is what it is. The service yard takes washing water, splashback and outdoor air, so any cabinetry there should be humidity- and weather-tolerant — aluminium rather than board, with corrosion-tolerant hardware — and the space needs a real drying and ventilation plan so damp laundry does not sit in still, humid air. A service yard specified like an indoor dry cupboard is the classic Sarawak mistake: the doors swell, the hinges rust, and the laundry never dries. Specify it for what it actually endures.
Do I need management approval to renovate my apartment?
Almost always. Most strata buildings require the owner to submit the renovation for approval, pay a deposit, and work within set rules on renovation hours, lift use, noise and what may be altered. Getting those permits is the owner's responsibility, but the renovation has to be planned to fit them or it will be stopped. ELS designs the works around the building's guidelines from the start — sequencing noisy trades into the permitted windows and planning deliveries to the lift rules — so the approval process is smooth and the job is not halted by a complaint on day two.
How do you deal with renovation-hour and lift restrictions?
By building them into the works plan before anyone starts. Renovation hours mean the noisy trades — hacking, drilling, cutting — can only run in specific windows, so they are scheduled to those windows and the quieter work fills the rest. Lift restrictions mean every material and offcut has to fit the lift and its protection and booking rules, so deliveries and material sizes are planned accordingly. It is unglamorous, but it is the difference between a job that runs to schedule and one that loses days to stop-work notices and rejected deliveries.
Can you reduce noise from the unit next door or upstairs?
To a degree, and only if it is planned during the renovation. Sound travels through shared floors and walls, and once the flooring and finishes are on, adding isolation means tearing them up again. So while the floor and partitions are open, that is the moment to specify an acoustic underlay beneath the flooring and a heavier or decoupled partition build-up on the noisy walls. It will not make a high-rise silent, but it meaningfully cuts footfall and voice transfer. Retrofitting it after handover is far more disruptive and expensive — which is exactly why it belongs in the plan.
How much does an apartment renovation specification cost?
The Design + Specification service starts from RM1,500 (excl. SST), depending on scope. Site measurement is from RM300 in Sibu and RM500 outstation, creditable on confirmation. The fee covers the dense layout, the material and services specification, and a works plan that fits the building's rules; the final build cost is confirmed after measurement, material selection and an approved scope. Management deposits and permits are separate and obtained by the owner. Prices exclude SST.
External references for the standards and climate data cited above. ELS by ALUMAX is not affiliated with these organisations.
The weeks ELS saves — by ordering, not waiting.
Freeze the drawings, order every long-lead item the same day, and the 8-week factory lead runs concurrent with demolition and wet works instead of after them.
The binding constraint here: Delivery, not lead time — management work-hours, lift booking and delivery slots become the hard gates.
- The delivery inspection (Gate 6), not the factory lead, is the binding constraint.
- Every delivery is sized and scheduled to the lift and the permitted work-hours.
- Acoustic partitions and floor underlay specified into the prep phase.
Sign in with Google to open the interactive timeline and hold-point library.
Related ELS services
Every path starts the same way — the free Pre-Check tells you which one your project needs.
Terrace House Renovation, Sarawak
The long plan, the dark middle, the rear wet kitchen and phased works — planned for a link house.
OpenWet Kitchen Renovation, Sarawak
Aluminium bases, ducting and drainage specified for Sarawak humidity and heat.
OpenPerkhidmatan Spesifikasi Renovasi
Room-by-room specs and a zone-correct material schedule trades can build to.
OpenNot sure which you need? Start with the free Renovation Pre-Check — two minutes, and your next step is clear.
Start ELS Pre-Check