BMHalaman ini belum diterjemahkan ke Bahasa Melayu. Anda sedang membaca teks asal dalam bahasa Inggeris.

Cara ELS berfungsi

Skop & tanggungjawab, dibuat jujur.

Siapa buat apa, dalam susunan apa, dan siapa bertanggungjawab — merentas tiga cara bekerja dengan ELS, setiap jenis projek, dan setiap tred. Satu peraturan di sebalik semuanya: tanggungjawab mengikut sebut harga yang diluluskan, lukisan dan skop bertulis. Apa-apa yang tidak disenaraikan tidak termasuk secara automatik.

Choose the engagement

Who does what, by service.

Every route is led by ELS and adds scope as the project gets harder — from resolving the design, to having ALUMAX supply it, to coordinating every trade's information to one plan.

Scroll wide charts sideways →

Compare
1
Design & Specification
You need the design resolved
2
Design & Specification + ALUMAX products
…supplied and installed too
3
ELS+ — Build & Delivery
Several trades affect one another
Best for
Layout · style · material · moisture-zone · lighting · budget decisions
A resolved design you also want made and fitted, with one product interface
Multi-trade work · wet areas · sequencing · whole-room / whole-home risk
The trigger
The product may be known, but the design decisions aren't
You want ELS's spec built by ALUMAX under one product warranty
Cabinets, services and building works interact and must be sequenced
What ELS does
Designs & specifies — layout, materials by zone, lighting & M&E intentions; issues the spec pack + drawings
The same design authorship; the ELS spec drives the ALUMAX quotation
ELS+ takes responsibility for delivering the works included in its contract, using selected contractors and specialist trades.
What ALUMAX does
Optional — quotes the product separately against ELS's spec (any supplier can)
Supplies · installs · warrants its products to the approved spec (FLYHOME RTA + made-to-spec)
Within an ELS+ contract, ALUMAX can supply and install the specified products.
Specialist trades
Client appoints independent specialists. ELS/ALUMAX may recommend or pre-screen candidates but does not appoint them on the client's behalf. ELS recommends the order of the work and checks the hand-offs set in the commissioned scope. Clients using independently appointed contractors must nominate a main contractor responsible for site management and trade coordination.
Appointed separately by you if needed; ELS recommends the order of the work and checks the hand-offs set in the commissioned scope.
Selected contractors and specialist trades. The contracting party is named in your written proposal, which also names each trade and what it supplies. ELS workmanship cover is 12 months from handover sign-off, for works ELS is contracted to deliver.
Measurement
ELS technical site survey where required
ALUMAX product measure + ELS technical site survey
ELS technical site survey + ALUMAX product measurements
Documents you receive
ELS design / specification pack + drawings + material schedule
…that, plus the ALUMAX quotation + product shop drawing
…plus trade matrix · coordination sheets · approval checklist · variation control · QC + handover records
Coordination depth
Design & specification — no multi-trade site coordination
Product interface coordinated; other trades stay separate
Full — interfaces, hold-points & handover to one plan
Pricing structure
An ELS design-authorship fee — a service fee, not a construction price
ELS fee + a separate ALUMAX product quotation
A project-basis quotation for the works in your ELS+ proposal; any design, assessment or management fee is confirmed in your written proposal
You approve
Layout · materials · M&E intentions · drawings
…plus the product quotation · shop drawings
Scope · drawings · materials · work packages · prices · programme
Not automatically included
Product supply, installation, trade execution & site coordination
Multi-trade site coordination (until you step up to ELS+)
Work you appoint separately is outside the ELS+ contract. Anything not written in your proposal is not automatically included.
Choose this when…
The product is clear but the design still needs resolving
You want the design built by ALUMAX with one product-warranty interface
Several trades must follow one approved plan
⚠︎

A product quotation is not a whole-renovation quotation.

An ALUMAX product quotation covers ALUMAX's products only. Under Design & Specification, an ELS fee is a design service fee — never the renovation construction price. Under ELS+, the price of the contracted works is a project-basis quotation set in your proposal, and any design, assessment or management fee is confirmed in your written proposal.

ⓘ

Service route and product tier are different decisions.

The route is how much ELS does. Essential · Signature · Bespoke is a separate axis — the ALUMAX product specification level. FLYHOME modular cabinetry supplied by ALUMAX, with the supply, installation and warranty scope stated in ALUMAX's quotation.

Siapa melakukan apa, mengikut perkhidmatan

Lima soalan yang sama bagi setiap cara bekerja dengan ELS: siapa menentukan spesifikasi, siapa membekal, siapa memasang, siapa menyelaras dan siapa memberi waranti.

Komisen reka bentuk sahaja: ELS Design & Specification

ELS menghasilkan spesifikasi dan tidak membina. Baris di bawah menyatakan siapa melakukan selebihnya.

KerjaMenentukan spesifikasiMembekalMemasangMenyelarasWaranti
Reka bentuk dan spesifikasi ELSELS menghasilkan spesifikasiBukan ELS: ELS tidak membinaBukan ELS: ELS tidak membinaReka bentuk dan spesifikasi sahaja, tanpa penyelarasan tapak berbilang kumpulan kerjaTanggungjawab perkhidmatan profesional ELS, bukan hasil kerja pihak lain
Produk ALUMAX (kabinet, pintu, tingkap dan seumpamanya)ELS, reka bentuk keseluruhan; ALUMAX, konfigurasi dan perincian produk bagi apa yang dibekalkannyaALUMAX, bagi produknya sendiriALUMAX, bagi produknya sendiriAntara muka produk ALUMAXALUMAX, bagi produknya sendiri
Kumpulan kerja lain (elektrik, paip, jubin, siling, kalis air)ELS, dalam spesifikasi yang menjadi rujukan kumpulan kerja iniPembekal lain yang ditetapkan, bagi produk merekaSetiap kumpulan kerja yang anda lantikAnda melantiknya; ELS mencadangkan urutan kerja dan menyemak serahan kerja yang ditetapkan dalam skop yang ditauliahkan.Setiap kumpulan kerja yang anda lantik, bagi hasil kerjanya sendiri

ELS+ — Pembinaan & Penyampaian

ELS+ bertanggungjawab menyampaikan kerja yang termasuk dalam kontraknya, dengan menggunakan kontraktor terpilih dan kumpulan kerja pakar.

KerjaMenentukan spesifikasiMembekalMemasangMenyelarasWaranti
Reka bentuk dan spesifikasi ELSELS Design & Specification menyediakan hasil reka bentuk yang dipersetujui.Bukan sebahagian daripada hasil reka bentukBukan sebahagian daripada hasil reka bentukBelum dinyatakanDitetapkan dalam cadangan anda
Produk ALUMAX (kabinet, pintu, tingkap dan seumpamanya)ELS, reka bentuk keseluruhan; ALUMAX, konfigurasi dan perincian produk bagi apa yang dibekalkannyaDalam kontrak ELS+, ALUMAX boleh membekal dan memasang produk yang ditetapkan.ALUMAX, bagi produknya sendiriELS+ boleh menyelaraskan masanya dengan kumpulan kerja lainALUMAX, bagi produknya sendiri
Kerja yang termasuk dalam kontrak ELS+ELS Design & SpecificationDitetapkan dalam cadangan andaKontraktor terpilih dan kumpulan kerja pakarELS+, bagi kerja dalam kontraknyaDitetapkan dalam cadangan anda

Bagi kerja ELS+, pihak yang mengontrak dinamakan dalam cadangan bertulis anda. Cadangan anda menyatakan pihak yang mengontrak, skop mengikut kumpulan, pembayaran, pencapaian penting dan siapa yang membetulkan setiap bahagian. Penyiapan, tarikh dan obligasi pembetulan ialah yang ditetapkan dalam kontrak anda.

Terma pakej ELS

Sebut harga ELS sah selama 14 hari dari tarikhnya melainkan dinyatakan sebaliknya. Bayaran bagi pakej ELS ialah 60 / 35 / 5 melainkan cadangan bertulis anda menyatakan jadual yang berbeza: 60% semasa kelulusan untuk diteruskan, 35% sebelum kerja bermula, dan 5% semasa siap secara praktikal. Perlindungan kualiti kerja ELS ialah 12 bulan dari pengesahan serah terima, bagi kerja yang ELS dikontrak untuk dihantar. Tempoh komponen pengilang mengikut dokumen sumbernya. Produk ALUMAX mengikut sebut harga dan terma ALUMAX sendiri. Pihak pekerja yang anda lantik secara langsung mengikut terma mereka sendiri.