BETALaman sedang diperhalus semasa ujian beta.Sehingga Beri maklum balas
Sibu · ShoplotContoh Rekod Projek

Shoplot Reset — façade, lighting, display, cashier

Masalahnya — Dated façade; poor zoning and storage

Julat nilai
cth. Quotation-based
Garis masa
Tidak direkodkan
Bahan
Retained shell · new display + counter systems
Kawalan mutu
Kawalan mutu berperingkat

Project record example — the 13-stage structure a completed ELS project carries. Photography, the QC checklist, the client quote and the after-sales log are added once verified; nothing on this page is presented as real until it is.

Didokumenkan pada 13 peringkat
  1. 01

    Before

    Tertunggak

    5–10 photos

    The room exactly as we found it — the honest starting point.

    5–10 photos · Tertunggak
  2. 02

    Measurement

    Tertunggak

    Measurement sheet

    Every dimension taken on site, not assumed.

    Tertunggak
  3. 03

    Design

    Tertunggak

    Render

    The agreed look, before a single panel is cut.

    Tertunggak
  4. 04

    Technical

    Tertunggak

    Approved drawing

    The signed-off drawing production works to.

    Tertunggak
  5. 05

    Material

    Tertunggak

    Material schedule

    Exactly what goes in — grade, finish and quantity.

    Tertunggak
  6. 06

    Production

    Tertunggak

    2–5 fabrication photos

    The panels being built to the approved drawing.

    2–5 photos · Tertunggak
  7. 07

    Installation

    Tertunggak

    5–10 installation photos

    The fit-out on site, step by step.

    5–10 photos · Tertunggak
  8. 08

    QC

    Tertunggak

    Checklist

    The signed quality checklist — snags and all.

    Signed QC checklist · Tertunggak

  9. 09

    Finished

    Tertunggak

    Professional photography

    The completed room, properly shot.

    Tertunggak
  10. 10

    Client

    Tertunggak

    Short quote / testimonial

    The client's own words, verified before use.

    Verified quote · Tertunggak

  11. 11

    Commercial

    Value band

    An honest range, never a fabricated exact figure.

    e.g. Quotation-based

  12. 12

    Timeline

    Actual weeks

    How long it really took, start to handover.

    Not recorded

  13. 13

    After-sales

    Tertunggak

    Any snag + resolution

    What came back, and how we closed it.

    No snags logged after handover · Tertunggak

Pelanggan

Petikan pelanggan yang disahkan — ditambah setelah projek didokumenkan dan pelanggan meluluskan penggunaannya.

Merancang sesuatu yang serupa?

Mulakan dengan Pra-Semakan percuma — kami akan petakan risiko dan skop yang sesuai.

Mula Pra-Semakan