Multi-unit standardisation — one spec, repeated
Masalahnya — 12 identical units to fit out consistently
Project record example — the 13-stage structure a completed ELS project carries. Photography, the QC checklist, the client quote and the after-sales log are added once verified; nothing on this page is presented as real until it is.
- 01
Before
Tertunggak5–10 photos
The room exactly as we found it — the honest starting point.
5–10 photos · Tertunggak - 02
Measurement
TertunggakMeasurement sheet
Every dimension taken on site, not assumed.
Tertunggak - 03
Design
TertunggakRender
The agreed look, before a single panel is cut.
Tertunggak - 04
Technical
TertunggakApproved drawing
The signed-off drawing production works to.
Tertunggak - 05
Material
TertunggakMaterial schedule
Exactly what goes in — grade, finish and quantity.
Tertunggak - 06
Production
Tertunggak2–5 fabrication photos
The panels being built to the approved drawing.
2–5 photos · Tertunggak - 07
Installation
Tertunggak5–10 installation photos
The fit-out on site, step by step.
5–10 photos · Tertunggak - 08
QC
TertunggakChecklist
The signed quality checklist — snags and all.
Signed QC checklist · Tertunggak
- 09
Finished
TertunggakProfessional photography
The completed room, properly shot.
Tertunggak - 10
Client
TertunggakShort quote / testimonial
The client's own words, verified before use.
Verified quote · Tertunggak
- 11
Commercial
Value band
An honest range, never a fabricated exact figure.
e.g. Quotation-based
- 12
Timeline
Actual weeks
How long it really took, start to handover.
Not recorded
- 13
After-sales
TertunggakAny snag + resolution
What came back, and how we closed it.
No snags logged after handover · Tertunggak
Petikan pelanggan yang disahkan — ditambah setelah projek didokumenkan dan pelanggan meluluskan penggunaannya.
Mulakan dengan Pra-Semakan percuma — kami akan petakan risiko dan skop yang sesuai.
Mula Pra-Semakan